• 제목/요약/키워드: Engineering process

검색결과 46,006건 처리시간 0.057초

Process Metamorphosis and On-Line FEM for Mathematical Modeling of Metal Rolling-Part I: Theory

  • Zamanian, A.;Nam, S.Y.;Shin, T.J.;Hwang, S.M.
    • 소성∙가공
    • /
    • 제28권2호
    • /
    • pp.83-88
    • /
    • 2019
  • This paper introduces a new concept - on-line FE model, as applied to metal rolling. The new technology allows for completion of process simulation within a tiny fraction of a second without loss of high-level prediction accuracy inherent to FEM. The three steps of an on-line FE model design namely, process metamorphosis, mesh design, and process variable design, are described in detail. The procedure is demonstrated step by step through designing actual on-line models for the prediction of the dog-bone profile in edge rolling. The validity and prediction accuracy of the on-line FE models are analyzed and discussed.

이상 혐기성 막공정에 의한 침출수 처리 모니터링 (Monitoring of the Treatment of Leachate by Two Phase Anaerobic Membrane Process (TPAMP))

  • 황문현;현승훈;장남정;조재원;김인수
    • 한국물환경학회지
    • /
    • 제18권2호
    • /
    • pp.151-157
    • /
    • 2002
  • Landfill leachate is one of highly contaminated and heterogeneous wastewater. The leachate from initial landfill can be treated by anaerobic process because it contains biodegradable matters, particularly, volatile fatty acids (VFAs). However, the anaerobic treatment of leachate is generally required longer hydraulic retention time (HRT) than aerobic process and another treatment process to satisfy effluent concentration. Therefore the modification of conventional anaerobic treatment is needed. Two phase anaerobic membrane process (TPAMP) is an integrated membrane process to be able to separate anaerobic metabolism into two phase which are acidogenesis and methanogenesis for improvement of anaerobic treatment efficiency. In this study, the efficiency of TPAMP and conventional anaerobic treatment were compared in terms of HRT, effluent SCOD, VFAs Membrane used in TPAMP was the UF of capillary type with the surface area of $0.048m^2$. The average effluent SCOD of conventional anaerobic treatment was 1352 mg/L and the removal was 96 % at HRT 60 days, while in TPAMP, 927 mg/L and 98% at HRT 30 days.

금속 3D 프린팅 적층제조(AM) 공정 시뮬레이션 기술에 관한 고찰(I) (Investigation to Metal 3D Printing Additive Manufacturing (AM) Process Simulation Technology (I))

  • 김용석;최성웅;양순용
    • 드라이브 ㆍ 컨트롤
    • /
    • 제16권3호
    • /
    • pp.42-50
    • /
    • 2019
  • 3D printing AM processes have advantages in complex shapes, customized fabrication and prototype development stage. However, due to various parameters based on both the machine and the material, the AM process can produce finished output after several trials and errors in the initial stage. As such, minimizing or optimizing negative factors for various parameters of the 3D printing AM process could be a solution to reduce the trial-and-error failures in the early stages of such an AM process. In addition, this can be largely solved through software simulation in the preprocessing process of 3D printing AM process. Therefore, the objective of this study was to investigate a simulation technology for the AM software, especially Ansys Inc. The metal 3D printing AM process, the AM process simulation software, and the AM process simulation processor were examined. Through this study, it will be helpful to understand 3D printing AM process and AM process simulation processor.

In-situ Process Monitoring Data from 30-Paired Oxide-Nitride Dielectric Stack Deposition for 3D-NAND Memory Fabrication

  • Min Ho Kim;Hyun Ken Park;Sang Jeen Hong
    • 반도체디스플레이기술학회지
    • /
    • 제22권4호
    • /
    • pp.53-58
    • /
    • 2023
  • The storage capacity of 3D-NAND flash memory has been enhanced by the multi-layer dielectrics. The deposition process has become more challenging due to the tight process margin and the demand for accurate process control. To reduce product costs and ensure successful processes, process diagnosis techniques incorporating artificial intelligence (AI) have been adopted in semiconductor manufacturing. Recently there is a growing interest in process diagnosis, and numerous studies have been conducted in this field. For higher model accuracy, various process and sensor data are required, such as optical emission spectroscopy (OES), quadrupole mass spectrometer (QMS), and equipment control state. Among them, OES is usually used for plasma diagnostic. However, OES data can be distorted by viewport contamination, leading to misunderstandings in plasma diagnosis. This issue is particularly emphasized in multi-dielectric deposition processes, such as oxide and nitride (ON) stack. Thus, it is crucial to understand the potential misunderstandings related to OES data distortion due to viewport contamination. This paper explores the potential for misunderstanding OES data due to data distortion in the ON stack process. It suggests the possibility of excessively evaluating process drift through comparisons with a QMS. This understanding can be utilized to develop diagnostic models and identify the effects of viewport contamination in ON stack processes.

  • PDF

A New Product Development Using Robust Design and Decision Making Process

  • Lin, Than;Doan, Trieu An;Vu, Ngoc Anh;Cho, Guk-Hyun;Lee, Jae-Woo;Byun, Yung-Hwan
    • 시스템엔지니어링학술지
    • /
    • 제3권1호
    • /
    • pp.41-48
    • /
    • 2007
  • This paper presents a design methodology for developing a new push scooter. A case study is clone with effective planning processes to ensure the product quality under the different phases of a product design process. Parametric model based design process simulation and optimization is implemented by using ANSYS application tool. The relationship matrix and decision matrix are drawn by using several methods. The simulation results for deterministic design and robust design are compared. This entire design process phase can support the design and quality improvements for a new product development.

  • PDF

Fundamental Investigation of Knowledge Management System for a Plant

  • Seo-kyung Won;Ji-Yune Soh;Junbok Lee ;Choong-hee Han
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.375-380
    • /
    • 2009
  • Gas & Oil plant construction projects are increasing recently all over oil-producing countries. An EPC (Engineering, Procurement and Construction) company, which participates in the plant projects, should possess pertinent engineering licenses and EPC management skills to create high added-value. Nonetheless, there exist various risks involved in the EPC life cycle process due to such characteristics of construction projects as long duration of construction time and complicated processes along with the procured goods or services subjected to various logistics. The objective of this paper is to analyze the overall EPC life cycle for proper process and to examine various information and document. Additionally, the principal data for the analysis of the EPC process are derived from personal interviews with experts and specialty contractors of the plant projects. The results of this study would be widely used as a guide for efficient and effective management of overseas gas plant projects.

  • PDF

PROCESS RESEARCH FOR DEVELOPMENT OF STRUCTURAL COST ESTIMATING MODEL BASED QUANTITY - FOCUSED ON PUBLIC OFFICE BUILDING PROJECT -

  • Soo-Min Kim;Jung-Kyu Seo;Sung-Uk Kim;Chang-Hyun Shin;Yung-Jin Kim;Jae-Youl Chun
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1170-1175
    • /
    • 2009
  • When managers estimate exact construction cost at early stage and design phase, they can reduce construction cost in a more efficient way than to predict at construction stage. But, the current of public construction cost estimation and management is concentrated almost after detailed design phase. Therefore, construction cost management in design development phase to generally use approximate estimating is not correct. Also, the existing construction cost used the method that estimated by gross floor area-based cost estimates at design development phase. So, it is difficult to show the specific amount of materials and basis about the estimated cost of the construction. This study derived problems and limits of construction management at design development phase in case of public office building project through review of literature and current survey, and suggested estimating process model process of structural construction cost go improve these matters.

  • PDF

A FUNDAMENTAL STUDY ON IMPROVING PROCESS BY APPLYING CONSTRUCTION MANAGEMENT(CM) METHODS TO HOUSING RECONSTRUCTION PROJECTS

  • Kyunghwan Ahn;Keunwon Lee;Myungun Kim;Byungjoo Kang;Won Kwon;Jaeyoul Chun
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1497-1502
    • /
    • 2009
  • Due to the construction union's inefficient manner of carrying out their construction projects, lot's of conflicts and arguments among the union members are happening, so the proper model of reconstruction and process at each level of projects are also being recognized as an important part of the industry. So I would like to present an ideal process model of home reconstruction industry. Here below I'm presenting the benefits of this model when its applied properly. Through the study of information gained from the survey of residents, benefits such as AHP, analysis of SPSS, reduced construction time, budget cut, etc. will be produced

  • PDF