• Title/Summary/Keyword: Electrical Installation

Search Result 6,502, Processing Time 0.032 seconds

Algorithm Deciding Offshore Cable Layout Valid for Integrated Power Supply Between Adjacent Islands (근거리 도서간 통합전력공급에 유효한 해저케이블 포설 방안 결정 알고리즘)

  • Kim, Mi-Young;Rho, Dae-Seok;Moon, Guk-Hyun;Seo, In-Yong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.2
    • /
    • pp.28-36
    • /
    • 2018
  • Islands are supplied with power from diesel generation or from photovoltaic power generation, and problems with offshore environmental impacts (age deterioration, salt pollution), environmental pollution (exhaust gas, noise, dust) and power generation costs (installation, maintenance) have increasingly emerged. In 2016, the cost recovery rate was only 27%, and deficits reached 73% on 65 islands managed by KEPCO. In terms of deficits, the costs incurred in the power generation sector accounted for 91%, with the ratio of fixed costs at about 60%. Analysis suggests that operating costs can be reduced with an optimal power supply system that improves power generation efficiency and makes operating systems more efficient. Therefore, it is possible to simplify fuel transportation and facility maintenance, because one island integrates the power plants of remote islands, and offshore cable is used to supply power to the other islands. From the economic evaluations in this paper, an algorithm deciding offshore cable layout validity for an integrated power supply between adjacent islands is presented. Simulation results based on the proposed algorithm confirmed that an integrated power supply is economical for existing stand-alone operations on islands having diesel generation, low peak power, and near distances.

A Case Study on the Islanding Detection Protection of PV System and ESS System (태양광 발전과 ESS 시스템의 연계운전시 단독운전 방지 사례 연구)

  • Lim, Jong Rok;Hwang, Hye-Mi;Shin, Woo Gyun;Ju, Young-Chul;Jung, Young Seok;Kang, Gi-Hwan;Ko, Suk-Whan
    • Journal of the Korean Solar Energy Society
    • /
    • v.39 no.1
    • /
    • pp.59-66
    • /
    • 2019
  • BIPV or BAPV installation applied to building is increasing through public utility mandates enterprise. Solar PV energy generates only during the day, but if it is operated in convergence with ESS, which stores electrical energy, it can restrain the fossil energy used in buildings throughout the day. A solution is to converge with PV system and ESS. However, PV systems and ESS connected to the power grid in parallel can cause problems of electrical stability. A study was conducted on the case of failure to detect islanding operation under the parallel operation of PV generation and ESS that are connected in parallel to power grid. Experiments conducted various non-islanding detections under the operating conditions. In the experiment results, when one PCS - PV inverter or ESS inverter - was operating under the islanding condition, it stopped working within 0.5 seconds of the Korean grid standard. However, when both of PV inverter and ESS inverter were operating at the same time under the islanding situation, the anti-islanding algorithm did not operate normally and both inverters continuously supplied power to the connected RLC loads. islanding detection Algorithm developed by each inverter manufacturer has caused this phenomenon. Therefore, this paper presented a new test standard for islanding detection.

Necessity to incorporate XR-based Training Contents Focused on Cable pulling using Winches in the Shipbuilding (윈치를 활용한 케이블 포설을 중심으로 고찰한 XR 기반 훈련 콘텐츠 도입의 필요성)

  • JongMin Lee;JongSeong Kim
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.28 no.6
    • /
    • pp.53-62
    • /
    • 2023
  • This paper has suggested the necessity of introducing training contents using XR(Extended reality) technology as a way to lower the high rate of nursing accidents among unskilled technical personnel in domestic shipbuilding industry, focusing on cable pulling using winch. The occurrence rate of nursing accidents in the domestic shipbuilding industry was almost double(197.4%) (2017~2020) when compared with other manufacturing industries. In particular, it is worth noting that more than 31.8% of nursing accidents in the shipbuilding industry occurred among workers whose job experience is no more than 6 months. Most of new workers are seen to have hard time due to several factors such as lack of work information, inexperience, and unfamiliarity with the working environments. This indicates that it is essential to incorporate more effective training method that could help new workers become familiar with technical skills as well as working environments in a short period of time. Currently, education/training at the domestic shipyard is biased toward technical skills such as welding, painting, machine installation, and electrical installation. Contrary, even more important training required to get new workers used to the working environment has remained at a superficial level such as explaining ship building processes using 2D drawings. This may be the reason why it is inevitable to repeat similar training at OJT (On-the-Job Training) even at the leading domestic companies. Domestic shipbuilding industries have been attracting a lot of new workers thanks to recent economic recovery, which is very likely to increase the occurrence of disasters. In this paper, the introduction of training using XR technology was proposed, and as a specific example, the process of pulling cables using winches on ships was implemented as XR-based training content by using Unity. Using the developed content, it demonstrated that new workers can experience the actual work process in advance through simulation in a virtual space, thereby becoming more effective training content that can help new workers become familiar with the work environment.

The thermodynamic efficiency characteristics of combined cogeneration system of 120MW (120MW급 열병합 복합발전시스템의 열역학적 효율 특성)

  • Choi, Myoungjin;Kim, Hongjoo;Kim, Byeongheon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.6
    • /
    • pp.29-36
    • /
    • 2017
  • In this study, acombined cogeneration power plant produced two types of thermal energy and electric or mechanical power in a single process. The performance of each component of the gas turbine-combined cogeneration system was expressed as a function of the fuel consumption of the entire system, and the heat and electricity performance of each component. The entire system consisted of two gas turbines in the upper system, and two heat recovery steam generators (HRSG), a steam turbine, and two district heat exchangers in the lower system. In the gas turbine combined cogeneration system, the performance test after 10,000 hours of operation time, which is subject to an ASME PTC 46 performance test, was carried out by the installation of various experimental facilities. The performance of the overall output and power plant efficiency was also analyzed. Based on the performance test data, the test results were compared to confirm the change in performance. This study performed thermodynamic system analysis of gas turbines, heat recovery steam generators, and steam turbines to obtain the theoretical results. A comparison was made between the theoretical and actual values of the total heat generation value of the entire system and the heat released to the atmosphere, as well as the theoretical and actual efficiencies of the electrical output and thermal output. The test results for the performance characteristics of the gas turbine combined cogeneration power plant were compared with the thermodynamic efficiency characteristics and an error of 0.3% was found.

Technology Development of Entry-Level MiC Smart Photovoltaic System based on SOC (SoC 기반 보급형 MiC 스마트 태양광발전시스템 기술개발)

  • Yoon, Yongho
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.20 no.3
    • /
    • pp.129-134
    • /
    • 2020
  • Moisture infiltration inside the solar cell module, filling of EVA sheet, melting of the frame seal, and deterioration of power generation performance in the module one year after installation are occurring. Whitening phenomenon, electrode corrosion phenomenon, and dielectric breakdown phenomenon are appearing in solar cell module installed in Korea before 5-7 years, leading to deterioration of power generation performance, and big problems for long-term reliability and long life technology are emerging. Therefore, in order to solve these problems, the development of a micro inverter (MiCrco Inverter Converter, MiC) including the function of securing the durability of the solar cell module and monitoring the aging progress and the solar cell based on the monitoring data from the MiC smart monitoring programs have been proposed to determine the aging of modules. In addition, in order to become a highly efficient solar smart monitoring system through systematic operation management through IT convergence with MiC that has enhanced monitoring function of solar cell module, SoC(System On Chip) in micro inverter is the environment for solar cell module. There is a demand for functions that can detect information in a complex manner and perform communication and control when necessary. Based on these requirements, this paper aims to develop SoC-based low-cost MiC smart photovoltaic system technology.

An outlook for Digital Signize (디지털 사이니지의 전망)

  • Park, Su-lim;Kim, Seong-ji;Joo, Yo-sub
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2015.05a
    • /
    • pp.525-529
    • /
    • 2015
  • Depending on the field of smart industry has become increasingly widespread, the digital signage industry as advertising and content industry is emerging. However, this industry is growing rapidly it is not the reason for that is lack of a legal definition or system. The current legal system merely existing laws that apply to the use of outdoor advertising such as advertising and outdoor advertising Electrical, according to a separate law on digital signage is still is not enough. Most of the current legal system between a size that it is put in the control object, its type, the installation location and details and locations of areas in accordance with the regulation member of the law which can reduce the effectiveness of such a business to control them collectively There is concern that the differences are caused by unification can be difficult. In reality, the institutions of the new law was necessary, organized under the existing regulation rather than promoting new laws to screen the effectiveness of the national business media industry through a kind of standardization and unification of the digital signage industry in the future creation of a jurisdiction other than safety administration Science It is important to foster.

  • PDF

Tele-metering

  • Hearte, L.O.
    • 전기의세계
    • /
    • v.2
    • /
    • pp.6-14
    • /
    • 1949
  • Telemetering may be described as the art of metering at a considerable distance those quantities which are ordinarily encountered in industry, and in the generation of electric power. It is in the production of electric power that telemetering is particularly important, for it permits the system operator, or load dispatcher, to have before him at all times a continuous graphic record of the power output of each individual generating station together with an automatically made continuous graphic record of the total system output. There desired individual graphic records may be obtained showing power flow in or out, on important tie lines, etc. Such arrangements have the very great advantage that loads may be assigned to each generating station so that the best over-all system economy may be obtained and the system operator at all times may see with his own eyes that loads scheduled are actually held at the various stations. Moreover, with such equipment, in the event of system or station trouble the load dispatcher can see exactly what station, or stations, are affected and to what extent, without having to get in touch with anyone by telephone. Decisions can, therefore, be quickly reached for rescheduling the load. One of the most accurate and reliable telemetering systems is based on the use of potentiometric circuits, the fundamentals of which are discussed below. A member of such telemetering systems have been installed for the Boston Edicon Co., Boston, Massachusetts, the Consolidated Edison Co. of New York City. The Public Service Gas & Electric Co. of Newark, new Jersey. The Philadelphia Electric Co. for Philadelphia, Pennsylvania, and the Pennsylvania Railroad Co. for their electrified zone between New York and Washington a distance of over 200 miles. The scale of the totalizing recorder for the New York area is 3,000,00 KW. That of the totalizing recorder for the Philadelphia area is 2,000,000 KW. The initial installation using this type of equipment described was placed in service for the Philadelphia Electric Co. in 1923. All of the original recording instruments are still in service, later instruments have been added to take care of additions to the power system and naturally these later recorders have incorporated in those refinements in design made since the earlier ones were manufactured. Many other installations of similar equipment have been made in the United States in various locations such as at St. Louis, on the West Coast, at Baltimore and in Washington, D.C. While the use of these basic potentiometric circuits involves the use of continuous metallic circuits of good insulation resistance and free of grounds, nevertheless, intermediate transmission links, involving and impulse method suitable for use on telephone Morse carrier channels is available. This same method may be employed on power line carrier systems and is also suitable for use on beam type microwave transmission. Many impulse type units are also used as a link in these potantiometric methods. For the sake of brevity a description is given only of these basic potentiometric circuits. If there is sufficient interest in Korea, a further paper can be given covering those impulse circuits also.

  • PDF

The Study of Comparison on Rapping Force on Generation of Corona Discharge Electrode of Electrostatic Precipitator (전기집진장치의 코로나 전류 발생 전극 제작에 따른 추타력 비교에 관한 연구)

  • Lee, Kang-Wuk;Park, Jeong-Ho;Jang, Seong-Ho;Lim, Woo-Taik;Suh, Jeong-Min
    • Journal of Environmental Science International
    • /
    • v.26 no.2
    • /
    • pp.231-238
    • /
    • 2017
  • Rapid industrial development has led to a serious problem of pollution in the industrial sector. With the increasing social need for environmental protection, research on air pollution prevention equipment for reducing pollutants in industrial processes is actively being undertaken. The deterioration of existent, installed facilities, their increased emission rates, and the strengthening of the effluent quality standards make complying with permissible emission standards difficult. In fact, installing new electric precipitators or complementing existent facilities is inevitable. The expansion and complementation of the installed electrical precipitators have led to improvements in dust collection efficiency, shorter working times, and lower costs. Because of its easy installation and simple manufacturing process, the production method with the discharge electrode of an electric precipitator is widely used. The following conclusions were reached by classifying discharge electrodes into four types based on the production method and mutually comparing them by their dust collection efficiency. None of the four types used in this study were damaged by impact. However, we were able to confirm some strain from the compression sites of both type A and type B. Both type B and type C are expected to have greater dust collection efficiencies than the other models due to their large vibration transmissibility. Moreover, the high vibrational energy is expected to cause rapping damage during its operation. Particularly, in the case of type B, some of the strain was found at the end of the compression site. The coupling schemes of both type C and type D are out of vibration transmissibility. On the other hand, the ability to maintain straightness and solidity of the side is regarded as outstanding and stable. Type D has outstanding on-site workability, considering the presence of locking, structural stability, and work conditions. From these experiments, we determined that type C is the most ideal connection method of discharge electrode, considering its construction period of renovation. Type C is inferior to type D with regard to on-site workability. However, type C has outstanding dedusting transmission with regard to the straightness, solidity maintenance, and vibration of shearing stress.

Study on the Estimation of Long Life Cycle and Reliability Tests for Epoxy Insulation Busway System (에폭시 박막 절연형 버스웨이 시스템의 장기 수명 및 신뢰성 평가에 관한 연구)

  • Jang, Dong-Uk;Park, Seong-Hee;Lee, Kang-Won
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.9
    • /
    • pp.261-268
    • /
    • 2018
  • The use of electric cable was limited due to the installation time and large space as the increase of power demand and load quantity in side line. In order to solve these problems, the application of busway system which can supply the large current was increasing. But it was lack of methods of performance tests to evaluate the reliability and results of test for busway system. In this paper, we presented items to evaluate the reliability test for epoxy coated busway system with reference to IEC 61349-6. In addition, we proposed items to evaluate the reliability and long term life cycle test for the epoxy coated busway system. The combined acceleration deterioration test that reflects actual conditions of the survey as much as possible was conducted considering both thermal and electrical stresses. The deterioration condition was selected to satisfy fifty years life expectation and the insulation performance verification test of the busway system confirmed the long term life prediction. Furthermore, as test items for reliability assessment of compliance with the environment for the use of temperature, humidity and load current where busway system was installed, thermal overload test, water immersion test, cold shock temperature test and thermal cycle test were performed. And we examined changes in characteristics and abnormality after tests. From results, the test items presented to evaluate performance and reliability of the epoxy insulated busway system were confirmed to be appropriate in this paper, and the performance of the product was also confirmed to be excellent for reliability tests.

Live Lines Tracing Method in Power Distribution System with 3-phase-4 wires (삼상 다중 접지 배전계통에서 활선로 추적 방법)

  • Zheng, Yan-peng;Byun, Hee-Jung;Shon, Sugoog
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2017.05a
    • /
    • pp.559-562
    • /
    • 2017
  • In city, tracing of power transmission lines is difficult due to compound installation of overhead and underground lines, transposition, bad view caused by trees or big buildings. It is hard problem for electrical technician on site to trace power transformers or power lines to serve customers in 3 phase -4 wires power distribution systems. It is necessary that the correct and fast tracing method is required for load balancing among distribution lines. Old technology use to trace off-lines with high power impulse injection. Our proposed method use to trace live lines with very small power high frequency signal injection. Typical power transformers in the distribution system prevent propagating the higher frequency carrier signal. The proposed method uses the limited propagation ability to identify the power transformer to serve customers. Two end communication terminals are required to be synchronized between them for determination on electrically same phases. Challenging issue is to achieve synchronization without GPS providing synchronizing time. A novel power transformer and wire identification system is designed and implemented. The system consists of a transmitter and a receiver with power-line communication module. Some experiments are conducted to verify the theoretical concepts in a big commercial building. Also some simulations are done to help and understand the concepts by using MATLAB Simulink simulator.

  • PDF