• 제목/요약/키워드: Environmental management cost

검색결과 889건 처리시간 0.03초

우리 나라 기업의 환경성과평가 실태 연구 (An Empirical Survey on the Current Practices of Environmental Performance Evaluation in Korean Firms)

  • 성백서
    • 품질경영학회지
    • /
    • 제30권3호
    • /
    • pp.203-236
    • /
    • 2002
  • Environmental Performance Evaluation(EPE) is a key process of Corporate Environmental Management. This paper presents the results of an empirical survey on the status of current practices in EPE of Korean firms. Based on a corporate environmental management(CEM) model, which is initially developed by Hibbitt and Kamp-Roelands(2001) and modified in terms of EPE, the survey is peformed on the population of Korean firms, which are composed of firms certified as "environmentally friendly" by Korean government and/or certified under Is014001, and compares its results with those of Europe's. Although the relatively low response rate and some methodological limitations makes us be cautious about the interpretation, the results shows many interesting aspects of the current states of Korean firms' EPE practices. That is, the levels of EPE implementation in the environmentally-leading companies of Korea are almost the same as that of European companies, I. e., in the-final-part-of-developing-stage (3rd stage) level of the CEM model. It is also shown that as In Europe's case, Korean firms are also moving slower in external relationships than in internal control and management, are more developed in the parameters like environmental policy, Internal control, Information system, which are requirements of certification under Is014001, than in parameters like life cycle analysis and full cost accounting, which requires more research efforts, etc.orts, etc.

환경영향평가 협의내용의 사후관리 합리화방안 연구 (Introduction to the Rationalized Environmental Monitoring Systems)

  • 한상욱;최재용;이춘원;김임순;전숙진;한정희
    • 환경영향평가
    • /
    • 제9권2호
    • /
    • pp.119-126
    • /
    • 2000
  • Environmental monitoring system has been adopted and supplemented as inspection measures for the quantitative and qualitative changes of environmental impact assessment (EIA). Meanwhile it has been continuously pointed out that there is insufficient connection between environmental monitoring system and EIA. Often the agreed environmental impact assessment has not been fulfilled due to the argument of the cost, timing and situations of construction sites. Thus the purpose of this study is in search of the rationalized environmental monitoring system in order to harmonize the development and environmental conservation through the improvement of unreasonable aspects of the current EIA execution process. As to comply with the purpose, this research was carried out with three different but complimentary sources: environmental laws and regulations, foreign case studies of Japan, U.S.A. and Canada, and interviews with 73 experts. Finally, improved environmental monitoring system has been introduced reflecting the present process of EIA.

  • PDF

지각방사선(라돈) 참조준위별 저감 대책에 따른 비용 편익 분석 (Cost-benefit Analysis on Occupational Reference Levels for Radon)

  • 최은희;정은교;김수근;정명희
    • 한국산업보건학회지
    • /
    • 제29권1호
    • /
    • pp.57-68
    • /
    • 2019
  • Objective: The purpose of this study is to propose the benefits of reduction measures according to the occupational radon reference level in order to present basic data for radon management guidelines considering domestic circumstances. Methods: This study uses radon data measured in the subway stations from 2015 to 2016. Of the total of 4,643 cases, 4,231 cases were analyzed excluding the 412 cases where the values were below $300Bq/m^3$. Results: Cost-Benefit analysis was done on the results of the field survey on subway work sites. At the exposure level of $400Bq/m^3$, the ratio between the cost and the benefit was highest at 1 : 1.81(the cost was KRW 1,398,568,032, while the benefit KRW 2,5248,772,841). At the exposure level of $600Bq/m^3$, the ratio of cost and benefit was 1: 1.80, at $300Bq/m^3$ it was 1.72, at $800Bq/m^3$ it was 1.71, at $200Bq/m^3$ it was 1.54, and at $100Bq/m^3$ it was 1.40. Conclusions: Radon management in the workplace provides economic benefits and appropriate reduction strategies are needed. In addition, it is necessary to establish and distribute radon exposure assessment procedures and guidelines for the safety and health of employees when exceeding the exposure standard, and guidelines for radon management in the workplace should be established.

국내 기초자치단체 하수도 원인자부담금 현황 및 특성 분석 연구 (Research on status and characteristics of wastewater discharger cost in Local Government)

  • 임지열;이동현;길경익
    • 한국습지학회지
    • /
    • 제25권4호
    • /
    • pp.230-236
    • /
    • 2023
  • 하수도 시스템은 공공서비스의 개념 및 습지 등 수환경 보호를 위해 지속적으로 보급이 이루어졌으며, 그 결과 하수도 운영기관의 경영 악화를 초래하였다. 이에 중앙정부 주도하에 하수도 운영기관 경영 효율화를 위해 다양한 하수도 정책을 추진하고 있다. 그 중 중점적인 사항은 비용과 관련된 것이며, 대표적으로 하수도 요금 및 하수도 원인자부담금 등이 있다. 본 연구에서는 국내 기초자치단체 71곳의 하수도 원인자부담금 현황 및 특성을 분석하였다. 그 결과, 1,000,000원/m3 ~ 2,000,000원/m3 이하가 41곳(57%)으로 가장 많은 것으로 나타났으며, 평균값 1,990,653원/m3 (중앙값 1,918,000원/m3 )으로 나타났다. 또한, 하수도 원인자부담금이 높아질수록 하수도 원인자부담금의 증가율이 높아지는 것 경향을 보였다. 하수도 원인자부담금과 상대적으로 상관성이 높은 기초자치단체 특성 인자는 하수도 요금현실화율과 재정자립도로 분석되었다. 본 연구의 결과는 하수도 원인자부담금의 기초자료로 활용될 수 있으며, 하수도 원인자부담금 적정 수준 산정 방안에 관한 후 속 연구가 필요하다.

중국 사막지역의 방풍책 높이와 공극률에 따른 방풍효과 및 설치비용 비교분석 (Comparative Analysis of Windbreak Effect and Installation Cost of Sand Barrier with Different Height and Porosity on Sand Land in China)

  • 박기형;정국동;방엄령;김찬범;오빈;포암봉;고엄뢰;정성철;문강민
    • 한국환경복원기술학회지
    • /
    • 제15권6호
    • /
    • pp.29-41
    • /
    • 2012
  • This study was conducted in Ningxia Hui autonomous region, located at southern part of Mu Us sand land in China. To investigate relationships between windbreak effect and installation cost of sand barriers, plastic net is utilized by using four kind of heights (0.2, 0.3, 0.4 and 0.5m) and four kind of porosities (20, 30, 50 and 70%). These heights and porosities are measured for estimating distances for effective windbreak. It is shown that porosity and the distance have a positive relationship at same heights and porosity on ground indicates a constant figure when height reaches a certain level, regardless of the porosity. This implies that there is a difference of level of windbreak with different porosities; however, distance of windbreak effect is same at the same height of sand barrier. As a result of comparison between porosity of sand barrier on the ground and installation cost in each sand barrier with various heights and porosities (16 combinations), 0.4m and 0.5m height sand barriers describe highest economical efficiency. Within two variables, we concluded that height has a higher impact on windbreak effect than porosity.

활동기준원가계산법을 이용한 외식업소 메뉴 원가 산출 (Application of Activity-Based Costing (ABC) to Restaurant Menu Costing)

  • 이봉식;최미경;신서영
    • 한국식품조리과학회지
    • /
    • 제23권1호통권97호
    • /
    • pp.90-98
    • /
    • 2007
  • The purpose of this study was to apply the activity-based costing (ABC) model to restaurant menu costing. The overhead cast of six entr${\acute{e}}$es in XYZ restaurant was calculated for all levels of activity. When comparing activity-based costing with traditional costing applied to BBQ pork rib and an assorted seafood platter, the total difference of costs between two items was 2,191 won in activity-based costing and 600 won in traditional costing. The average food cast percentage of the six entr${\acute{e}}$es was 27% using traditional costing, while the average activity-based cost percentage was 40%. Therefore, there was a 13% difference between the actual margin volume and the expected margin volume. The application of activity-based costing to the restaurant industry would be a milestone from a cost point of view as well as from a process point of view. In particular, the limitation that traditional costing only accounts for food costs could be overcome b considering the overhead cost as an important part of the cast structure. Furthermore, activity-based costing would not only help to reduce the costs associated with the process of analyzing the activities but it would also provide more accurate cost information for menu pricing.

가로수 조성 유형에 따른 비용편익 비교 분석 (Cost-Benefit Analysis for Planting Type of Street Trees)

  • 김준순;이동근
    • 한국환경복원기술학회지
    • /
    • 제17권6호
    • /
    • pp.29-37
    • /
    • 2014
  • The objective of this study is to estimate the cost and benefits of street trees for their planting types, specifically, single row, single row+bottom, double row, double row+bottom. Different planting types are compared and analyzed by using Net Present Value (NPV) and benefit-cost ratio (BCR). Existing data are collected from the literature reviews for the use of meta-analysis method for estimating cost and benefit. The elements for analyzing costs are management and planting costs, and benefits are air purification, energy saving and landscape view. The discount rate is applied at a minimum of 3% and a maximum of 5.5%. The unit used in this calculation is km/year. The result shows that the net benefit is highest in double row, followed by single row, double row+bottom, and single row+bottom. The BCR is the highest in double row, followed by single row, double row+bottom, and single row+bottom. The BCR reaches the break-even point from 9 to 17 years depending on the planting types.

RELIABLE ROLE OF NUCLEAR POWER GENERATION UNDER CO2 EMISSION CONSTRAINTS

  • Lee, Young-Eal;Jung, Young-Beom
    • Nuclear Engineering and Technology
    • /
    • 제39권5호
    • /
    • pp.655-662
    • /
    • 2007
  • Most decision makers in the electricity industry plan their electric power expansion program by considering only a least cost operation, even when circumstances change with differing complexities. It is necessary, however, to analyze a long-term power expansion plan from various points of view, such as environmental friendliness, benefit of a carbon reduction, and system reliability, as well as least cost operation. The objective and approach of this study is to analyze the proper role of nuclear power in a long-term expansion plan by comparing different scenarios in terms of the system cost changes, $CO_2$ emission reduction, and system reliability in relation to the Business-As-Usual (BAU). The conclusion of this paper makes it clear that the Korean government cannot but expand the nationwide nuclear power program, because an increased energy demand is inevitable and other energy resources will not provide an adequate solution from an economic and sustainability point of view. The results of this analysis will help the Korean government in its long-term resource planning of what kinds of role each electric resource can play in terms of a triangular dilemma involving economics, environmental friendliness, and a stable supply of electricity.

Framework to Compute Vehicle Emission Costs Associated with Work Zones

  • Shrestha, K. Joseph;Adebiyi, Jeremiah;Uddin, Mohammad Moin;Sturgill, Roy
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.952-959
    • /
    • 2022
  • Active construction work zones will result in longer travel time and/or longer travel distances for road users because of reduced speed limits and/or detours. This results in increased fuel consumption and increased emissions of harmful gases such as Carbon Monoxide (CO), Nitrogen Oxides (NOx), and Sulfur Oxides (SOx), which causes discomfort to the environment and road users around the work zone. The impact of such emissions should be considered while designing work zones or determining the number of days the roadway will be allowed to be closed partially or fully. This study develops a methodology to compute additional road user costs associated with such work zones. To achieve this goal, a) an extensive literature review is conducted, b) a framework to compute emission cost is developed, c) emission rates are computed for all counties (95) of the state of Tennessee, and d) a case study is conducted to demonstrate the use of the framework to estimate the additional impact of emission because of the work zone. For the case study conducted, the emission cost was computed to be $10,653.60 for the duration of the project. State DOTs can account for such road user costs while selecting contractors using A+B bidding. Accounting for such impact of emission will also indicate the agency's willingness to consider sustainability as a part of the business practices.

  • PDF

건설 신기술의 원가산정기준 개선방안에 대한 연구 (A Study of Improvements in the Standards of Cost Estimate for the New Excellent Technology in Construction)

  • 이주현;태용호;백승호;김경민
    • 한국건설관리학회논문집
    • /
    • 제23권5호
    • /
    • pp.65-76
    • /
    • 2022
  • 국내 건설기술의 발전을 도모하고 국가경쟁력을 제고하기 위한 목적으로 1989년 도입된 건설 신기술 지정제도는 심사과정에서 신기술의 원가계산서를 검토하고, 설계·시공 공사비, 유지관리비 등 비용절감효과와 공사기간 단축 효과를 경제성 항목으로 평가하고 있다. 그러나 이 과정에서 고유기술에 대하여 공사비산정기준관리기관과 신기술 개발자간의 의견차이가 빈번히 발생하고 있으며, 또한 현행 신기술에 대한 원가산정기준이 단위수량당 소요량만을 제시하는 방식으로 생산성에 대한 정보가 부재하여 기존 유사 기술과의 공사기간에 대한 객관적인 비교가 어려운 실정이다. 본 연구에서는 건설 신기술 심사 시 원가산정기준 검토절차와 심사기준, 신기술 품셈 작성방법 등 현황을 분석하고 해외 원가산정기준과 비교하여 현행 건설 신기술의 원가산정기준 개선방안을 제시하였다. 제시한 개선방안은 작업조 기반의 생산성 정보를 제공하고, 적용단가를 제시하여 원가기준의 투명성을 확보할 수 있도록 구성하였으며, 신기술의 특성을 고려하여 재료비와 기계경비에 대한 원가정보 역시 제공할 수 있도록 하였다. 본 연구의 개선된 원가산정 기준을 통해 발주자에게 신기술에 대한 원가정보를 현행보다 세부적으로 제공하고, 공사비 산정 과정을 보다 간소화함으로써 건설 신기술의 활용과 현장적용성을 향상시킬 수 있으리라 기대된다.