• 제목/요약/키워드: Emergency Diesel Generator

검색결과 74건 처리시간 0.028초

비상발전기용 PM/NOX 저감장치의 유동특성 연구 (Flow Analysis of PM/NOX Reduction System for Emergency Generator)

  • 방효원;박기영;이성욱
    • 한국분무공학회지
    • /
    • 제26권4호
    • /
    • pp.163-170
    • /
    • 2021
  • Emergency generators normally use diesel engines. The generators need to conduct weekly no-load operation inspections to ensure stable performance at emergency situations. In particular, the generators with large diesel engines mainly use rectangle type filter substrates. In order to minimize hazardous emissions generated by generators, optimizing the reduction efficiency through CFD analysis of flow characteristics of PM/NOX reduction system is important. In this study, we analyzed internal flow by CFD, which is difficult to confirm by experimental method. The main factors in our numerical study are the changes of flow uniformity and back pressure. Therefore, changes in flow characteristics were studied according to urea injector locations, selective catalyst reduction (SCR) diffuser angle, and filter porosity.

실시간 시뮬레이터를 이용한 디젤발전기 여자시스템 현장시험 (A Field Test of Diesel Generator Excitation Control System Using Real Time Simulator)

  • 이주현;류호선;정태원
    • 전기학회논문지
    • /
    • 제59권7호
    • /
    • pp.1314-1319
    • /
    • 2010
  • The excitation control system of an emergency diesel generator is classified as a kind of safety-related system. Compared with other control systems in a power plant, this system is required to be more reliable and have better performance. KEPCO Research Institute successfully developed the excitation control system for a diesel generator. This paper presents its field test results by using a real time simulator on a nuclear power plant.

피크부하용 혼소엔진발전의 경제성 분석 (An Economic Analysis on Dual-fuel Engine Generation for Peak Load)

  • 이옥배;안재경
    • 전기학회논문지
    • /
    • 제61권9호
    • /
    • pp.1260-1268
    • /
    • 2012
  • Recently, lack of power reserve margin was observed quite often. In this paper, we studied the method to secure power source for a short time, to cut the utility power peak load, and to reduce the users electricity bills. Emergency diesel generator of an office building is to be converted into a dual-fuel engine generator which is responsible for a portion of the peak load. Compared to the conventional diesel fuel generator, the proposed dual-fuel engine is able to reduce the generation power cost by dual-fuel combustion, and it also mitigates the building's utility power peak load by charging the building's peak load. If the dead resources (a group of emergency dual-fuel engine generators), as a Virtual Power Plant, are operating in peak time, we can significantly reduce future large power development costs. We investigated the current general purpose electricity bills as well as the records of the building electric power usage, and calculated diesel engine generator renovation costs, generation fuel costs, driving conditions, and savings in electricity bills. The proposed dual-fuel engine generation method reduces 18.1% of utility power peak load, and turned out to be highly attractive investment alternative which shows more than 27% of IRR, 76 million won of NPV, and 20~53 months of payback periods. The results of this study are expected to be useful to developing the policy & strategy of the energy department.

화학 플랜트에서의 비상발전기 용량선정 방안(PG3)에 관한 연구 (Study on Emergency Generator Capacity Selection(PG3) in the Chemical Plant)

  • 이승재;조만영;김세용;김은태;강병욱;박한민;김재철
    • 조명전기설비학회논문지
    • /
    • 제29권12호
    • /
    • pp.55-60
    • /
    • 2015
  • PG and RG methods are widely known method for calculating the capacity of the emergency generator in construction electrical installation. PG and RG methods are mainly used as a saving a life, fire protection, fire fighting in construction. Because no long distance between the emergency generator and electric motor feeder, the relatively small motor power in construction electrical installation, the capacity of generator in PG and RG methods are little problem of voltage and reactive power of generator. However in many cases the application of the PG and RG method is difficult in the Chemical Plant because it is long distance between the generator and the motor Feeder and motor capacity is very large. Motor starting power factor is about 0.2 lagging power factor and motor starting current is about 6times during motor staring. Also Most of the staring current component is a reactive power component. therefore, it is many cases that lack of reactive power and excess of allowable voltage drop limit and After selection of emergency diesel generator, problems happen during motor starting. Therefore, to be selection of effective emergency generator, active generator power, reactive power and the required reactive power during large motor starting should be considered in chemical plant. It is also required of the verification process through simulation because hand calculation is very difficult considering study cases.

원자력발전소 비상디젤발전기의 가동중 진동저감 효과 (Operating Vibration Reduction Effect Evaluation of EDG at the NPP Site)

  • 김민규;전영선
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2006년도 추계학술대회논문집
    • /
    • pp.111-118
    • /
    • 2006
  • The Emergency Diesel Generator(EDG) is a very important piece of equipment for the safety of a Nuclear Power Plant(NPP). In this study, the operating vibration or three kinds or EDG system was measured. The target EDG systems art Yonggwang 5 unit, Ulchin 2 unit and Ulchin 3 unit. The Yonggwang 5 and Ulchin 3 unit EDG system is the same type but the foundation systems are different. One is an anchor bolt type and the other is a spring and viscous-damper type. The purpose of this measurement is for a verification of the vibration isolation effect according to the foundation system. As a result. it can he said that the spring and viscous damper system of the EDG performed well for the vibration isolation.

  • PDF

원자력발전소 안전 등급 1E 비상디젤발전기 리트로피트 (Retrofit) (Retrofit of Safety Class 1E Emergency Diesel Generator in Nuclear Power Plant)

  • 김철효;장중구
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2015년도 제46회 하계학술대회
    • /
    • pp.689-690
    • /
    • 2015
  • 국내 최초 원전인 고리1호기는 지난 2007년 30년의 운전수명을 마친 뒤 정부의 안전점검을 거쳐 10년간 연장운전에 들어갔다. 이 과정에서 원전의 비상 전원 계통 신뢰성 확보를 위해 설계수명을 초과한 35년 된 노후 비상디젤발전기(Emergency Diesel Generator, 이하 EDG)를 지난 2013년 4월부터 9월까지 약 6개월에 걸쳐 교체하게 되었으며, 국내 원전 EDG 총 42대 중 18대가 20년 넘게 운영되고 있고, 2025년까지 고리 1호기를 후속으로 월성1호기, 고리2호기, 고리3호기, 고리4호기, 한빛1호기 순으로 40년 승인된 운전 인허가 기간이 만료된다.[1]. 본 연구에서, Class 1E EDG 교체 시 신규 EDG 설계기준, 용량결정, 해석 및 평가에 대한 기술적 방법들을 고리1호기의 사례를 통해 고찰하였다.

  • PDF

비상 디젤발전기용 배전반의 내진안전성에 관한 연구 (A Study on the Seismic Stability of an Existing Switchboard for Emergency Diesel Generator)

  • 하능교;김재실
    • 한국산업융합학회 논문집
    • /
    • 제26권6_3호
    • /
    • pp.1341-1347
    • /
    • 2023
  • This study proposes to ensure the seismic stability of an existing switchboard for emergency diesel generator by applying mode analysis, static analysis and dynamic analysis. First, a three dimensional model for the swithboard was made with simplification for mode analysis. Next, The mode analysis for the finite element model of the existing switchboard was performed. The 1st natural frequency below 33 Hz, the seismic safety cutoff frequency, was calculated to be 21.943 Hz. Finally, based on the seismic stability theory, the von-Mises equivalent stresses derived by structural analysis and response spectrum analysis under the normal and faulted conditions were 74.179 MPa and 49.769 MPa, respectively. These are less than specified allowable stresses. So seismic stability was confirmed.