• 제목/요약/키워드: Engineering management

검색결과 27,978건 처리시간 0.049초

프로젝트 관리(PM)와 시스템엔지니어링 관리(SEM)의 범위 및 관계 (The Scope and Relationship of Project Management and Systems Engineering Management)

  • 이중윤
    • 시스템엔지니어링학술지
    • /
    • 제10권2호
    • /
    • pp.1-13
    • /
    • 2014
  • Put Abstract text here. Recently, the Korea industry need systems engineering technology more than yesterday. The systems engineering management function is needed to use the systems engineering engine process effectively. The systems engineering management function is overlapped a lot with project management function and has vague interface. The project management and systems engineering are two independent disciplines. So there are few references which address the scope and relationships clearly between systems engineering management and project management. This paper suggest the scope and relationships between systems engineering management and project management and revise the PMP and SEMP structure of Blanchard and Fabrycky. Followings are the key concept of this paper presenting. The project management(PM) composed of technical management and non-technical management. The technical management scope is same with systems engineering management. The non-technical management scope is composed of parts of enterprise support processes.

Development of an Eco-Value Engineering Support System

  • Sun-Im Kang;Jong-Hyeob Kim;Mi-A Jung;Chang-Taek Hyun;Sangwon Han
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.115-121
    • /
    • 2013
  • A number of urban renewal projects are currently being implemented around the world. Current project management tools are limited in effectively dealing with numerous issues regarding management of these projects (e.g., simultaneous execution of multiple projects). As an effort to address this deficiency, an Intelligent Program Management Information System (i-PgMIS) was developed for effective management of urban renewal projects. The i-PgMIS is a web-based system consisting of various modules including cost management, schedule management, risk management, change management, eco-value engineering (EVE) and so on. Based on the recognition of increasing awareness of creating sustainable built environment, this paper focuses on the EVE module that can support eco-value analysis at program-level management. The EVE module is expected to enhance value and sustainability of construction processes throughout the whole 'program' lifecycle and further to support program feasibility study based on life cycle costing.

  • PDF

Introduction On the Importance of Engineering Survey in Project Management

  • Meng, Yanlei;Chen, Guiming
    • 국제학술발표논문집
    • /
    • The 7th International Conference on Construction Engineering and Project Management Summit Forum on Sustainable Construction and Management
    • /
    • pp.260-262
    • /
    • 2017
  • During the construction of the project, all surveying and mapping work is collectively referred to as engineering survey. Therefore, the measurement work contains a wide range of content, in the engineering survey, design and construction management stage are involved. To the actual work, the project measurement runs through the project building in a number of stages, and provide basic services. This paper mainly through the analysis of engineering measurement at all stages of the role played by the measurement work in the project management work to do the following description.

  • PDF

Simultaneous Equation Estimation in Finance and Corporate Financial Decision: Empirical Evidence from Pakistan Stock Exchange

  • AHMED, Wahab;KHAN, Hadi Hassan;RAUF, Abdul;ULHAQ, SM Nabeel;BANO, Safia;SARWAR, Bilal;HUDA, Shams ul;KHAN, Mirwaise;WALI, Ahmed;DURRANI, Maryam Najeeb
    • The Journal of Asian Finance, Economics and Business
    • /
    • 제8권3호
    • /
    • pp.11-21
    • /
    • 2021
  • In the last few years, there is growing interest in the field of simultaneous equation estimation in finance due to the endogeneity problem caused by measurement errors, simultaneity, or omitted variables. This study aims to discuss the endogeneity problem in corporate financing decisions and investigate the interrelationship of financial decision-making such as investment decision, dividend decision, and external financing decision in Pakistan Stock Exchange (PSX) using two-stage least squares (2SLS) and generalized method of moment (GMM) estimation. The Bruech-Pagan test shows that the data has no heteroskedasticity issue and 2SLS is a better approach in the context of this study as compared to the GMM approach, and internal instruments are also sufficiently strong and valid. The three financial decision-making attributes are not jointly determined, and the dividend is influenced by one-sided investment. In the emerging stock market context, external financing and investment are not inter-related and did not affect each other. The question of whether the simultaneous equation estimation can be useful in the context of the emerging stock markets and newly-growing firms remains unanswered. The inclusive evidence shows that the theoretical link in the emerging stock market is difficult to prove like in developed stock markets.

철도안전프로젝트에 적용한 시스템엔지니어링 관리계획서 작성에 관한 연구 (A Study on the Systems Engineering Management Plan for the Railway Safety Project)

  • 최요철;조연옥
    • 한국철도학회논문집
    • /
    • 제9권4호
    • /
    • pp.482-486
    • /
    • 2006
  • The Systems Engineering Management Plan (SEMP) is the primary, top level technical management document for the integration of all engineering activities at the project plan phase. This document defined the activities to plan, control, and perform overall engineering integration. To develop the SEMP for Railway Safety System, several standards are reviewed and analyzed. And then a common requirement for SEMP preparation is derived from the results of analysis. Also, the SEMP example available practically applies to Railway Safety System. In particular, The SEMP focused on controling technical program management has been organized so far, but in this study the detailed contents of SEMP put stress on project management is derived. And it is related to each other between project management and technical engineering management. At the end, to continuously manage the items and contents of the SEMP, a database management and an automatic document generation system is presented using Computer-Aided Systems Engineering (CASE) tool.

Development of Tunnel Asset Management (TAM) Program

  • Hamed Zamenian;Dae-Hyun (Dan) Koo
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.576-582
    • /
    • 2013
  • Typical highway infrastructure systems include roadway pavement, drainage systems, tunneling, and other hardware components such as guardrails, traffic signs, and lighting. Tunnels in a highway system have provided significant advantages to overcoming various natural challenges including crossing underneath bodies of water or through mountainous areas. While only a few tunnel failure cases have been reported, the failure rate is likely to increase as these assets age and because agencies have not emphasized tunneling asset management. A tunnel system undergoes a deterioration life cycle pattern that is similar to other infrastructure systems. There are very few agencies in the United States implementing comprehensive tunnel asset management programs. While current tunnel asset management programs focus on inspection, maintenance, and operation safety, there is an increasing need for the development of a comprehensive life cycle tunnel asset management program. This paper describes a conceptual framework for a comprehensive tunnel asset management program. The framework consists of three basic phases including a strategic plan, a tactical plan, and an operational plan to provide better information to the decision makers. The strategic plan is a basic long term approach of tunnel asset management. The tactical plan determines specific objectives and the operational plan actually applies asset management objectives in practice. The information includes operational condition, structural condition, efficiency of the system, emergency response, and life cycle cost analysis for tunnel capital improvement project planning.

  • PDF

기준정보 관리와 과제관리 및 품질관리 중심의 플랜트 PLM 혁신전략 (Innovation Strategy for Engineering Plant Product Lifecycle Management based on Master Data Management, Project Management and Quality Management)

  • 명세현
    • 한국CDE학회논문집
    • /
    • 제21권2호
    • /
    • pp.170-176
    • /
    • 2016
  • PLM system has been widely used in whole industry. Specially, in case of the company that constructs the engineering plant, PLM can be a key success tool for the innovation with ERP and Enterprise IT Systems. This paper describes the innovation strategy for engineering plant PLM including Master Data management, EPC project management, full 3D modeling and quality management.

INCORPORATION OF TOTAL TIME MANAGEMENT INTO HIGHWAY PROJECT TIME MANAGEMENT SYSTEM

  • Yuan Jianbo;Liu Weijun;Zhang Jianren
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.796-801
    • /
    • 2005
  • Time management is one of the critical tasks in project management. Based on the theories of total quality management, this authors presented a project time management method, total time management (TTM), so as to facilitate highway project time management. This paper discussed the four fundamental characteristics of TTM: total factors management, staff management, project life cycle management, and Plan-Do-Check-Action (PDCA) cycle management. Now, most managers use computer software to manage the project. In order to make the theory of TTM more executable, the authors develop a project time management system suitable for TTM. This paper presents this time management system's analysis processes including system requirement, key functions etc..

  • PDF

Influence of Financial Literacy and Educational Skills on Entrepreneurial Intent: Empirical Evidence from Young Entrepreneurs of Pakistan

  • BILAL, Muhammad Ahmed;KHAN, Hadi Hassan;IRFAN, Muhammad;Ul HAQ, S.M. Nabeel;ALI, Manzoor;KAKAR, Ali;AHMED, Wahab;RAUF, Abdul
    • The Journal of Asian Finance, Economics and Business
    • /
    • 제8권1호
    • /
    • pp.697-710
    • /
    • 2021
  • This paper attempts to study the impact of Financial Literacy on Youth Entrepreneurial Intent in Pakistan. A closed-ended self-administered structured questionnaire covering financial literacy, computer knowledge, financial attitude, and financial knowledge with Entrepreneurial Intent was collected from young entrepreneurs. The research tried to investigate the education level with computer skill to inspect the effect of financial literateness on young generation Entrepreneurial Intent in the context of Pakistan. The research model was tested using PLS-SEM and authenticating a measurement model through the advanced methodology and their association with Entrepreneurial Intent. Results revealed that financial literacy and its two parts (financial attitude and financial knowledge) have a positive impact on Entrepreneurial Intent. The size of the joint impact of financial literacy and its components on Entrepreneurial Intent was assessed to be adequate. Entrepreneurial Intent is essential for creating new firms to maintain economic development. Furthermore, it is determined in this research that if youth has better financial knowledge and financial attitude, the probability of Entrepreneurial Intent increases. This suggests that if the youth in Pakistan desire to attain a higher limit of Entrepreneurial Intent, they must implement financial literacy models for enhancing and promoting their current Entrepreneurial Intent.