In order to cope with the changes of International Commercial Arbitration, the Shanghai International Economic and Trade Arbitration Commission (SHIAC) regulated an Emergency Arbitrator for the first time, implementing the arbitration rules in China (Shanghai) Pilot Free Trade Zone on May 1, 2014. Moreover, the China International Economic and Trade Arbitration Commission (CIETAC) also regulated the Emergency Arbitrator in the revised arbitration rules on January 1, 2015. However, it caused considerable contradiction that SHIAC and CIETAC admitted an interim measure decision by the Emergency Arbitrator under the circumstance that the Chinese court can impose a preservative measure in the Civil Procedure Code (CPC) and Arbiration Act. This study attempted to compare the main contents of an Emergency Arbitrator regulated in the arbitration rules of SHIAC and CIETAC with arbitration rules of representative arbitral institutions which operate an Emergency Arbitrator. In addition, this study verified the application features and problems through comparing the rule of SHIAC and CIETAC with the rule related to the preservative measure in Chinese law.
Arbitration has grown a unique resolving method for international commercial disputes. However, it has considered a similar court process, such as interim relief, during arbitration proceedings. Further, it would be asked for urgent measures before the arbitrators are constituted in the proceedings. In this case, the disputing party has to apply in the court. This is an unattractive factor in international arbitration; therefore, some institutions are trying to reform such an inconvenient system by adopting the emergency arbitrator. The purpose of this study is to look into ways of utilizing the emergency arbitrator for effective dispute resolution in shipbuilding and shipping industries. The emergency arbitrator needs to solve problems such as making a decision on leaving cargos in the ship, matters involving a ship arrest, or issues regarding vessels under construction. In order to utilize the emergency arbitrator system, it needs to make a close partnership with related institutions, prepare Korean-style standard shipbuilding and shipping contracts, and provide training programs for new emergency arbitrators and staff of institutions. Next, the arbitration institution has to have a great working relationship with a court. Finally, it should try to implement a new system, such as on-line service, for the procedures of the emergency arbitrator.
This paper is to review the interim measures of arbitral tribunals in international commercial arbitration and to compare the emergency arbitrator systems of international arbitration institutions including the ICDR, SCC, SIAC, ACICA, and ICC. Most arbitration legislation and arbitration rules permit the arbitral tribunal to grant orders for interim measures of protection. Orders for interim measures by the arbitral tribunal are not self-enforcing. However, the revised articles with regard to interim measures of UNCITRAL Model Law of 2006 are regarded to contribute significantly to the effectiveness of interim measures in international commercial arbitration. A party that needs urgent interim or conservatory measures that cannot await the constitution of an arbitral tribunal may make an application for such measures. Major international arbitration institutions have their own rules and provisions for the emergency arbitrator system, which was set forth first by the ICRD in 2006. The application requirements for emergency arbitrators are almost the same. However, there are significant differences in details such as appointments and applications for challenging emergency arbitrators, the process and form of the emergency arbitrator's decision, etc. Therefore, it will be necessary to consider these differences for more desirable emergency arbitrator proceedings in Korea.
This article examines the requirements of Article 37 of the ICDR International Arbitration Rules and issues that could arise if a party petitions a U.S. Federal Court to enforce an emergency arbitrator's Article 37 decision to grant pre-arbitration provisional relief. On May 1, 2006, ICDR introduced a new procedure for the granting of emergency arbitral relief under its ICDR Rules. The procedure enables a party to apply for emergency interim relief before the appointment of an arbitrator or tribunal to adjudicate the merits of the dispute. Instead, the application for emergency relief is considered by an emergency arbitrator appointed by the ICDR. In short, the ICDR has quickly appointed emergency arbitrator and resolved a challenge to an appointment within 36 hours. In addition, the emergency decisions have been issued within just a couple of weeks. In particular, we looked at what would happen after Article 37 emergency relief is granted. Based on my examination of U.S. cases on the enforceability of interim awards and orders, We conclude that U.S. courts would enforce Article 37 interim measures, whether they are characterized by the emergency arbitrator as an interim order or award. Where the situation warrants, arbitration executives should embrace and use emergency relief procedure of ICDR Rules.
Two years ago, an emergency arbitrator procedure in accordance with the international arbitration rule has been finally adopted in Korea?a decade after its introduction. Arbitral institutions provide interim measures in the course of tribunal proceedings to avoid litigation in open court that is often expensive and time-consuming. An emergency arbitrator procedure offers an urgent relief prior to the constitution of an arbitral tribunal, thus enhancing the speed and effectiveness of the arbitration procedure even further. Although most of the arbitral institutions interpret that the emergency arbitration rulings are binding on the parties, enforcing the emergency arbitration provisions have some difficulties in practice, and it is not clear whether or not arbitral interim measures will be enforceable under the newly adopted provisions in Korea. In this study, experiences in other countries are explored in seeking for the possible problems and solutions of enforcing the emergency arbitration rulings. For example, Singapore and Hong Kong insert terms such as "finality," "enforceable in the same manner as an order or direction of the Court," "same effect as an arbitral tribunal or interim measures" in their emergency arbitrator legislation to enhance enforcement. Moreover, "urgency inherent" are considered.
The purpose of Emergency Arbitrator System is to provide parties with the possibility of obtaining interim measures before constitution of the arbitral tribunal. This paper examines the Emergency Arbitrator System set forth in Article 32 and Appendix II of Arbitration Rules of Stockholm Chamber of Commerce (SCC) in comparison with Article 37 of ICDR International Arbitration Rules. This paper also provides a case study of 4 Decisions rendered by Emergency Arbitrators under the auspices of SCC in 2010. It was found that it took only 4 days on average from the date upon which the request for emergency interim measures was registered to SCC to the decision rendered by Emergency Arbitrators. The figures of average days reflect its rapidity well, one of the most preferred characteristics of arbitration. However, a case study of SCC decisions shows that only one request for interim measures was successfully granted. In other words, it was found that the requirements for granting of interim measures by emergency arbitrator were quite strictly applied. If interim measures is to be granted, it was found that the requesting party should prove to satisfy the requirements for granting of interim measures as follows: First, the requesting party has to demonstrate that it may suffer irreparable or serious harm in commercially-sensible, not in a strictly literal sense unless the interim measure is granted. Second, the party requesting interim measures has to persuade the Emergency Arbitrator that the request was of an urgent nature. Third, the requesting party is required to meet the reasonable possibility that it may succeed on the merits of the claim.
Last year, Seoul International Dispute Resolution Center(SIDRC) was set up to facilitate and promote international arbitration in Korea. This study was focused on the revision of arbitration rules such as ICC, SIAC, HKIAC and JCAA. As a leading arbitration institution in the world, ICC has tried continuously to provide more efficient service to their client by adopting emergency arbitrator(EA) & multi party arbitration. Other three institutions also introduced almost same mechanism to compete each other. These two new system is very innovative in international arbitration. First of all, EA was designed to provide interim measure service to preserve or protect parties' right before the constitution of arbitral tribunal. Arbitration institutions and arbitral tribunals should be careful to decide these requests are legitimate or not because too hasty approval on joinder or consolidation without full consideration such as parties' intention or argument may issue another serious problem - setting aside an award rendered after joined or consolidated.
In an era where the international investment and trade between Korea and China grow daily, the importance of international arbitration cannot be overstated. The Korean Arbitration Law was enacted with reference to the UNCITRAL Model Law. When the Chinese Arbitration Law was being enacted, the UNCITRAL Model Law was also referred to, but there are some discrepancies between the two. This article conducts comparative analysis based on the Korean and the Chinese Arbitration Laws, the Chinese Civil Procedure Law and the KCAB and the CIETAC arbitration rules. In order to adopt the UNCITRAL Model Law amended in 2006, Korea revised its Arbitration Law in 2016. The revised Law includes a more comprehensive legal regime regarding interim measures, emergency arbitrator, etc. In China, the enforcement of foreign-related arbitral awards and foreign arbitral awards is carried out mainly by intermediate people's courts. In China, the report system to the higher people's court for refusing the enforcement of foreign-related arbitral awards and for refusing the recognition or enforcement of foreign arbitral awards has the effect of safeguarding foreign-related arbitral awards and foreign arbitral awards in China. Both Korea and China joined the New York Convention, and domestic courts may refuse the recognition and enforcement of foreign arbitral awards according to the New York Convention.
The International Chamber of Commerce (ICC) has published revised rules of arbitration, which come into force on 1 January 2012 (the ICC Rules 2012). The ICC Rules 2012 apply to all arbitrations commenced on or after 1 January 2012, unless the parties have agreed to submit their arbitration to the rules in effect on the date of their arbitration agreement (Article 6(1)). The ICC Rules 2012 explicitly require both the arbitrators and the parties to make every effort to conduct the arbitration in an expeditious and cost-effective manner. The changes will force participants to define more aspects of their claims and outline the merits of the dispute earlier on in the process. The Rules also contain new penalties for behaving in a way that undermines the process's efficiency. The new Rules permit the tribunal, when making allocating costs, to take into account the extent to which each party has conducted the arbitration in an expeditious and cost-effective manner. Entirely new provisions relate to the emergency arbitrators, case management, and multi-party arbitrations. The ICC Rules 2012 take into account developments in arbitration practice and procedure, and in information technology, since the last revision of the rules in 1998, the aim being to provide modern and flexible procedures that promote efficiency in the arbitral process.
Recently the abusive calls on on-demand bonds have been a critical issue among many engineering and construction companies in Korea. On-demand bond is referred to as an independent guarantee in the sense that the guarantee is independent from its underlying contract although it was issued based on such underlying contract. For this reason, the issuing bank is not required to and/or entitled to look into whether there really is a breach of underlying contract in relation to the call on demand-bonds. Due to this kind of principle of independence, the applicant has to run the risk of the on demand bond being called by the beneficiary without due grounds. Only where the call proves to be fraudulent or abusive in a very clear way, the issuing bank would not be obligated to pay the bond proceeds for the call on on-demand bonds. In order to prevent the issuing bank from paying the proceeds under the on-demand bond, the applicant usually files with its competent court an application for injunction prohibiting the beneficiary from calling against the issuing bank. However, it is in practice difficult for the applicant to prove the beneficiary's call on the bond to be fraudulent since the courts in almost all the jurisdictions of advanced countries require very strict and objective evidences such as the documents which were signed by the owner (beneficiary) or any other third party like the engineer. There is another way of preventing the beneficiary from calling on the bond, which is often utilized especially in the United Kingdom or Western European countries such as Germany. Based upon the underlying contract, the contractor which is at the same time the applicant of on-demand bond requests the court to order the owner (the beneficiary) not to call on the bond. In this case, there apparently seems to be no reason why the court should apply the strict fraud rule to determine whether to grant an injunction in that the underlying legal relationship was created based on a construction contract rather than a bond. However, in most jurisdictions except for United Kingdom and Singapore, the court also applies the strict fraud rule on the ground that the parties promised to make the on-demand bond issued under the construction contract. This kind of injunction is highly unlikely to be utilized on the international level because it is very difficult in normal situations to establish the international jurisdiction towards the beneficiary which will be usually located outside the jurisdiction of the relevant court. This kind of injunction ordering the owner not to call on the bond can be rendered by the arbitrator as well even though the arbitrator has no coercive power for the owner to follow it. Normally there would be no arbitral tribunal existing at the time of the bond being called. In this case, the emergency arbitrator which most of the international arbitration rules such as ICC, LCIA and SIAC, etc. adopt can be utilized. Finally, the contractor can block the issuing bank from paying the bond proceeds by way of a provisional attachment in case where it also has rights to claim some unpaid interim payments or damages. This is the preservative measure under civil law system, which the lawyers from common law system are not familiar with. As explained in this article, it is very difficult to block the issuing bank from paying in response to the bond call by the beneficiary even if the call has no valid ground under the underlying construction contract. Therefore, it is necessary for the applicants who are normally engineering and construction companies to be prudent to make on-demand bonds issued. They need to take into account the creditability of the project owner as well as trustworthiness of the judiciary system of the country where the owner is domiciled.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.