An Integrated Simulation Method to Support Virtual Factory Engineering |
Zhai, Wenbin
(Inst. of Computer Integrated Manufacturing, Shanghai Jiao Tong Univ.)
Fan, Xiumin (Inst. of Computer Integrated Manufacturing, Shanghai Jiao Tong Univ.) Yan, Juanqi (Inst. of Computer Integrated Manufacturing, Shanghai Jiao Tong Univ.) Zhu, Pengsheng (Inst. of Computer Integrated Manufacturing, Shanghai Jiao Tong Univ.) |
1 | U. Rembold, W. Reithofer, B. Janusz (1998), 'The Role of Models In Future Enterprises', Annual Reviews in Control, 22, 73-83 |
2 | H. Aytug, C. Dogan (1998), 'A framework and a simulation generator for kanban-controlled manufaturing systems', Computersand Industrial Engineering, 34, 337-350 |
3 | Prashant Banerjee, Dan Zetu (2001), Virtual Manufacturing, John Wiley&Sons. Inc, New York, pp. 10 |
4 | Antonimo Gomes de Sa, Gabriel Zachmann (1999), 'Virtual reality as a tool for Verification of Assemble and Maintenance Processes', Computers & Graphics, 23, 389-403 |
5 | Par Klingstam, Per Gullander (1999), 'Overview of Simulation Tools for Computer-aided Production Engineering', Computers in Industry, 38, 173-186 |
6 | Maged M. Dessouky, Sushil Verma (2001), 'A methodology for developing a web-based factory simulator for manufacturing education', IIE Transaction, 33, 167-180 |
7 | Young Jun Son, Richard A. Wysk (2001), 'Automatic simulation model generation for simulation-based, realtime shop floor control', Computers In Industry, 45, 291-308 |
8 | Ming Hung Lin, Li Chen Fu (2001), 'A Virtual Factory Based Approach to On-line Simulation and Scheduling for An FMS and A Case Study', Journal of Intelligent Manufacturing, 12, 269-279 |
9 | Richard B. Chase, Nicholas J. Aquilano, F. Robert Jacobs (1998), Production and Operations Management: Manufacturing and Services, McGraw-Hill Companies, Inc, New York, pp. 100 |
10 | Shoaf Steve (1999), 'PDM or ERP: Making the Connection', Manufacturing Engineering, 122, 144-147 |