• Title/Summary/Keyword: Engineering integrated management

Search Result 1,860, Processing Time 0.035 seconds

A Generalized Integrated Inventory Model for a Multi-Item and its Raw Materials (공급사슬에서 다완제품-원자재의 통합재고정책에 관한 연구)

  • Kim, Dae-Hong
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.35 no.4
    • /
    • pp.83-97
    • /
    • 2012
  • In this paper, we consider a single-manufacturer single-buyer supply chain problem where a single manufacturer purchases and processes raw materials into a family of items in order to deliver a family of items to a single buyer at a fixed interval of time for effective implementation of Just-In-Time Purchasing. An integrated multi-item lot-splitting model of facilitating multiple shipments in small lots between buyer and manufacturer is developed in a JIT Purchasing environment. Previous research on the integrated model assumed that the manufacturer orders raw materials m (integer) times for every production run (lot multiplier policy for the raw material). In this paper, we consider a generalized policy in the replenishment of raw materials, allowing lot multiplier policy and lot splitting policy. An iterative solution procedure is developed to find the order interval for finished goods and raw materials, and number of shipments between buyer and manufacturer. We show by numerical example that when the integrated policy is adopted by both buyer and manufacturer in a cooperative manner, both parties can benefit.

Metrics for Measuring Innovation in Integrated Project Delivery

  • Lee, Tai-Sik;Swain, Saumya Ranjan;Park, Kyoung-Soon;Kim, Young-Hyun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.322-325
    • /
    • 2006
  • The research project evaluates different infrastructure project delivery methods used internationally. The goal is to define the main benefits, deficiencies, and requirements of the project delivery systems for both the short term and long term perspectives. Also, the research attempts to determine alternatives to modify and to promote change in the current infrastructure project delivery methods in order to make the processes more efficient with value added benefits to all participants.

  • PDF

Production/Distribution Scheduling for Integrated Supply Chain Management (통합 공급체인관리를 위한 생산/배송 스케줄링)

  • Park, Yang-Byung
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.28 no.4
    • /
    • pp.443-453
    • /
    • 2002
  • Many firms are trying to optimize their production and distribution systems separately, but possible profit increase by this approach is limited. Nowadays, it is more important to analyze these two systems simultaneously for the integrated supply chain management. This paper is a computational study to investigate the effectiveness of integrating production and distribution scheduling. We are interested in a multi-plant, multi-retailer, multi-product and multi-period industrial problem where the objective in solving production and distribution scheduling problem is to maximize the total net profit. Computational results on test problems of various sizes using the heuristic we developed show a substantial advantage of the integrated scheduling approach over the decoupled scheduling process. Sensitivity analysis on the parameter values indicates that, under the right conditions, the effectiveness of integrating production and distribution functions can be extremely high.

An Integrated Simulation Method to Support Virtual Factory Engineering

  • Zhai, Wenbin;Fan, Xiumin;Yan, Juanqi;Zhu, Pengsheng
    • International Journal of CAD/CAM
    • /
    • v.2 no.1
    • /
    • pp.39-44
    • /
    • 2002
  • This paper presents a structure and architecture of an integrated simulation method (ISM) to meet the requirements of virtual factory engineering (VFE). Combining CAD, VR and discrete event simulation techniques, the ISM provides static and dynamic simulation functions for implementation of VFE throughout the lifecycle. The static simulation can be used to evaluate the factory layout. The dynamic simulation enables us to evaluate ergonomics of factory, process performance of production system, feasibility of production plan and operation of factory, and to train operators safely, which cover the whole VFE lifecycle. The principles of the key techniques of VFE, including virtual factory data management system (VFDMS), static and dynamic simulation, are also discussed. To demonstrate and validate the ISM, a case study has been carried out in an assembly factory.

Research and Development of RFIC Technology in Smart Temperature Information Material

  • Chang, Chih-Yuan;Hung, San-Shan;Chang, Yu-Chueh;Peng, Yu-Fang
    • Journal of Construction Engineering and Project Management
    • /
    • v.1 no.1
    • /
    • pp.18-23
    • /
    • 2011
  • Conservation of energy and fuel is the trend in smart building design. Radio Frequency Integrated Circuit (RFIC) technology is often used in temperature sensing and signal transmission to manage indoor temperature, but it is rarely applied to the shell of the building. Heat retention and poor insulation in building shells are the largest causes of high energy consumption by indoor air conditioning. Through combining RFIC technology with temperature sensors, this study will develop smart temperature information material that can be embedded in concrete. In addition to accurately evaluating the effectiveness of shell insulation material, the already-designed Building Physiology Information System can monitor long-term temperature changes, leading to smarter building health management.

Who Should Control the Integrated Management System for Sewerage Facilities in the Upper Reaches of Multi-Purpose Dams in Korea?

  • Park, Kyoo-Hong;Kim, Hyung-Joon
    • Environmental Engineering Research
    • /
    • v.15 no.2
    • /
    • pp.99-103
    • /
    • 2010
  • Integrated management systems (IMS) that control entire sewerage facilities in the upper reaches of multi-purpose dams are being constructed for their efficient operation and management. However, because the IMS installed in a watershed belong to several local government bodies, significant conflict would be expected between stakeholders in the process of deciding who should control the IMS after completion of the construction that was initially implemented under the support of central government. The objective of this study was to suggest a decision making to determine who should control the IMS for sewerage facilities in the upper reaches of multipurpose dams in Korea, using the analytic hierarchy process (AHP). Three alternatives were selected to determine who should control the IMS for sewerage facilities: commissioning to public corporations, commissioning to private corporations, and a role-sharing partnership. In using the AHP technique, the emphasis was on comparing public interests, economics, efficiency, sustainability, specialty, grievance mediation and receptiveness. As a result, building a role-sharing partnership received the highest score. Commissioning to a special institute was also suggested as an alternative as this showed a score similar to that of building a role-sharing partnership.

The Development of sub-event Information interface for Integrated management of underground pipelines (통합 서비스를 위한 지하매설관 하부 이벤트 정보전달 인터페이스 개발)

  • Chae, Sookwon;Seo, Jaesoon;Kim, Joonseok
    • Journal of the Society of Disaster Information
    • /
    • v.13 no.1
    • /
    • pp.26-34
    • /
    • 2017
  • In this study, for the integrated information management of underground pipelines, each information management server software must have it's inter-operability. So Many kinds of smart-city integrated platform softwares were surveyed and the best platform software was selected. The interface software modules developed in this study was installed at the test system. Through this test system, when a sub system transfers an event message to the upper integrated server system, the inter-operability test between the upper system and a sub operating system was performed and its operability was resolved.