• Title/Summary/Keyword: Engineer Equipment

Search Result 94, Processing Time 0.02 seconds

Optimum Allocation Model of Military Engineer Equipments for Artillery Position Development (포병진지 구축을 위한 공병장비 최적배정 모형)

  • Jang, Young Cho;Lee, Moon Gul
    • Korean Management Science Review
    • /
    • v.34 no.2
    • /
    • pp.103-113
    • /
    • 2017
  • The artillery is a key element of the ground forces operation during wartime, and the military engineers support the artillery position development operation to support the smooth operation of the artillery. In establishing the artillery position development operation plan, the commander requires more than his intuition to find the best option reflecting a number of elements of the battlefield situation which changes every minute. Moreover, the number of available equipment is smaller than the number of required position developments, and the effective equipment operation becomes essential element of this issue. This study quantified the capability of the available engineering equipment, organized a number of teams enabling equipment to put out the maximum capacity based on the quantified figures, and formed the model which allocates the team to the developing points to minimize the developing time. The goal programming method was applied to resolve the problem. The developed model was applied to compare the total mission duration following the number of teams, the variable for commander's decision, and the result of this study can be used as the quantitative data for commander's decision making process in establishing the artillery position development support operation through effective equipment management.

HOW TO COMPOSE AND UTILIZE COMPARISION CHART OF MEDICAL EQUIPMENT FOR PURCHASING (의료기기 구입을 위한 의료기기(醫療機器)비교표 작성방법 및 활용방안)

  • Kim, Won-Kyou;Kang, Hee-Suk;Park, Min-Su;Kim, Tae-Jong;Kwon, Hyuk-Nam
    • Proceedings of the KOSOMBE Conference
    • /
    • v.1998 no.11
    • /
    • pp.108-109
    • /
    • 1998
  • As the need of enhanced medical treatment grows up, Purchasing step which include medical engineer's opinion has to be required. On this procedure, Medical Engineer Departments has used $\ulcorner$comparision chart$\lrcorner$. In this paper, How to compose and utilize comparison chart for purchasing of medical equipment by medical engineer in the hospital. It is made through the technical and objective investigation. From these points, We think that it can be available for proper installation and improved maintenance.

  • PDF

Mathematical model and heuristic for the assignment of military engineering equipments in ROK army (공병 장비의 최적할당을 위한 수리모형 및 휴리스틱 알고리즘)

  • Park, Jongbok;Ahn, Namsu
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.4
    • /
    • pp.138-144
    • /
    • 2020
  • The Army's engineers are carrying out a range of operations using various equipment, of which, artillery unit support is the representative engineering operation field. The main task of the artillery unit is to attack the enemy's center with firepower from the rear of a friendly force. The artillery must move its original position after firing several times to prevent exposure of the shooting position. This paper proposed a mathematical model and heuristic algorithm that can be used to determine the optimal allocation among engineer equipment, the team (work), and position while reflecting the constraints of the construction of an artillery position. The model proposed in this paper derived the optimal solution for the small size problems, but it takes a long time to derive the optimal solution for the problem of equipment placement of the engineer battalion and brigade scale. Although the heuristic suggested in this study does not guarantee the optimal solution, the solution could be obtained in a reasonable amount of time.

Study on the Optical Analysis Equipment Control System for Electronic Parts Inspection (전자 부품 검사용 광학분석 장비 제어시스템에 대한 연구)

  • Lee, Jun Ha
    • Journal of the Semiconductor & Display Technology
    • /
    • v.14 no.4
    • /
    • pp.67-71
    • /
    • 2015
  • Product of technology developed in this study is an external interface for controlling the equipment of pendant key remote control system circuit board, and it is used in the electronic component test equipment system. Main control system module is in the role as a device for controlling the various control devices that make up the integrated system for microscopic examination at the request of the host computer engineers to control the inspection equipment. The pentane-key interface module to its role as a device for controlling the various control devices that make up the integrated system for microscopic examination at the request of the host computer for the engineer to control the inspection equipment. Development of the control system can be expected in the configuration of a system for efficient and accurate inspection of high-precision parts.

A War-time Engineering Equipment's Assignment and Operation Model (전시 공병장비 할당 및 운용 모형)

  • Jae-Hyeong Lee;Moon-Gul Lee
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.46 no.4
    • /
    • pp.294-303
    • /
    • 2023
  • During wartime, the operation of engineering equipment plays a pivotal role in bolstering the combat prowess of military units. To fully harness this combat potential, it is imperative to provide efficient support precisely when and where it is needed most. While previous research has predominantly focused on optimizing equipment combinations to expedite individual mission performance, our model considers routing challenges encompassing multiple missions and temporal constraints. We implement a comprehensive analysis of potential wartime missions and developed a routing model for the operation of engineering equipment that takes into account multiple missions and their respective time windows of required start and completion time. Our approach focused on two primary objectives: maximizing overall capability and minimizing mission duration, all while adhering to a diverse set of constraints, including mission requirements, equipment availability, geographical locations, and time constraints.

긴급제언 - 해외건설 기자재의 국산화

  • Kim, Il
    • Journal of the Korean Professional Engineers Association
    • /
    • v.45 no.3
    • /
    • pp.23-27
    • /
    • 2012
  • This tractate inform that the localization of equipment has led to strong competitiveness through enact a provision of electricity(KEC : Korea Electrical Code) made by Korea Electric Association.

  • PDF