• 제목/요약/키워드: Environment Management Plan

Search Result 1,588, Processing Time 0.038 seconds

Environment-Friendly Development System of Irrigation ditch and Drainage canal (용배수로의 환경친화적 정비기법)

  • Kim, Chae-Soo;Um, Dae-Ho;Han, Kyung-Soo;Jun, Teak-Ki;Kim, Sun-Joo;Choi, Kyung-Yong
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2003.10a
    • /
    • pp.107-110
    • /
    • 2003
  • In this article we developed the environment-friendly arrangement system of drainage and irrigation canal. It is divided into the model which considers ecological conservation type, irrigation flood control type and hydrophilic type. In canal plan and design we will consider vertical section and intersection plan, water quality management, waterside environment construction plan, canal terminal treatment, canal bottom plan, etc. Consequently, We propose the detail contents which must be considered when we plan the environmental canal space.

  • PDF

QUALITY MANAGEMENT OF ECOLOGICAL ENGINEERING

  • Ying-Mei Cheng;Been-Jyh Yu
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1216-1222
    • /
    • 2009
  • Ecological Engineering (EE) refers to all sustainable engineering that can reduce damage to ecosystems and that adopts ecology as a base and safety as an orientation in order to implement conservation of biodiversity and sustainable development. In short, EE attempts to safeguard the ecological environment while any essential construction projects proceed. EE encompasses many fields, including construction skills, ecosystem preservation, landscape, and even related cultures and so on. Such variety results in greater complexity of construction, and, consequently, indirectly increases the difficulty of construction quality control. The objective of our research is to explore a promising model for EE via an extensive literature survey. This model includes three principal stages: plan-design, construction, and maintenance, along with individual accompanying phases concerned with quality control and vital management. In this article, a river restoration example is adopted to describe in detail the critical points of quality control in the three stages (plan-design, construction, and maintenance) of the construction life cycle. This study proposes an integrated structure for quality management of EE to guarantee its quality and to enhance its core applications in order to achieve long-lasting preservation of the environment.

  • PDF

Water Resources Management Challenge in the Citarum River Basin, Indonesia

  • Wicaksono, Albert;Yudianto, Doddi;Jeong, Gimoon;Kang, Doosun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2016.05a
    • /
    • pp.198-198
    • /
    • 2016
  • The Citarum River Basin is the biggest river basin in West Java Province, Indonesia and it plays strategic roles in providing water for irrigation, domestic and industrial uses, and power generation, besides controlling the flood during rainy season. Flowing through seven major cities makes the river flow and water demand are vulnerable to land use change around the river. The present water resources management has involved the regulator, operator, and users in deciding an appropriate water management plan for the entire basin. The plan includes an operation plan for three reservoirs, construction or maintenance of the river channel, and water allocation for all users along the river. Following this plan, a smaller operation group will execute and evaluates the plan based on the actual flow condition. Recently, a deforestation, environment degradation, river sedimentation, a rapid growth of population and industry, also public health become new issues that should be considered in water basin planning. Facing these arising issues, a new development program named ICWRMIP was established to advance the existing management system. This program includes actions to strengthen institutional collaboration, do the restoration and conservation of the river environment, improve water quality and public health, also advance the water allocation system. At present, the water allocation plan is created annually based on a forecasted flow data and water usage prediction report. Sometimes this method causes a difficulty for the operator when the actual flow condition is not the same as the prediction. Improving existing system, a lot of water allocation studies, including a development of the database and water allocation simulation model have been placed to help stakeholders decide the suitable planning schemes. In the future, this study also tries to contribute in advancing water allocation planning by creating an optimization model which ease stakeholders discover a suitable water allocation plan for individual users.

  • PDF

The Study on the Licensed Restaurant Cooks' Understanding of the Environment-friendly Management System - Based on the Examples of H Group's ESH Management System - (친환경 경영 체제의 레스토랑 조리사의 의식도에 관한 연구 - H그룹 ESH 경영 시스템 사례를 중심으로 -)

  • Seo, Min-Suk
    • Culinary science and hospitality research
    • /
    • v.11 no.1
    • /
    • pp.50-69
    • /
    • 2005
  • Environmental matters have more influence on business performances. Consequently, as a way to cope with environmental matters, much more interests in environment-friendly management have increased recently. First-rated hotels and food-service restaurants have been concentrating on gaining ISO 14001 EMS(Environment Management System), which is regarded as objective and international, to solve and prevent environmental matters. However, there are some internal and external problems emerged in the food-service industry and first-rated hotels. Therfore, covering the examples of ESH(Environment Safety Health) management which was developed by H group and based on ISO 14001 EMS, this study aims to observe merits of ISO 14001 EMS as a model that can develop an environment management system, and to consider an improvement plan for better understanding of licensed cooks in restaurants.

  • PDF

A study of 'Re-consultation' on Marine Environment Impact Assessment (해역이용협의 제도 상 '재협의'의 개선방안에 대한 고찰)

  • KIM, Hyejin;OH, Hyuntaik
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.28 no.4
    • /
    • pp.913-924
    • /
    • 2016
  • Re-consultation on Marine Environment Impact Assessment (MEIA) says that business operators are then licensed back from the disposition authorities undergoing a consultation process to change business plans. Marine Environment Management Act has provisions(Article 94) with respect to a case where the scale of business, the period of business, reflects the basic plan, including a plan to change a variety of reasons. But increasingly diverse types of businesses and projects which are the subject of MEIA, As it appears that the vulnerability issues and the problem of the re-consultation. In this study conducted an analysis of the literature review and comment on the re-consultation report four years. In addition, it presents a check to the problem through concrete examples related to the re-consultation and proposes improvement measures.

Study on the Development of Management System of National Forest in Japan - Emphasis on the Management Plan and Regulation - (일본(日本)의 국유림시업(國有林施業) 전개(展開)에 관한 고찰(考察) - 시업계획(施業計劃) 방침(方針)을 중심(中心)으로-)

  • Choi, In-Hwa
    • Journal of Forest and Environmental Science
    • /
    • v.9 no.1
    • /
    • pp.81-95
    • /
    • 1993
  • The purpose of this study is to analyze the historical development process on management plan and regulation in Japan in order to contribute to the systmatic management plan of national forest in Korea. Before the World War II, remarkable national forest management plan in Japan was introduction of the normal forest ideas by the management plan of the combination system of maximum forest rent and maximum soil rent, employing the clear-cutting of small area, simplified area-period method, and about 70-80 years rotation. After World War II, enterprise management was developed from the previous combination system. During the rapid economic development period, the original working system and normal forest ideas were not recognized, so that the destructions of forest and environment were resulted from the yield of future increment and clear-cutting of large area. During the slow economic development period, on the other hand, the reproduction of forest resources was difficult, as the result of the negligent management system and the depression of management. Future management system of national forest, therefore, should establish the working system and the management plan for the purpose of both forest resources reproduction and environment maintenance, simultaneously.

  • PDF

Visual Landscape Plan for Shinan Province with Ecological Landscape Resources (생태경관자원 활용을 고려한 신안군 경관기본계획)

  • Joo, Shin-Ha;Yun, Hui-Jae
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.12 no.1
    • /
    • pp.32-43
    • /
    • 2009
  • The purpose of this study is to suggest the visual landscape plan for Shinan province with ecological landscape resources, which is comprised of more than 1,000 islands. The plan was done by the order of image plan, landscape structure plan and detained landscape plan. The image of Shinan province was elicited as 'nature', 'complexity' and 'connectivity', by the aspects of planning, cognitive and strategic sides. The landscape zones are planned, such as leisure zone, rural & marine ecological zone and marine tourism zone, and the landscape axes are also set, such as marine axis, ecological axis and circular axis. Especially to conserve the ecological resources, some conservation zones are proposed and design guidelines for each landscape type are also provided, which are not commonly included in the urban landscape plan. Consequently, the landscape plan and ecological environmental plan were complementary to each other. In the detailed landscape plan, more specific plans and design guidelines are suggested for coastal scenery, village and forest scenery, historical and cultural landscape management and promotion. To improve the visual landscape in terms of planning and administrative aspects, the visual landscape plan has become increasingly important for the local governments. The establishment of visual landscape plan may hopefully help to make Shinan province more beautiful and attractive. The landscape plan and ecological environment plan should be integrated, and the further discussion and research are necessary.

A Fundamental Study on the Introduction Result Analysis and Activation Plan Establishment of Coastal Safety Management Code (내항선안전관리규약(CSM Code)의 도입 성과 분석 및 활성화 방안수립을 위한 기초적 연구)

  • Noh Chang-Kyun;Chong Chong-Ho
    • Proceedings of KOSOMES biannual meeting
    • /
    • 2005.05a
    • /
    • pp.23-29
    • /
    • 2005
  • Our country marine transport enterprise the international from competitive power from the hazard which develops at marine transport powerful country the government and marine transport presentation with activation of safety management protection of life Protection and oceanic environment from the sea hazard at the place where compared to it is endeavoring more the activation plan so far regarding the safety management from the coastal line insufficient are and the system and actuality safety management activation plan which is suitable in the coastal line is necessary. From the research which it sees consequently today a result analysis of coastal line safety management and the development direction of activation plan importance from it let in the immediacy which from the marine transport enterprise is important with the international and oceanic environmental protection it presented.

  • PDF

A Study of the Client′s Importance Perception on the Factors Affecting the Foodservice Management Contract (위탁급식 업체선정에 영향 미치는 요인에 대한 고객사의 중요도 인식 조사)

  • 김현아;양일선;이보숙;박진영
    • Journal of Nutrition and Health
    • /
    • v.37 no.5
    • /
    • pp.406-414
    • /
    • 2004
  • The purposes of this study were 1) to investigate the importance level on factors affecting the foodservice management contract perceived by the clients in the office building, government and public offices and manufacturing company in Seoul and Kyungi 2) to compare the perceived importance levels of the present contract and future contract 3) to compare the perceived importance levels of the competitive bid with those of the private contract. To collect the data on the perceived importance level on the affecting the foodservice management contract, the questionnaires were developed by the delphi technique and modified by the pilot test. The questionnaires consisted of 4 categories and 19 items on the factors affecting the foodservice management contract and the importance level on the factors were measured by 5-likert scale. From March 12 to April 13 in 2003, the self-administrative questionnaires were mailed to 280 clients. The questionnaires were responded from the 50 clients (respondent rate: 25%). On the factors affecting the present contract and the future contract, among the 4 categories (the appropriateness of foodservice operation plan, the evaluation of the foodservice company, sales ability, the conditions of the cost in the contract), the importance level of the appropriateness of foodservice operation plan was higher than those of the other categories. In the comparison of the perceived importance level between the present contract and the future contract, the importance level of 4 items (sanitation and safety management plan, menu management plan, service management plan, food cost per meal) in the future contract were significantly higher than those in the present contract (p<.01, p<.05, p<.05, p<.01). There were the significant differences between the private contract and competitive bid on the factors affecting the present contract in the 3 items, which were $\ulcorner$renewal plan for interior and environment$\lrcorner$, $\ulcorner$strategic alliance with the contractor$\lrcorner$, $\ulcorner$lobby of the foodservice company$\lrcorner$ (p<.05, p<.05, p<.05). And on the factors affecting the future contract, there were significant differences in the 2 items, which were $\ulcorner$renewal plan for interior and environment$\lrcorner$and $\ulcorner$cost per meal$\lrcorner$in comparing the competitive bid and private contract (p<.05, p<.01). The clients perceived the appropriateness of foodservice operation plan was more important than the other categories in the future foodservice management contract. It was proposed that the foodservice management contract company should focus on the foodservice operation to satisfy the customers and clients in order to get more contract in the future.