빌딩 내 최대 풍력발전설비 연계를 위한 소형풍력발전원 구성에 관한 연구 (A Study on Configuration of Small Wind Turbines for Maximum Capacity of Wind Power Systems Interconnected With a Building)

  • 이여진;김성열
    • 전기학회논문지
    • /
    • 제66권4호
    • /
    • pp.605-612
    • /
    • 2017
  • One of the biggest environmental issues that our world has been facing is climate change. In order to cope with such environmental issues, the world is putting a great deal of effort into energy conservation. The building sector, in particular, consumes 36% of the energy consumed worldwide and emits considerable amount of greenhouse gases. Therefore, introduction of renewable energies in the building sector is highly recommended. Renewable energy sources that can be utilized in the building sector include sunlight, solar heat, geothermal heat, fuel cells and wind power. The wind power generation system which converts wind energy into electrical energy has advantages in that wind is an unlimited and pollution-free resource. It is suitable to be connected to existing buildings because many years of operational experience and the enhanced stability of the system have made it possible to downsize the electrical generator. In case of existing buildings, it is necessary to consider the live loads of the buildings to connect the wind power generation system. This paper, through the connection of the wind power generation with existing buildings, promotes reduction of greenhouse gas emissions and energy independence by reducing energy consumption in the building sector. In order to connect the wind power generation system with an exciting building, the live load of the building and the area of the rooftop should be considered. The installable model is selected by comparing the live load of the building and the load of the wind power generation system. The maximum number of the wind turbines that can be installed is obtained by considering the separation distance between the wind turbines within the area of the rooftop. Installations are divided into single installations and multiple installations of two different types of wind turbines. After determining the maximum installable number, the optimal model that can achieve the maximum annual power generation will be selected by comparing the respective total annual amount of the power generation of different models.

건축물 전기설비의 고조파에 관한 사례연구 (A Case Study of Harmonics in Electrical Installations of Buildings)

  • 고희석;김성삼;이현무;김주찬;류희석
    • 한국조명전기설비학회:학술대회논문집
    • /
    • 한국조명전기설비학회 2003년도 학술대회논문집
    • /
    • pp.283-288
    • /
    • 2003
  • This paper presents the result of survey of case study for Harmonics in electrical Installations of buildings. Recently, many power electronic equipments(power converter, computers, air conditioners electronic ballasts for fluorescent lamps and so on) are used in office buildings, and harmonic current from them influence the other equipments in a distribution line. Notably, voltage distortion or voltage harmonics may approach or exceed is allowable level in power distribution system. Individual electric power consumers and end-users and responsible for reducing current harmonics while companies or utilities are responsible for reducing voltage harmonics at the point of common coupling in distribution system. As for harmonics, which one of the electric power qualities, it becomes important to obtain harmonic voltage/current distribution of the power system precisely because the use of power electronic apparatus in increasing. However, there are some difficulties on evaluating the measured data in comparison with the simulated result. The primary cause was indentitied with the resonance of harmonics form many sources. To suppress harmonics in electrical installations of buildings, one of many methods suggest that resonance frequencies are controlled by modulating the capacities of high-voltage customer's capacitors.

  • PDF

성과중심교육을 위한 옥내배선설비공사 수업 설계 교재 개발 (Course Design Manual Development on the Job of Indoor Wiring Installations Using ISD and DACUM process for Work Based Curriculum Development)

  • 김세동;김효진
    • 한국조명전기설비학회:학술대회논문집
    • /
    • 한국조명전기설비학회 2002년도 학술대회논문집
    • /
    • pp.363-368
    • /
    • 2002
  • Performance-based course design on the job of receiving substation installations is presented to achieve a work based curriculum development. It includes a job analysis method called ISD(Instructional Systems Design & Development) and DACUM(Developing a Curriculum) which is designed to accept various requirements of industrial fields. It is provided with course profile, key contents, terminal learning objectives, intermediate learning objectives, instruction strategy, instruction sequence, case study, action learning and lesson plan.

  • PDF

DACUM 및 ISD 수업설계 분석을 통한 자가용 변전설비공사 실무 교계 개발 (Course Design Manual Development on the Sob of deceiving Substation Installations Using ISD and DACUM process for Work Based Curriculum Development)

  • 김세동;김효진
    • 한국조명전기설비학회:학술대회논문집
    • /
    • 한국조명전기설비학회 2001년도 학술대회논문집
    • /
    • pp.151-156
    • /
    • 2001
  • Performance-based course design on the job of receiving substation installations is presented to achieve a work based curriculum development. It includes a job analysis method called ISD(Instructional Systems Design & Development) and DACUM(Developing a Curriculum) which is designed to accept various requirements of industrial fields. It is provided with course profile, key contents, terminal learning objectives, intermediate learning objectives, instruction strategy, instruction sequence, case study, action learning and lesson plan.

  • PDF

Maximization of Transmission System Loadability with Optimal FACTS Installation Strategy

  • Chang, Ya-Chin;Chang, Rung-Fang
    • Journal of Electrical Engineering and Technology
    • /
    • 제8권5호
    • /
    • pp.991-1001
    • /
    • 2013
  • Instead of building new substations or transmission lines, proper installation of flexible AC transmission systems (FACTS) devices can make the transmission networks accommodate more power transfers with less expansion cost. In this paper, the problem to maximize power system loadability by optimally installing two types of FACTS devices, namely static var compensator (SVC) and thyristor controlled series compensator (TCSC), is formulated as a mixed discrete-continuous nonlinear optimization problem (MDCP). To reduce the complexity of the problem, the locations suitable for SVC and TCSC installations are first investigated with tangent vector technique and real power flow performance index (PI) sensitivity factor and, with the specified locations for SVC and TCSC installations, a set of schemes is formed. For each scheme with the specific locations for SVC and TCSC installations, the MDCP is reduced to a continuous nonlinear optimization problem and the computing efficiency can be largely improved. Finally, to cope with the technical and economic concerns simultaneously, the scheme with the biggest utilization index value is recommended. The IEEE-14 bus system and a practical power system are used to validate the proposed method.

자가용전기설비의 사용전 자율검사제도 도입추진방안 (Research on Pre-service Inspection on Electrical Installations for Private Use based on Self-reliance)

  • 김한영;류기현;황민수
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 제36회 하계학술대회 논문집 전기설비
    • /
    • pp.112-114
    • /
    • 2005
  • It is obvious that electrical safety cannot be secured soley by the efforts from public sector including government. With the global trend of deregulation as WTO/TBT agreement comes into effect, foreign countries strive to minimize unnecessary and inefficient regulations in every field by sharing responsibilities with the privae sector to secure international competency in trade. To this same end, in this paper 2 level approach plan is suggested to pave the way to the self-security system in electrical field by introducing self-reliance safety system by stage for pre-service inspection on the electrical installations for private use based on product requirements in terms of performance.

  • PDF

Capacity Optimizing method of Distributed Generators in Stand-Alone Microgrid Considering Grid Link-Characteristics

  • Han, Soo-Kyeong;Choi, Hyeong-Jin;Cho, Soo-Hwan
    • Journal of Electrical Engineering and Technology
    • /
    • 제13권4호
    • /
    • pp.1483-1493
    • /
    • 2018
  • Recently, more power facilities are needed to cope with the increasing electric demand. However, the additional construction of generators, transmission and distribution installations is not easy because of environmental problems and citizen's complaints. Under this circumstance, a microgrid system with distributed renewable resources emerges as an alternative of the traditional power systems. Moreover, the configuration of power system changes with more DC loads and more DC installations. This paper is written to introduce an idea of a genetic algorithm-based solution to determine the optimal capacity of the distributed generators depending on the types of system configuration: AC-link, DC-link and Hybrid-link types. In this paper, photovoltaic, wind turbine, energy storage system and diesel generator are considered as distributed generators and the feasibility of the proposed algorithm is verified by comparing the calculated capacity of each distributed resource with HOMER simulation results for 3 types of system configuration.

노이즈 저감을 위한 접지시스템 진단 엔지니어링 (Diagnosis Engineering of Grounding System to Reduce Noise Signals)

  • 조대훈;이기식
    • 전기학회논문지
    • /
    • 제65권7호
    • /
    • pp.1290-1294
    • /
    • 2016
  • In this study, we investigate the sources of system malfunctions by measuring and diagnosing various surges and noise signals from grounding systems for electrical and electronic systems and installations in order to ensure the reliability and stability of the system operations. We measured performance or structural problems detected in the grounding systems currently in operation and analyzed the measured data in order to eliminate noise currents and interferences causing the systems to malfunction and be damaged. Based on the analysis results, we proposed improving grounding systems and the wiring arrangements most appropriate for the grounding systems and carried out the installations as per the proposed engineering. We verified that the proposed engineering made the status of system operations improved by measuring the ground noise signals during the system operations and comparing them before and after improvements being carried out.

의료용 절연변압기에 연결하는 의료 IT시스템의 안전에 관한 연구 (A Study on the Safety of Medical IT System connecting Medical Insulation Transformer in Medical Locations)

  • 김세동;김은식;박정일;최형식
    • 조명전기설비학회논문지
    • /
    • 제25권5호
    • /
    • pp.61-66
    • /
    • 2011
  • An accidental disconnection of power supply for operating theatres may result in fatal accidents. Thus, it is necessary to import the electric safety system in medical locations. This paper shows an analysis of simulation for the safety in medical IT system based on KS C IEC 60364-7-710(Electrical Installations of Buildings - Requirements for special installations or locations - Medical locations). The analysis was progressed by measuring leakage currents according to variation of volts, circuits and loads. And it was made database for calculation the reasonable length of branch circuit.