Risk-sharing Strategies on EPC Contracts: Lessons-learned from Sabine Pass Liquefaction Project

  • Yoon, Sang-Moon;Lee, Jung-Heon;Lee, Eul-Bum
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.629-630
    • /
    • 2015
  • 'Sabine Pass Liquefaction Project (SPL Project)', a case study in this report, is the first construction project of a U.S. liquefaction facility for shale gas export overseas. This study analyzes the SPL Project to give understanding and a guideline to Korean EPC companies by benchmarking about effective risk-sharing strategies on EPC contracts. This study consists of three parts. The first summarizes the liquefaction process adopted on the SPL Project, named the 'ConocoPhillips Optimized Cascade Process', and compares it with other competitive liquefaction processes. The second introduces the unique features of the SPL EPC contract by comparing it with two other EPC forms of contracts: a FIDIC Silver Book for onshore plant projects and a contract of an offshore oil production (FPSO) project. The third focuses on the complexity of project financing (PF), especially lenders control and impact on the EPC contract such as covenant provisions to constrain variations and changes on the EPC Contract. From these conclusions, it is anticipated that this case study can provide a guideline for successful performance of Korean EPC contractors overseas.

  • PDF

양성자가속기 연구센터의 전력계통 보호계전 방식 (Electric Power System Relay Protection System Design for the Proton Accelerator Research Center of PEFP)

  • 문경준;이석기;전계포;조진삼;민의섭;남정민;김준연
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2009년도 제40회 하계학술대회
    • /
    • pp.428_429
    • /
    • 2009
  • 전력계통 운용시 고장이 발생하면 계통 운전원은 계전기 및 차단기 관련 동작정보 및 경보로부터 해당 고장내용을 판단하고 계통복구를 위한 조작을 행한다. 본 논문에서는 현재 건설중인 양성자가속기 연구센터의 전력 계통 운용시 발생한 고장에 따른 다중경보신호를 분석하기 위하여 전력계통의 고장영역별로 동작하는 보호계전기 신호, 차단기 신호 및 경보신호를 분류함으로써 이를 향후 전력계통 운용시 고장진단을 위한 기초자료로 활용하고자 한다.

  • PDF

FACTORS ACOUNTING FOR ACTIVITY-TIME AND PROJECT-TIME UNCERTAINITIES IN BORED PILES CONSTRUCTION PLANNING: CASE STUDY ON A BUIDLING PROJECT IN HONG KONG

  • Stephen K.K. Cheng;Ming Lu;Hongqin Fan
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.747-753
    • /
    • 2009
  • Planning the construction for a system of bored piles in building foundation engineering is (1) to predict the time duration required to complete all the bored piles with due consideration of relevant engineering factors and site constraints; then (2) to predict the total project time generally by aggregating the predicted working duration for construction of each bored pile. The duration for construction of an individual bored pile results from analyzing various working sequences and different activity duration (such as predrilling, excavation, steelfixing, air-lifting, and concreting, etc.), which is informed by experiences and site records of previous projects. However, determining the project duration for constructing many bored piles on one site is much more complicated than adding up the time duration for individual piles. In practice, project schedules are often found to be unrealistic and incorrect during the construction stage. This is because construction planning is not based on a exhaustive and comprehensive evaluation of site factors, such as site layout plan, site constraints, quality control, environmental control, safety control and logical relationships between different trades. In this paper, we identify those factors based on a foundation engineering site in Hong Kong with ninety-seven bored piles and address their effects on uncertainties in activity time and project time.

  • PDF

High Power RF Test of the PEFP 20 MeV DTL

  • Kim, Han-Sung;Kwon, Hyeok-Jung;Seol, Kyung-Tae;Cho, Yong-Sub;Hwang, Yong-Seok
    • 한국원자력학회:학술대회논문집
    • /
    • 한국원자력학회 2005년도 추계학술발표회
    • /
    • pp.881-882
    • /
    • 2005
  • PDF

무기체계개발 사업에서 체계공학 프로세스 기반 사업성과관리 수행 방안 (Earned Value Management base on System Engineering Process in the Weapon R&D Project)

  • 국승학;김윤희;유이주
    • 시스템엔지니어링학술지
    • /
    • 제11권2호
    • /
    • pp.51-59
    • /
    • 2015
  • It is generally recommended to use EVM as an efficient means for measuring project performance and progress so that the EVMS user could manage his project successfully. In spite of it's favorable intention, most project participants think it as a heavy load or a sub practiced job with low responsibility. Even though there are lots of variables triggering unpredictable troubles in EVM application, EVM still could be a valuable project health indicator. In this paper we introduce a performing method for EVM based on system engineering process.

APPLYING ELITIST GENETIC ALGORITHM TO RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM

  • Jin-Lee Kim;Ok-Kyue Kim
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.739-748
    • /
    • 2007
  • The objective of this research study is to develop the permutation-based genetic algorithm for solving the resource-constrained project scheduling problem in construction engineering by incorporating elitism into genetic algorithm. A key aspect of the algorithm was the development of the elitist roulette selection operator to preserve the best individual solution for the next generation so the improved solution can be obtained. Another notable characteristic is the application of the parallel schedule generation scheme to generate a feasible solution to the problem. Case studies with a standard test problem were presented to demonstrate the performance and accuracy of the algorithm. The computational results indicate that the proposed algorithm produces reasonably good solutions for the resource-constrained project scheduling problem.

  • PDF

THE RESEARCH OF CONSTRUCTION PROJECT MATERIALS REQUIREMENT SYSTEM

  • Pan Nai-Hsin
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.764-767
    • /
    • 2005
  • In the construction industry, materials management is one of the most important components in construction engineering life cycle. Materials management optimization is one of the research subjects in the field of construction management. In the materials management system of a construction project, the suitability of selecting procurement planning strategy will influence the result of project completion. This study conducts literature review at first and also refers the related issue in other industry's application. Associated with the characteristics of construction project in civil engineering and the concept of object oriented design applied in the materials management, this research is aimed to establish a construction materials requirement preliminary system.

  • PDF

A CASE STUDY OF CONSTRUCTION ENGINEERING FOR CABLE SUPPORTED BRIDGE BY COLLABORATIVE SYSTEM

  • Jung-Min Nam;Sung-Ho Kim;Jae-Hong Kim
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.586-590
    • /
    • 2011
  • This paper presents the case study of the CE by collaborative system and proposes a model of the CM group for the cable supported bridge. The cable supported bridges have a large project scale and need a high level of construction method. Therefore an advanced construction management system is required for successful completion of project. The construction management (CM) group which control design management, construction plan, subcontract, technical support and R&D is organized for the cable supported bridge project. The CM group established a collaborative system with construction site and drew an effective management of cost, process, quality, safety for each project. Furthermore, the CM group established the procedure of construction management based on the construction engineering (CE) items and performed the project management on the construction phase. Efficiency of cost reduction and site control is maximized by using a collaborative system.

  • PDF

대형 국가 R&D 프로젝트의 기술관리 프로세스 : 파이로 프로젝트를 중심으로 (Technical Management Processes for Large National R&D Projects : Focused on Pyro Project)

  • 김정국;고원일;구정회;남효온
    • 시스템엔지니어링학술지
    • /
    • 제13권2호
    • /
    • pp.34-41
    • /
    • 2017
  • The Pyro project, one of the large national R&D project to construct Korea Advanced Pyroprocessing Facility (KAPF), which has many goals such as development of pyro technology and process equipment, design of equipment and facility, construction, and test operation, is now under research and development. To reduce uncertainty and risk of such complex project, the technical management processes in systems engineering standards and NASA handbook were reviewed, and then the ten common technical management processes were selected for the large national R&D project to meet its goal successfully. And the essential technical management processes were finally suggested for Pyro project in consideration of current situation of the project.

TOTAL RISK INDEX FOR ASSESSING RISK LEVELS OF OVERSEAS CONSTRUCTION PROJECTS

  • Du Yon Kim;Seung Heon Han;Heedae Park
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1414-1418
    • /
    • 2009
  • International construction projects typically manifest difficult, complex, and varied types of risk exposures; because of this, there is a need for accurate evaluation of risk-integrated performances during the timeframe of project execution. Given the financial crisis currently affecting the world economy recession, risk management has become a more crucial part for the success of international project management. However, the majority of risk management approaches, particularly for overseas projects, are focused primarily on simple forms of checklists, formalization of risk variables affecting project performance for a specific phase, or more complicated computational methods that restricting practical utilization in real-world projects; moreover, these methods lack the conceptual basis to broadly visualize the level of risk over all phases of a project. This study suggests an efficient, yet simple risk-integrated total index to successfully assess the risk levels of overseas construction projects. To this end, this paper first investigates the life cycles and key processes of decision-making for a given project and then derives formulas to represent the total risk index (TRI) along the key decision-making processes. In addition, the study examines the relationships between TRI and performance levels based on the analysis of 126 real-world project samples. Validations using the proposed TRI showed a high correlation to project performance, signifying the usefulness of the proposed approach for construction firms when investigating the level of risks and key areas for management focus.

  • PDF