Journal of Korean Institute of Industrial Engineers
/
v.41
no.4
/
pp.344-351
/
2015
Recently, an ERP (Enterprise resource Planning) system has been becoming an essential S/W tool for companies to manage their business processes and manufacturing resources. As the information exchange becomes more complex, not only corporate companies but also small- and mid- sized enterprises (SMEs) are required to build an ERP system. However, for small- and middle- sized companies, the adoption of ERP systems becomes challenging due to high cost and long installation time of the system. This paper presents a novel concept of an adaptive ERP system incorporating the ontology structure of the business supply chain information. The proposed ERP installation methodology is illustrated with an example of a door-trim manufacturing company in the automotive supply chain.
Based on investigating and analyzing the cases of advanced foreign universities that have already included ERP courses in their education systems, this study proposed the ways of incorporating ERP courses into Korean universities' curriculums in terms of the following three areas: 1) development of ERP courses, 2) establishment and maintenance of ERP education environment, 3) continuous evaluation and improvement of ERP education implementation. As reasonable ERP courses, "Introduction to ERP" targeted to educating overall basic concepts in ERP system and business administration, "ERP System Implementation" for fostering business process design and system implementation skills, "ERP Programming" such as ABAP for the purpose of customizing ERP system, and "Strategic Use of ERP" dealing with ERP package selection and implementation methodologies of effective utilization of ERP systems were suggested. Regarding the establishment and maintenance of ERP education environment, single server architecture model that contained both database and application was proposed with the intention of set-up cost saving and maintenance efficiency. As for the evaluation and improvement on ERP education implementation, its methodologies were introduced through analyzing the advanced cases. Finally in addition to the above three areas, critical success factors for effectively launching ERP education in the universities were suggested through reviewing the previous case studies.
Seung-Uk So;Myeong-Ki Han;Young-Hun Kim;Jun-Soo Park
Journal of Ocean Engineering and Technology
/
v.37
no.5
/
pp.190-197
/
2023
In the shipbuilding and marine industry, digital transformation activities are promoted primarily by large shipyards. However, bottlenecks are observed across value chains, and digital transformation effects are reducing because of the cost and technical challenges encountered by supplies. In this study, we proposed a win-win cooperation model for large, small, and medium-sized companies using digital transformation based on the characteristics of the shipbuilding and marine industry through case studies. We investigated the digital transformation progress in German and Korean small and medium-sized enterprises (SMEs). In addition, we identified information-sharing methods and management challenges encountered in enterprise resource planning and manufacturing execution systems in the collaboration process of pipes, panels, blocks, etc. of SMEs that are suppliers of a Korean shipyard, and clarified communication by building a platform based on a common format between shipyards and suppliers. Further, we proposed a standard model of a digital transformation system for enhancing the collaboration between large companies and suppliers and proposed a basic plan including strategies to efficiently and effectively build a digital transformation system based on the standard model.
Constraint directed scheduling techniques, representing problem constraints explicitly and constructing schedules by constrained heuristic search, have been successfully applied to real world scheduling problems that require satisfying a wide variety of constraints. However, there has been little basic research on the representation and optimization of the objective value of a schedule in the constraint directed scheduling literature. In particular, the cost objective is very crucial for enterprise decision making to analyze the effects of alternative business plans not only from operational shop floor scheduling but also through strategic resource planning. This paper aims to explicitly represent and optimize the total cost of a schedule including the tardiness and inventory costs while satisfying non-relaxable constraints such as resource capacity and temporal constraints. Within the cost based scheduling framework, a cost propagation algorithm is presented to update cost information throughout temporal constraints within the same job.
Journal of the Korea Society of Computer and Information
/
v.10
no.6
s.38
/
pp.299-308
/
2005
Recently, the standardization and computerization of franchise management have been necessitated from the specialization of industrial areas and the diversification of customer requirements. The existing ERP(Enterprise Resource Planning) systems are commercially used, but usually are restrictive solutions about manufactured goods and inventory management. etc. In this Paper, we propose an effective franchise management system Franchiser X1(FX1), which is a total component-based franchise management system for effectively supporting franchise management works, including the recruit of franchisees, the management of franchisees, consulting, education and A/S, bill collecting, and so on.
The enterprise resource planning (ERP) system is a standardized and advanced business process that many companies are implementing now-a-days through customization. However, it affects the efficiency of operations as these customizations are based on uniqueness. In this study, we analyzed the impact of customized modules and processing time on customer service request (CSR), by utilizing the stacked CSR data during the construction and operation of ERP, focusing on small and medium-sized enterprises (SMEs). As a result, a positive correlation was found between unit companies and the length of ERP implementation; ERP modules and the length of ERP implementation; ERP modules and unit companies; and the type of ERP implementation and ERP module. In terms of CSR, a comparison of CSR processing time of CBO (customized business object) module and STD (standard) module revealed that while the five modules did not display statistically significant differences, one module demonstrated a statistically very significant difference. In sum, the analysis indicates that the CBO-type CSR and its processing cost are higher than those of STD-type CSR. These results indicate that companies planning to implement an ERP system should consider the ERP module and their customization ratio and level. It not only gives the theoretical validity that should be considered as an indicator for decision making when ERP is constructed, but also its implications on the impact of processing time suggesting that the maintenance costs and project scheduling of ERP software must also be considered. This study is the first to present the degree of impact on the operation and maintenance of customized modules based on actual data and can provide a theoretical basis for applying SW change ratio in the cost estimation of ERP system maintenance.
Journal of the Korea Society of Computer and Information
/
v.6
no.1
/
pp.130-138
/
2001
Combining a qualified group of people and following through the appropriate phases in the necessary order is crucial to project success. Companies face a wide range of issues and obstacles during implementation that can remain until they start using the system. Benchmarking Partners categorizes these problems into three groups: people issues, process issues, and technology issues Companies should try to implement ERP software as quickly as possible. in fact most companies now use a technique commonly referred to as a rapid implementation methodology. This paper outlines the challenges companies can anticipate during implementation and identifies and describes the six common steps of an ERP project. the paper also discusses new approaches, known as rapid ERP methodologies that are designed to help companies hasten the implementation of such systems.
This study developed the ISM (Electronic Store Success Model) by basing upon the revised D&M IS Success Model and reflecting the characteristics of marketing and e business. The theoretical rationale of this model was as following : 1) Though the revised D&M IS Success Model (2002) must be more logical and complete model than the original D&M IS Success Model (1992), it did not reflect characteristics of marketing and e business. 2) In the marketing studios, Service Quality has been suggested as one of basic strategies for success. 3) In e business studies, Trust has been emerging as a potentially important antecedent of e loyalty. 4) There has been a paradigm shift from satisfaction to loyalty in marketing emphasis. 5) Nowadays, ERP (Enterprise Resource Planning) has been pervaded in many organizations and has supported PCA (Profit Center Accounting) or Channel based Accounting, so it has not been difficult to evaluate financial performance of Electronic Store. The ESM that has six dimensions (System Quality, information Quality. Service Quality, Trust, Loyalty, Financial Performance) and expresses the causal relationship among them was proposed and was compared with BSC (Balanced Scorecard), WebQual, and EWAM (Extended Web Assessment Method). The results showed that the ESM coincides with BSC and contains dimensions of WebQual, and EWAM.
Proceedings of the Korean Operations and Management Science Society Conference
/
2005.10a
/
pp.299-320
/
2005
To rapidly respond to uncertainties in the business environment whilst remaining competitive, every organization needs to be able to successfully introduce and manage organizational change. Cognizant of the role of information systems (IS) as an enabler of organizational change, many organizations have paid attention to Enterprise Resource Planning (ERP) systems for successful organizational change primarily because of their change-driving forces across organizations. In this study, we focus attention on the role of readiness for change in the ERP systems adoption. Readiness for change described as views about the need for organizational change is posited to be and antecedent of two expectancies about the need for organizational change is posited to be an antecedent of two expectancies about the system. performance expectancy and effort expectancy, which lead to actual system use. In order to further establish th relevance of readiness for change as a determinant of two expectancies, computer self-efficacy is considered to be other key predictor as well. In addition, this study proposes that the personal characteristics of organizational commitment and perceived personal competence play roles of important determinants of readiness for change. Based on data gathered from the users of the ERP systems, structural equation analysis using LISREL provides significant support for the proposed relationships. Theoretical and practical implications are discussed along with limitations.
The generalization of Internet use has been spreaded all over the world and impacted company to introduce intranet and extranet for their operation which dealt with electronic commerce. For these reason, endeavor of implementation of web site system is promotioned and enhanced the possibility of adaptation range for the view of company. Dramatic competition which company faced with the use of internet and request from all over the world made company brought company to various and different type of level. It is necessary to develop website system with experty knowledge to satisfy customer needs. To deal with this situation, works from the level of government should proposed to spread whole country business which propelled through kyungnam mechanic industry information promotion center. With strategic proposal concerning district characteristics to adapt electronic commerce successfully, information promotion should performed. Support of government is needed continuously to realize infra of ASP composed of 4,877 mechanic industry company. It might be possible to deal with international rapid change with cooperation of company and government related department.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.