1 |
Y. Jang and M. Lee, "Optimum Allocation Model of Military Engineer Equipments for Artillery Position Development", Korean Management Science Review, Vol.34, No.2, pp.103-113, 2017. DOI: https://doi.org/10.7737/KMSR.2017.34.2.103
DOI
|
2 |
S. Park and M. Lee, "Optimal Allocation Heuristic Method of Military Engineering Equipments during Artillery Position Construction Operation", Journal of Society of Korea Industrial and Systems Engineering, Vol.40, No.1, pp.11-21, 2017. DOI: https://doi.org/10.11627/jkise.2017.40.1.011
DOI
|
3 |
J. Moon and S. Lee, "Study on Vehicle Routing Problem of Artillery Position Construction for Survivability Support", Journal of the Korean Institute of Industrial Engineers, Vol.37, No.3, pp.171-179, 2011. DOI: https://doi.org/10.11627/jkise.2017.40.1.011
DOI
|
4 |
M. Ahn, and I. Choi. "Study of Shortest Time Artillery Position Construction Plan", Journal of the Korea Academia-Industrial Cooperation Society, Vol. 17, No.6, pp.89-97, 2016. DOI: https://doi.org/10.5762/KAIS.2016.17.6.8
DOI
|
5 |
Dash Optimization, "Xpress Mosel 4.8.2", 2018.
|
6 |
ROK Army Training Doctrine Command, Data of Engineering Field(34-0-2), Korea Military printing Institution, 2013.
|
7 |
J. Choi et al., "Factors Affecting Selection and Combination of Earthwork Equipment", Proceedings of the Korean Institute of Building Construction Conference, Vol.10, No.1, pp.201-205, 2010.
|