A Comparative Study on the Local Governments' Environmental Impact Assessment Regulations in Korea (지방자치단체 환경영향평가 조례 비교 연구)

  • Sung, Hyun-Chan;Min, Soo-Hyun
    • Journal of Environmental Impact Assessment
    • /
    • v.12 no.3
    • /
    • pp.137-150
    • /
    • 2003
  • This study aims to survey whether local governments have legislated laws and regulations on environment impact assessment system, to compare and analyze specific projects and their scale, assessment items, and procedures & discussion process, to identify issues and generate improvement plans, and to suggest a direction for future legislation to local governments that plan to legislate laws and regulations in the future. Major outcome of the study are as follows. First, terminologies used for environment impact assessment by local governments need to be unified. Also, laws and regulations need to be legislated soon. Second, in "urban development project" areas, a total of nine project areas including "quarrying of soil and stone, sand, gravel, and minerals" was essential common projects. A total of six project types were added or newly established compared to national systems. Among them, four project types were added within national-level project areas and two project types were not available under the national-level project areas and newly added due to the nature of local governments. Third, in terms of project scale, scale enhancement of "urban development project" was most common. Analysis showed that in case of clean natural environment such as Cheju Island, it is necessary to consider reinforcing project areas where development activities take place directly in forests or rivers such as "industrial base and complex development", "water resource development", and "development of tourism complex." Fourth, the discussion and review procedures of assessment reports were similar to those at government level. However, in case of Seoul city, it is required to write a "preparation plan" before drafting an assessment report. The city features partial introduction of scoping and screening, which allows to exempt discussion procedures if impact on environment is found to be minimal after drafting the assessment report. In case of national-level, it has a dual system that is split between Ministry of Construction and Transportation and Ministry of Environment. However, in case of environment impact assessment of local governments, it is a single system where city mayors and provincial governors are in charge of both project execution and environmental assessment. Therefore, the most important task is how to satisfy objectiveness and accountability.

Environmental Impact Assessment and Environmental Monitoring in Korea (한국에서의 환경영향평가와 환경측정)

  • Kang, In-Goo;Kim, Myung-Jin
    • Journal of Environmental Impact Assessment
    • /
    • v.4 no.3
    • /
    • pp.31-39
    • /
    • 1995
  • Environmental Impact Assessment (EIA) is composed of various procedures, such as screening, scoping, inventory survey, prediction, assessment, alternative assessment, mitigation measures, and post management. Environmental monitoring data for air quality or water quality, etc. is applied in the EIA process, especially in prediction and post management. As an effective tool of environmental monitoring, the remote sensing method, introduced recently, was used in collecting nationwide data concerning ecosystem and land use. This article explains the current monitoring status in Korea. Monitoring factors include air quality, water quality, soil, ocean, odor, noise, and ecosystems. This report explains the organization of the environmental monitoring system managed by the Ministry of Environment in Korea. Furthermore, it shows the environmental criteria and environmental policies applied to EIA in Korea.

  • PDF

A Study on the Issues and Improvement of the Existing Environmental Impact Assessment System - Evaluation in an operator Viewpoint - (현행 환경영향평가 제도의 문제점과 개선방안 - 실무자적 관점에서 검토 -)

  • Lee, Seung-Won;Kim, Jung-gun;Seo, Jung-Kuk
    • Journal of Environmental Science International
    • /
    • v.27 no.5
    • /
    • pp.281-289
    • /
    • 2018
  • The Korean environmental impact assessment(EIA) system, and explored ways to improve it as a more efficient and viable institution relevant to the demand of our time and conditions in study. The first problem this study identified is found in the fact that the party to write up the assessment report is itself the business operator or the one who is planning to work out the business plan. This structure translates into placing an order with an agent for EIA report. The reporting job may br subcontracted to the agent at a cost far below the rate specified in the 'Standard for Estimate of Agency Fee for Environmental Impact Assessment.' This practice also causes the vicious circle of producing a report that is written to justify the project or business in question or it leads to rough-and ready and poor documentation to minimize the time required. Second, in order to achieve the goal of the plan or business, which is the target of EIA, the local residents tend to ve regarded as an obstacle. This means elimination of the local people from participating in the EIA or their opinion being frequently ignored. This is the seed of distrust and hostility that sometimes provoke disagreements or fierce conflicts. The first proposal to improve these problem is to improve the factors that cause poor documentation of the assessment report as well as improve the understanding of the EIA system. This study proposes the following measures for improvement. The agency cost for EIA should be paid by the business operator or a third party that can ensure faithful implementation of the payment. A system should be established to verify transparent estimation of the agency cost. In order to enhance the professional quality of EIA agents, there should be implementation of qualification test for industrial engineer of related engineers in addition to the current EIA Qualification Test. The second proposal for improvement is to improve the citizen participation process by instituting a legal framework to make clear the purpose of the briefing session for local residents, which is held as a procedure of EIA, and to ensure more positive publicity during the stage of listening to the opinion of the local community. For a smooth and rational communication process, a moderator and a communicator of opinion, as is the case in a public hearing, could be instituted to clearly get the purpose of the briefing session across to the residents and to help to carry out the explanation and Q & A sessions according to the categories of the opinion of the residents. At present, the notification of the public inspection of the draft of the assessment report and briefing session for the residents is made on the newspaper and internet network. But some people have difficulty with access to this method of announcement. A higher participation rate could be secured if a legal provision is added to specify putting up placards in specific places such as the entrance to the place for the briefing session for residents or the building of administrative agencies of the area concerned.

A Study on Ecological Evaluation of Habitat Suitability Index using GIS - With a case study of Prionailurus bengalensis in Samjang-Sanchung Road Construction - (GIS를 이용한 서식지적합성지수(HSI)의 생태영향평가 활용방안연구 - 삼장-산청 국도건설공사를 사례에서 삵을 중심으로 -)

  • Lee, Sang-Don;Kwon, Ji-Hye;Kim, Ah-Ram;Jung, Ji-Hyang
    • Journal of Environmental Impact Assessment
    • /
    • v.21 no.5
    • /
    • pp.801-811
    • /
    • 2012
  • For biodiversity conservation, Biological Impact Assessment is very important. The focus of the study is to enhance efficient Environment Impact Assessment(EIA) based on collecting existing information of endangered species covering the status survey, estimation of effects and reducing methods. Habitat Suitability Index(HSI) can be applicable to Ecological Impact Assessment and finding various reducing methods based on estimating effects. For this study, the EIA report of Samjang - Sanchung highway construction was chosen as an example and Prionailurus bengalensis euptilura as an endangered species was chosen to assess the ecosystem impact on road construction. Water, road, ground coverage, slope, altitude as variables of habitat were weighted and final HSI map was calculated using Arc map and Arc view. Through comparing of before and after HSI, quantitative estimating on effects was possible to minimize impact of road construction to wildlife habitat.

Analysis of Problems and Improvement of Environmental Impact Assessment in Social-Economic Items Based on 19 Major Large Scale Development Projects (주요개발사업의 환경영향평가서 분석을 통한 사회경제항목평가의 문제점과 개선방안)

  • Lee, Sang-Don
    • Journal of Environmental Impact Assessment
    • /
    • v.13 no.4
    • /
    • pp.165-185
    • /
    • 2004
  • Assessment in Socio-economic items should be used to estimate social influence when policies and projects were introduced. To estimate current situation of socio-economic items 19 Environmental Impact Statement (EIS) of large scale projects were analyzed. The projects were selected based on magnitude of social impact when the projects were implemented. Environmental Impact Statement was categorized into line projects(road construction, railroad construction, stream development, etc), and surface projects(energy development, wetland reclamation, recreation and sport development, and housing and residential development, etc) thus being chosen for 19 projects in each categories. This report was based on the analysis of 7 items in socio-economic environmental items(i.e., population, residents, industry, public facilities, education, transport and historical monument). Most EIS did not follow the regulation suggested by Ministry of Environment, and only current circumstances were briefly described. Indifference of in-depth analysis of socioeconomic environmental items would influence the process of social and environment impact negatively in the midst of construction of National Projects such as Outer Circle Seoul Highways, Saemankeum Reclamation Projects, etc. This abrupt halt of construction was mostly based on a lack of public hearing or public participation. Socio-economic items are also very much lacking in quantitative method and strengthening socio-economic environmental items is needed via checklist or matrix that brings decision-makers better ideas objectively.

A Study on the Preparation of Distribution Table for Quantitative Evaluation of Small-Scale Environmental Impact Assessment

  • Dong-Myung CHO;Ju-Yeon LEE;Woo-Taeg KWON
    • Journal of Wellbeing Management and Applied Psychology
    • /
    • v.6 no.3
    • /
    • pp.13-18
    • /
    • 2023
  • Purpose: The small-scale environmental impact assessment has been in operation since its implementation in August 2000, and is a system that meets the purpose of sustainable development in consideration of the environment in areas requiring conservation. However, when preparing a small environmental impact assessment report, the contents of the reduction measures are too qualitative, or reports are prepared to simply list the compliance stipulated by individual laws, and the contents of consultations prepared by consultative agencies and review agencies are not much different. In addition, the direction of consultation on development projects for similar locations of the same project type is frequently changed by reflecting the subjective judgment of the consultative officer of the Ministry of Environment (Environment Agency). Therefore, this study attempted to improve the establishment of measures to reduce the existing simple listing of qualitative contents and the inconsistent presentation of review opinions by consultative agencies and review agencies. Research design, data and methodology: The research method extracted absolute evaluation items and relative evaluation items among small environmental impact assessment items, analyzed and presented detailed items, and prepared a distribution table for each section according to the details of the relative evaluation items, and presented them as a table. Results: This study was conducted to derive uniform results with objective indicators in the preparation and consultation process of a small-scale environmental impact assessment. Conclusions: Once a quantitative evaluation is established, the consultant can objectively determine and process the environmental impact.

Preparation of Radiological Environmental Impact Assessment for the Decommissioning of Nuclear Power Plant in Korea (국내 원전 해체시 방사선환경영향평가 방안)

  • Lee, Sang-Ho;Seo, Hyung-Woo;Kim, Chang-Lak
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.16 no.1
    • /
    • pp.107-122
    • /
    • 2018
  • Kori unit 1, the oldest commercial nuclear power plant in South Korea, was permanently shut down in June 2017. There are a lot of things to consider in decommissioning nuclear power plants, and one of them is the radiological environmental impact assessment. Performed to promote the health and safety of residents around the nuclear power plant, radiological environmental impact assessment aims to confirm that off-site radiological dose from radioactive material released from the facility does not exceed the regulatory criteria. There are three main parts of environmental impact assessment: pre-decommissioning environmental monitoring, environmental monitoring during decommissioning, and impact on nearby residents. At present, although the Korea Nuclear Safety Act stipulates that radiological environmental impact assessment resulting from decommissioning should be carried out, the details have not been specified. Therefore, this paper compares and analyzes guidelines for evaluation of radiological environmental impacts of nuclear power plants overseas, and presents a draft on the assessment of radiological dose resulting from decommissioning according to the Korean situation.

Temporal-spatial Analysis of Environmental Impact and Locational Characteristics for Industrial Complex Projectsin South Korea (산업단지 개발사업의 환경 영향 및 시공간적 입지 특성변화 분석)

  • Choi, Hyun-Jin;Park, Ji Hyeon;Park, Jong-Yoon
    • Journal of Environmental Impact Assessment
    • /
    • v.30 no.5
    • /
    • pp.317-327
    • /
    • 2021
  • Industrial complexes have have been played an important role in various aspects such as national industrial development, economic growth. However, it is a cluster of manufacturing facilities which has a great impact on the surrounding area and the overall domestic environment during the operation of the facility. In this study, environmental influences and siting characteristics of industrial complexes were investigated based on the environmental impact assessment report from 2009 to 2019. The development tendency of industrial complexes is continuous decline, and major development areas are Gyeonggi, Gyeongsang and Chungcheong areas. We also confirmed that the average area of defenestration due to industrial complex is on the decline. Furthermore, the residential area and educational facilities, and the exposed population affected by industrial complex is constantly increased.

A Study on the Method of Implementation Assessment for Total Maximum Daily Load Management (수질오염총량관리를 위한 효율적 이행평가방안 연구)

  • Park, Jun-Dae;Park, Ju-Hyun;Rhew, Doug-Hee;Jeong, Dong-Hwan
    • Journal of Environmental Impact Assessment
    • /
    • v.17 no.2
    • /
    • pp.125-132
    • /
    • 2008
  • It is desirable that implementation assessment (IA) should be carried out efficiently in order to make successful progress of Total Maximum Daily Load (TMDL) in watershed management. There are many difficulties in the process of the implementation assessment because of the early stage in the application of TMDL in Korea. This study reviewed the present status of IA and proposed the methodology of its improvement such as flexible application of TMDL ledger, and standardization of assessment index and criteria. The deficient time for assessment period could be corrected by the consideration of the post-procedure after the submission of IA report.

A study of 'Re-consultation' on Marine Environment Impact Assessment (해역이용협의 제도 상 '재협의'의 개선방안에 대한 고찰)

  • KIM, Hyejin;OH, Hyuntaik
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.28 no.4
    • /
    • pp.913-924
    • /
    • 2016
  • Re-consultation on Marine Environment Impact Assessment (MEIA) says that business operators are then licensed back from the disposition authorities undergoing a consultation process to change business plans. Marine Environment Management Act has provisions(Article 94) with respect to a case where the scale of business, the period of business, reflects the basic plan, including a plan to change a variety of reasons. But increasingly diverse types of businesses and projects which are the subject of MEIA, As it appears that the vulnerability issues and the problem of the re-consultation. In this study conducted an analysis of the literature review and comment on the re-consultation report four years. In addition, it presents a check to the problem through concrete examples related to the re-consultation and proposes improvement measures.