• Title/Summary/Keyword: Environmental Costs

Search Result 1,292, Processing Time 0.039 seconds

Risk-Based Damage Cost Estimation on Mortality Due to Environmental Problems (환경 오염으로 인한 인체 위해도에 입각한 사망 손실 비용 추정에 관한 연구)

  • Kim, Ye-Shin;Lee, Yong-Jin;Park, Hoa-Sung;Shin, Dong-Chun
    • Journal of Preventive Medicine and Public Health
    • /
    • v.36 no.3
    • /
    • pp.230-238
    • /
    • 2003
  • Objectives : To estimate the value of statistical life (VSL) and health damage cost on theoretical mortality estimates due to environmental pollution. Methods : We assessed the health risk on three environmental problems and eight sub-problems. Willingness to pay (WTP) was elucidated from a questionnaire survey with dichotomous contingent valuation method and VSL (which is the division of WTP by the change of risk reduction) calculated from WTP. Damage costs were estimated by multiplying VSL by the theoretical mortality estimates. Results : VSLs from death caused by air pollution, indoor air pollution and drinking water contamination were about 0.3, 0.5 and 0.3 billion won, respectively. Damage costs of particulate matters ($PM_{10}$) and radon were higher in the sub-problems and were above 100 billion won. Because damage cost depends on theoretical mortality estimate and WTP, its uncertainty is reduced in the estimating process. Conclusion : Health damage cost or risk benefit should be considered as one scientific criterion for decision making in environmental policy.

AN ASSESSMENT SYSTEM OF ECO-FRIENDLINESS OF CONSTRUCTED FACILITY IN THE DESIGN PHASE USING VALUE ENGINEERING

  • Byung-Soo, Kim;Dong-Eun, Lee;Suk-Hyun, Kwon;Min-Kwon, Choe
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1625-1629
    • /
    • 2009
  • The new paradigm called 'Low Carbon Green Growth' involved in reducing greenhouse gas is on the rise as a critical issue worldwide. The essential of Kyoto protocol issued in 1997 is to achieve the sustainable economic growth environments by converting existing production system to eco-friendly one. The protocol imposes the liability to reduce greenhouse gas to the countries joined to it. The paradigm is directly involved in the energy consumption and environmental pollution caused by construction activities. Value Engineering which are mainly applied in the design phase in practice is a measure to improve the value of a constructed facility by analyzing and/or appraising the functions and costs of it. However, an appropriate method which assesses eco-friendliness of constructed facility has not been propose by researchers. This paper proposes a method which assesses the performance involved in eco-friendliness of constructed facility using Value Engineering (VE) in the design phase. The method estimates the environmental cost relative to the amounts of energy consumption and environmental pollution occurred over the entire project life cycle. The database called "Life Cycle Inventory DB", which stores information about the amounts of environmental pollution, is used. The algorithm which retrieves the amounts of environmental pollutions from the DB and converts them into environmental costs is developed. The algorithm is implemented into a system which quantifies the eco-friendliness of constructed facility in the design phase using VE.

  • PDF

A study on the evaluation for variation of revenue water ratio considering water supply area conditions and the development of proper cost estimation model of project for improvement of revenue water ratio (급수지역 여건을 고려한 유수율 변동 분석 및 적정 유수율 제고 사업비 산정 모델 개발)

  • Kiwon Kwon;Jinseok Hyung;Taehyeon Kim;Haekeum Park;Yoojin Oh;Jayong Koo
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.37 no.6
    • /
    • pp.409-423
    • /
    • 2023
  • In this study, we analyzed how the revenue water ratio(RWR) is affected by changes in conditions of the water supply area, such as the ratio of aging pipes, maintenance conditions, and revenue water. As a result of analyzing the impact of pipe aging and maintenance conditions on the RWR, it was confirmed that the RWR could be decreased if the pipe replacement project to improve the aging pipe ratio was not carried out and proper maintenance costs were not secured. It was also confirmed that an increase in the revenue water could be operated to facilitate the achievement of the project's target RWR. In contrast, a decrease in the revenue water due to a population reduction could affect the failure of the target RWR. In addition to analyzing the causes of variation in the RWR, the calculation of estimated project costs was considered by using leakage reduction instead of RWR from recent RWR improvement project cost data. From this analysis, it was reviewed whether the project costs planned to achieve the target RWR of the RWR improvement project in A city were appropriate. In conclusion, the RWR could be affected by variations in the ratio of aging pipes, maintenance conditions, and revenue water, and it was reasonable to consider not only the construction input but also the input related to RWR improvement, such as leakage reduction, when calculating the project cost.

A Cost-Benefit Analysis of Groundwater: Pumping Wells in Korea (지하수의 경제성 평가 연구: 지하수 관정을 중심으로)

  • Kim, Sun Geun
    • Economic and Environmental Geology
    • /
    • v.47 no.3
    • /
    • pp.219-225
    • /
    • 2014
  • In Korea, there are 1,474 thousand pumping wells nationwide which account for about 12% of total water use in 2012. As much as 39 hundred million tons of groundwater were used while 333 hundred million tons of total water were supplied in 2012. Because the water management authority projects that water demand will exceed supply by 2021, the authority is planning to extensively expand groundwater use in accordance with economic feasibility. Using the basic frameworks of cost-benefit analyses of the World Bank and the US Environmental Protection Agency (US EPA), the objective of this study is to examine the costs and benefits of the expansion of Korea's groundwater extraction through pumping wells. We conclude that the BC ratio of the groundwater pumping wells is 2.98. This signifies that the benefits are 2.98 times higher than the costs. The benefits include use and non-use values of pumping wells while the costs include the installation and maintenance of new wells, in addition to the restoration and pollution costs of abandoned wells, as well as fees for water quality tests, etc.

Analysis on The Production Costs and Energy Balance of Heating Wood-Chip by Yarding Machines (집재기계에 따른 난방용 목재칩의 생산비용 및 에너지 수지분석)

  • Hwang, Jin-Sung;Oh, Jae-Heun;Kim, Joon-Soon;Cha, Du-Song
    • Journal of Korean Society of Forest Science
    • /
    • v.98 no.6
    • /
    • pp.799-805
    • /
    • 2009
  • To construct the production system of forest biomass as a small scale heating energy source, energy availability of wood-chip was examined by cost and energy balance analysis in the production process. The costs to produce wood-chip of 1 kg was calculated by yarding machines and their operational gradient conditions. As a result, 195.45~210.54 won/kg were required as production costs of wood-chip. Input energy rate (%) which is output to input energy in wood-chip production process were showed as 26.58~27.38%. Energy input rate by operational gradient was not significantly difference, and scenario B with tower yarder system appeared by more efficient than scenario A with tractor yarding system in opposition to production costs analysis.

Line Planning Optimization Model for Intercity Railway (지역간 철도의 노선계획 최적화 모형)

  • Oh, Dongkyu;Kho, Seung-Young;Kang, Seungmo
    • Journal of Korean Society of Transportation
    • /
    • v.31 no.2
    • /
    • pp.80-89
    • /
    • 2013
  • The purpose of this research is to optimize the line planning of the intercity passenger railway. In this study, the line planning problem has been formulated into a mixed integer programming by minimizing both user costs (passenger's total travel time) and operator costs (operation, maintenance and vehicle costs) with multiple train types. As a solution algorithm, the branch-and-bound method is used to solve this problem. The change of travel demand, train speed and the number of schedules have been tested through sensitivity analysis. The optimal stop-schedules and frequency as well as system split with respect to each train type have been found in the case study of Kyoung-bu railway line in Korea. The model and results of this research are useful to make a decision for railway operation strategy, to analyze the efficiency of new railway systems and to evaluate the social costs of users and operators.

The Supply Status Analysis of New Renewable Energy Based on Public Obligation System (공공의무화 제도에 따른 신재생에너지 보급 실태 분석)

  • Seo, Sang-Hyun;Lee, Yong-Ho;Kim, Hyung-Jin;Cho, Young-Hum;Hwang, Jung-Ha
    • 한국태양에너지학회:학술대회논문집
    • /
    • 2011.11a
    • /
    • pp.220-225
    • /
    • 2011
  • Based on the supply status statistics of new renewable energy according to public obligation system, current status of overall application centered on solar heat, solar ray, and geothermal heat as energy sources that can be applied to buildings may be analyzed as follows. (1) After the public obligation system, the investment costs on the total construction costs by years were between 5.21% and 7.12%: they were 7.12% in 2004, where the system was initially implemented; and they were gradually declined from 2005 to 2011, 5.76% in average. The ratio of equipment investment per energy sources in the total construction costs was 5.9%, which was slightly more than the obliged ratio. The order of investment costs per energy source was solar ray, geothermal heat, and solar heat. (2) Among the 1,433 sites in the plan of new renewable energy installation based on the public obligation system, "for cultural & social use" was most in target institution, and facilities for education & research was most in use classification, followed by public working, culture & rally, and sports. The number of facilities applied according to the case for planning installation per use classification of the target institution was between 1.1 and 1.5, or 1.4 in average of energy source. Conclusively, the authors of this study investigated overall current status of new renewable energy supply from the analysis of statistic data, and it may be needed of further supplementation of various examinations by visiting investigation and interviews with practitioners based on classification of use of target institutions.

  • PDF

Optimal Life Cycle Cost Design of a Bridge (교량의 생애주기비용 최적설계)

  • Park, Jang-Ho;Shin, Yung-Seok
    • Journal of the Korean Society of Safety
    • /
    • v.25 no.6
    • /
    • pp.115-122
    • /
    • 2010
  • The importance of the life cycle cost (LCC) analysis for bridges has been recognized over the last decade. However, it is difficult to predict LCC precisely since the costs occurring throughout the service life of the bridge depend on various parameters such as design, construction, maintenance, and environmental conditions. This paper presents a methodology for the optimal life cycle cost design of a bridge. Total LCC for the service life is calculated as the sum of initial cost, damage cost, maintenance cost, repair and rehabilitation cost, user cost, and disposal cost. The optimization method is applied to design of a bridge structure with minimal cost, in which the objective function is set to LCC and constraints are formulated on the basis of Korean Bridge Design Code. Initial cost is calculated based on standard costs of the Korea Construction Price Index and damage cost on damage probabilities to consider the uncertainty of load and resistance. Repair and rehabilitation cost is determined using load carrying capacity curves and user cost includes traffic operation costs and time delay costs. The optimal life cycle cost design of a bridge is performed and the effects of parameters are investigated.

A Study of LCCA and LCA to Evaluate Feasibility for Introducing Smart Quiescent Power Control System into Office Building (LCCA 및 LCA 분석을 이용한 오피스 빌딩에 지능형 대기전력 제어시스템 도입의 타당성 분석에 관한 연구)

  • Quan, Junlong;Lee, Seok-Jung;Choi, Hye-Mi;Kim, Kyung-Hwan;Kim, Ju-Hyung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.16 no.2
    • /
    • pp.141-149
    • /
    • 2016
  • Recently, in an attempt to overcome the defects of quiescent power shutdown system, smart quiescent power control system has been developed. However, due to its higher investment costs, feasibility evaluation must be conducted. While LCCA (Life Cycle Cost Analysis) model is useful to estimate net savings of alternatives that differ with respect to initial costs and operating costs, the environmental burdens are not considered. On the contrary, LCA (Life Cycle Assessment) model is suitable to assess environmental impacts associated with the stages of a product's life but it does not consider costs. In this study, a comprehensive analysis on the economic and environmental impacts of smart quiescent power control system is conducted by using LCCA and LCA model. In addition, sensitivity analysis is carried out to quantify accuracy of estimates.

ESTIMATING COSTS DURING THE INITIAL STAGE OF CONCEPTUAL PLANNING FOR PUBLIC ROAD PROJECTS: CASE-BASED REASONING APPROACH

  • Seokjin Choi;Donghoon Yeo;Seung H. Han
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1183-1188
    • /
    • 2009
  • Estimating project costs during the early stage of conceptual planning is very important when deciding whether to approve the project and allocate an appropriate budget. However, due to greater uncertainties involved in a project, it is challenging to estimate costs during this initial stage within a reasonable tolerance. This paper attempts to develop a cost-estimate model for public road projects under these circumstances and limitations. In the conceptual planning stage of a road project, there is only limited information for cost estimation, for example, such input data as total length of the route, origin and destination, number of lanes, general geographic characteristics of the route, and other basic attributes. This implies that the model should individuate suitable but restricted information without considering detailed features such as quantity of earthwork and a detailed route of a given condition. With these limited facts, this paper applies a case-based reasoning (CBR) method to solve a new problem by deriving similar past problems, which in turn is used to estimate the cost of a given project based on best-fitted previous cases. To develop a CBR cost-estimate model, the authors classified 8 representative variables, including project type, the number of lanes, total length, road design grades, etc. Then, we developed the CBR model, primarily by using 180 actual cases of public road projects, procured over the last decade. With the CBR model, it was found that the degree of error in estimation can be reasonably reduced, to below approximately 30% compared to the final costs estimated upon the completion of detailed design.

  • PDF