• 제목/요약/키워드: Emergency power supply

검색결과 117건 처리시간 0.032초

소형 발전기의 부하측 고조파 유입시 HUNTING 방지회로 (On Hunting Protected Circuit at the Inflow about Load direction Harmonics of a Small Size the Generator)

  • 배종일;박병열
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 하계학술대회 논문집 D
    • /
    • pp.2668-2670
    • /
    • 2002
  • The generators of a small size below 100Kw are often used as power suppliers for emergency only in most domestic telecommunication companies. Serious twisted waves occur due to the inflow of harmonies from the generator into a S-type rectifier. And the increasing by stages of load upon the rectifier end up a stoppage of power supply during the serious hunting, which makes it difficult to supply power securely on the other part as well as that of communications. In case of long time of power failure the generators of a small size will be essential because the battery for emergency has a limit in capacity. Therefore it is necessary to solve the problems concerning the generators. This study is focused on the identifying and solving the problem including use of SCR elements connected to the generators.

  • PDF

FTA기법에 의한 원전기동전원의 이용율 예측에 관한 연구 (A Study on the Availability Prediction of Start-up Power Supply in Nuclear Power Plant by FTAMethod)

  • 최규식
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제48권5호
    • /
    • pp.517-523
    • /
    • 1999
  • The Start-up transformers or on-site stand-by transformers are installed for the start-up and shut-down of generator and emergency status in unclear power plant. The on-site power supply configuration using these transformers must be detemined by considering configuration requirements, site characteristics, reliability and availability severely because it is remarkably important for safety and benefit of plant. The start-up or stand-by power supply configuration has been determined considering only safety requirements and construction cost up to now in Korea. I study various reliability estimating methods for the prediction of availability, and estimate the unavailability for the start-up power supply system of two 1,000㎿ unclear power plants. I also detemine the reliability and unavailability and unavailavility of equipment, system and configuration using FTA method.

  • PDF

원전 비상전원 적용성 판단을 위한 다양한 C-rate 기반 원통형 리튬이온 배터리의 전기적 특성분석 및 모델링 (C-rate based electrical characteristics and equivalent circuit modeling of 18650 cylindrical Li-ion battery for nuclear power plant application)

  • 김건우;박성윤;박진형;김종훈;박성백;김영미
    • 전기전자학회논문지
    • /
    • 제23권2호
    • /
    • pp.667-674
    • /
    • 2019
  • 최근 발생한 원전 사고는 소외전원 및 비상전원의 기능이 상실되어 발전소 전체 정전이 발생한 사례를 계기로 원전의 비상전원공급용 배터리의 중요성이 부각되고 있다. 현재 원전의 비상전원공급용 배터리는 기존의 납축전지를 대신하여 리튬계열 배터리로 교체가 고려되고 있는 상황이다. 이에 따라 원통형 리튬 배터리의 적용성을 판단하기 위해 여러 가지 리튬 계열 배터리의 전기적 특성 실험을 진행하여 결과를 분석해야 한다. 본 논문은 현재 ESS(Energy Storage Systems)에 많이 사용되는 세 가지 타입의 리튬 배터리의 전기적 특성실험을 통해 적절한 배터리 타입을 선정하고, 선정된 배터리가 비상전원공급용 배터리로 사용될 때 최적의 C-rate를 제안한다. 또 배터리 모델링을 통해 배터리의 상태를 추정하며 문제점을 제시한다.

소방용 비상발전기의 현장부하시험을 위한 20 kW급 ESS 부하시험장치 모델링과 구현에 관한 연구 (A Study on the Implementation and Modeling of 20kW Scale ESS Load Test Device for Emergency Generator)

  • 최승규;이후동;최성식;페레이라 마리토;노대석
    • 한국산학기술학회논문지
    • /
    • 제20권9호
    • /
    • pp.541-550
    • /
    • 2019
  • 소방용 비상발전기는 화재 시 인명과 재산을 보호하는 소방 시설에 전원을 공급하는 중요한 설비이다. 이러한 중요성에 따라 관련 법규에서는 의무적으로 비상발전기에 비상용 부하를 연결하여 시험하도록 규정하고 있다. 그러나 실 계통에서는 비상전원계통의 부하운전 시험을 위해 상용 전원을 차단하는 경우 저압기기의 파손, 병원과 같은 중요시설의 응급부하 정지 등 심각한 문제점이 발생할 수 있어, 무부하로 비상발전기를 형식적으로 시험하고 있는 실정이다. 따라서, 본 논문에서는 상기의 문제점을 개선하기 위하여, 상용 전원의 차단 없이 비상발전기에 전기저장장치를 연계하여, 비상용부하의 동작특성과 동일하게 ESS가 충전동작을 수행함으로서 비상발전기의 성능 및 상태를 시험할 수 있는 방안을 제시한다. 또한, 배전계통 상용 해석 프로그램인 PSCAD/EMTDC를 이용하여, 비상발전기, 비상용부하, ESS 부하시험장치로 구성된 비상전원계통의 모델링을 제시하고, 20kW급 ESS 부하시험장치를 구현하여, 이를 바탕으로 다양한 시나리오에 따른 시뮬레이션과 시험을 수행하여 본 논문에서 제안한 ESS 부하시험 장치와 모델링의 유용성을 확인한다.

공간정보를 활용한 대도시권역 비상시 에너지 수요량 예측 (Energy Demand Estimation in Metropolitan Area in Case of Emergency using Spatial Information)

  • 남경목;이홍철;이동은
    • 한국건설관리학회논문집
    • /
    • 제20권3호
    • /
    • pp.105-112
    • /
    • 2019
  • 이상고온 현상으로 전력수요가 예측치를 초과하여 대규모 정전사태가 발생하고 있다. 과밀화된 도시의 경우, 예상치 못한 에너지 수급 차질은 막대한 경제적 피해를 초래하고 도시기능을 마비시키는 중요한 위협요소이다. 기존 비상전력 수요량을 추정하는 방법은 도시의 공간적 차원에서 현실적 수요량을 추정할 수 없어 비상시 예비전력 관리가 용이하지 않다. 본 논문은 도시의 공간정보와 건축물 용도별 평상시 에너지소비 원단위, 비상시 전력수요 원단위를 활용하여 비상전력수요의 공간적 분포를 규명하고, 이를 활용하여 비상전력 수요량을 예측하는 방법론을 제시한다.

디젤발전기 엔진 상태 진단 기술의 발전소 적용 연구 (A Study on the Power Plant Application of Engine Condition Diagnosis Technology for Diesel Generator)

  • 최광희;이상국
    • 동력기계공학회지
    • /
    • 제17권4호
    • /
    • pp.17-22
    • /
    • 2013
  • Diesel generator of nuclear power plant has a role for supply of emergency electric power to protect reactor core system in event of loss of off-site power supply. Therefore diesel generator should be tested periodically to verify the function that can supply specified frequency and voltage at design power level within limited time. For this purpose, appropriate maintenances in case that abnormal conditions were found are required in allowed time. In this paper, results of development of engine condition diagnosis technology and study on power plant of its technology for diesel generator are described.

매우 넓은 입력전압 범위를 갖는 스위치모드 플라이백 파워서플라이에 대한 연구 (Study of Flyback Switching Power Supply With Very Wide Input Voltage Range)

  • 나재두;이춘택;박형남;이용근
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2015년도 제46회 하계학술대회
    • /
    • pp.1008-1009
    • /
    • 2015
  • An emergency diesel generator system is an independent source of power that supports important electrical systems on loss of normal power supply. AVR(Automatic Voltage Regulator) is a regulator which regulates the output voltage at a nominal constant voltage level. Specially, a power supply for the AVR must be operated at the very wide input range. In this paper, a flyback power supply with very wide input voltage range is proposed.

  • PDF

신뢰도 높은 수전방식에 의한 무(無)정전 전원설비 구축방안 (Construction Of Uninterruptible Power System by Reliable Incoming Power Method)

  • 최진성;이상중
    • 한국조명전기설비학회:학술대회논문집
    • /
    • 한국조명전기설비학회 2007년도 추계학술대회 논문집
    • /
    • pp.367-371
    • /
    • 2007
  • 무(無)정전을 요구하는 특정대상의 중요 전기시설에서, 신뢰도 낮은 수전방식의 정전 가능성 대책으로 대용량의 UPS와 비상발전기를 설치 운영 중에 있다. 근래에 와서 상용전원과 발전기 또는 복수의 발전기에 CTTS (Closed Transition Transfer Switch)를 무(無)정전 전환개폐기 전용으로 사용하고 있다. 본 논문에서 CTTS를 신뢰도 높은 상용2회선 수전방식의 수전변압기 2차 측에 적용한 새로운 무(無)정전 전원설비 구축 방안을 제안하였다. 그 결과 수전설비 구성 간략화와, UPS 비상발전기 설치 최소화로 공간 및 투자절감 효과를 얻을 수 있다.

  • PDF

아크로 긴급시 부하차단 적용성 검토 (A Study on application of load cutting in emergency)

  • 박현택;김재철;임상국;허동렬
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2004년도 하계학술대회 논문집 A
    • /
    • pp.298-300
    • /
    • 2004
  • Arc-furnace facilities consume 9,895,165(MWh) which is about 69.6 Percent of electronic furnace power consumption. and interior of a country demand power have inclosed annual. but becaused of the problem of cost, power plant location, and environment have faced difficulty to electric power supply. In this paper, Examining Load cutting of Arc-furnace that is dominating high weight of industry electric power use. and it is expected to solve easily electric power supply and demand problem by highest Priority load cutting examination of Arc-furnace when electric power supply and demand problem happens to area electric power system when is urgent.

  • PDF

선박 비상조명 원격 모니터링 제어 (A Study on the Remote Monitoring and Control of Ship's Emergency Lighting System)

  • 양현숙;김건우;임현정;문정필;이성근;김윤식
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2005년도 전력전자학술대회 논문집
    • /
    • pp.207-210
    • /
    • 2005
  • This paper describes a design of several ship's emergency lighting system(SELS) that power factor is improved and power is controlled extensively, and techniques to control and monitor this system in remote distance by PC serial communication. The remote monitoring control system is composed of emergency power supply system (EPSS), half bridge(HB)inverter, fluorescent lamp(FL), microprocessor, multi communication interface. EPSS checks the voltage of the emergency backup battery in real time. In case that the voltage of 13[V] or less has been detected for 5[msec] or longer for 3 times in a row, charger circuit is connected for battery charging. Experimental works using proposed system confirm that speedy and stable power to be supplied when main power source cut-off, compared with conventional analog type, and input power up to 35.0[%] by adjusting of pulse frequency of the HB inverter.

  • PDF