The Transactions of The Korean Institute of Electrical Engineers
/
v.57
no.9
/
pp.1531-1535
/
2008
In the past vertically integrated power system, the power utility forecasted power demand and invested new power plants to keep a system adequacy. However, in the competitive electricity markets, a principle part of the capacity investment is market participants who decided the investment to maximize their profit. Especially, one of the main factors in their long-term decision making is the retrieval of fixed costs (construction costs). This paper presents the capacity payment in electricity power markets. The capacity payment (CP) in Cost Based Pool (CBP) is needed to recover fixed costs. However, CP in CBP was applied not only recovering fixed costs but also ensuring supply reliability. In order to operate harmonious power markets, pool needs reasonable CP mechanism. This paper analysis CP using capacity proportion and Reliability Pricing Model (RPM).
With the restructuring of the electric power industry during the past decade, operation and control strategies have undergone a shift in paradigm. Certain activities that were earlier considered as part of the integrated electricity supply(such as voltage and frequency control) are now treated as separate services and often independently managed and accounted for. This paper examines the management of reactive power services in deregulated electricity markets around the world. From the review several diverse methods for handling reactive power within the deregulated market framework emerges. While in many of the markets, proper financial compensation mechanisms exist to compensate the providers for their service, some others continue to handle reactive power through regulatory frameworks and technical operation guidelines.
KIEE International Transactions on Power Engineering
/
v.4A
no.3
/
pp.159-166
/
2004
Forecasting prices in electricity markets is critical for consumers and producers in planning their operations and managing their price risk. We utilize the generalized autoregressive conditionally heteroskedastic (GARCH) method to forecast the electricity prices in two regions of New York: New York City and Central New York State. We contrast the one-day forecasts of the GARCH against techniques such as dynamic regression, transfer function models, and exponential smoothing. We also examine the effect on our forecasting of omitting some of the extreme values in the electricity prices. We show that accounting for the extreme values and the heteroskedactic variance in the electricity price time-series can significantly improve the accuracy of the forecasting. Additionally, we document the higher volatility in New York City electricity prices. Differences in volatility between regions are important in the pricing of electricity options and for analyzing market performance.
The introduction of competition in the generation of electricity has raised the fundamental question of whether markets provide the right incentives for the provision of the capacity needed to maintain system reliability. Capacity mechanisms are adopted around the world to guarantee appropriate level of investment in electricity generation capacity. In this study, we discuss these approaches and analyze the capacity pricing mechanisms from the adequacy perspective. We conclude that the design of capacity mechanism is very important to decrease electricity spot price and increase total electric capacity. Specifically, the constant of capacity pricing mechanism made a difference to the performance of electricity market. However, the slope of capacity price mechanism is better than the constant of that in improving performance of electricity market.
For electricity markets to function in a truly competitive and efficient manner, it is not enough to focus solely on improving the efficiencies of power supply. To recognize price-responsive load as a reliability resource, the customer must be provided with price signals and an instrument to respond to these signals, preferably automatically. This paper attempts to develop the Windows-based load management system in competitive electricity markets, allowing the user to monitor the current energy consumption or billing information, to analyze the historical data, and to implement the consumption strategy for cost savings with nine possible scenarios adopted. Finally, this modeling framework will serve as a template containing the basic concepts that any load management system should address.
The introduction of competition in electricity markets emphasizes the importance of sufficient transmission capacities to guarantee effective power transactions. Therefore, for the economic and stable electric power system operation, transmission security constrains should be incorporated into the dispatch scheduling problem. With the intent to solve this problem, we decompose a dispatch scheduling problem into a master problem(MP) and several subproblems(SPs) using Benders decomposition. The MP solves a general optimal power flow(OPF) problem while the SPs inspect the feasibility of OPF solution under respective transmission line contingencies. If a dispatch scheduling solution given by the MP violates transmission security constraints, then additional constraints corresponding to the violations are imposed to the MP. Through this iterative process between the MP and SPs, we derive an optimal dispatch schedule incorporating the post-contingency corrective rescheduling. In addition, we consider interruptible loads as active control variables since the interruptible loads can participate as generators in competitive electricity markets. Numerical examples demonstrate the efficiency of the proposed algorithm.
The Transactions of the Korean Institute of Electrical Engineers A
/
v.52
no.9
/
pp.542-549
/
2003
In this paper, a novel approach to generator maintenance scheduling strategy in competitive electricity markets based on non-cooperative dynamic game theory is presented. The main contribution of this study can be considered to develop a game-theoretic framework for analyzing strategic behaviors of generating companies (Gencos) from the standpoints of the generator maintenance-scheduling problem (GMP) game. To obtain the equilibrium solution for the GMP game, the GMP problem is formulated as a dynamic non-cooperative game with complete information. In the proposed game, the players correspond to the profit-maximizing individual Gencos, and the payoff of each player is defined as the profits from the energy market. The optimal maintenance schedule is defined by subgame perfect equilibrium of the game. Numerical results for two-Genco system by both proposed method and conventional one are used to demonstrate that 1) the proposed framework can be successfully applied in analyzing the strategic behaviors of each Genco in changed markets and 2) both methods show considerably different results in terms of market stability or system reliability. The result indicates that generator maintenance scheduling strategy is one of the crucial strategic decision-makings whereby Gencos can maximize their profits in a competitive market environment.
Journal of the Korean Institute of Intelligent Systems
/
v.24
no.4
/
pp.379-384
/
2014
This paper proposes a Cournot model that can be used to analyze the strategic behaviors of generation companies which try to maximize their profits in an imperfectly competitive electricity and carbon markets. The proposed model consists of two parts. First, the strategic behaviors of generation companies are modeled based on the Cournot theory. Second, the market operation is modeled based on the assumption that the market operator tries to maximize the total social welfare in consideration of environmental welfare. To find the Nash equilibrium of the proposed model, the two-level optimization technique is used. The proposed method has been applied to an illustrative example of oligopolistic markets. We found that the proposed method has strong potential to analyze the influence of the strategic biddings of the generation companies and the impact of renewable generator on markets where the competitiveness of the markets is not fully developed.
Park, Man-Guen;Cho, Seong-Bin;Chung, Koo-Hyung;Moon, Kyeong-Seob;Roh, Jae-Hyung
Journal of Electrical Engineering and Technology
/
v.9
no.6
/
pp.1851-1863
/
2014
Many countries are increasing their investments in smart grid technology to enhance energy efficiency, address climate change, and trigger a green energy revolution. In addition to these goals, Korea also seeks to promote national competitiveness, prepare for the growth of the renewable energy industry, and export industrialization through its strategic promotion of the smart grid. Given its inherent representativeness for Korean implementation of the smart grid and its growth potential, Jeju Island was selected by the Korean government as the site for smart grid testing in June 2009. This paper presents a new design for the electricity market and an operational scheme for testing Smart Electricity Services in the Jeju smart grid demonstration project. The Jeju smart grid test-bed electricity market is constructed on the basis of day-ahead and real-time markets to provide two-way electricity transaction environments. The experience of the test-bed market operation shows that the competitive electricity market can facilitate the smart grid deployment in Korea by allowing various demand side resources to be active market players.
Lee, Cheon-Ho;Han, Seok-Man;Chung, Koo-Hyung;Kang, Dong-Ju;Kim, Bal-Ho H.
The Transactions of The Korean Institute of Electrical Engineers
/
v.57
no.8
/
pp.1327-1333
/
2008
Since Cost Based Pool markets has been continued to power markets, Genco. needs economic analysis about investment in power plants. Particularly most Private Genco.s have presently a construction plan about LNG combined cycle thermal power plants. In this paper, we propose a economic analysis method of LNG combined cycle thermal power plants using Economic Dispatch and Optimal Power Flow in CBP markets. Also we develope computation model using it for decision making to build a plant. This method can consider a variation of power facility like power plants and transmission lines in CBP markets. Finally, this dissertation provides a relevant case study to confirm the effect of cost factor to economical efficiency.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.