The purpose of this study is to reduce the probability of occurrence of electric fires as a preemptive preventive measure, and to strengthen the capability of preventing electric fires by strengthening the cooperative function between electric fire-related departments and establishing a cooperative system. In this study, the general aspects of electric fires were identified by reviewing the literature such as ignition mechanisms of electric fires. And the major electrical fires that occurred in the last 10 years were classified into ignition factors (short circuit, overload/overcurrent, and earth leakage/ground fault) and ignition sources (wiring/wiring appliances, electrical equipment/household appliances). And the 4M technique was used to analyze the potential causes of ignition at the fire site and to suggest preventive measures. In the case In this study, out of 48 electrical fires in the past 10 years, 16 short-circuit fires, 3 overload/overcurrent fires, 3 short-circuit and earth fault fires, 16 fires in wiring/wiring appliances, and 10 fires in electrical equipment/home appliances classified as cases. And prevention measures were presented in terms of human, machine, media, and management by using the 4M technique. For the preemptive prevention of electric fires, strengthening the compulsory electrical safety inspection and making it mandatory to report when new or expanding electric facilities, charging a fee for electric safety inspection for detached houses and granting benefits subject to inspection completion, improvement of the electric safety voluntary inspection table and safety indications; It was suggested as a policy to organize and operate electrical safety inspection personnel in a two-person team (mixed), establish a close work cooperation system with related organizations, and strengthen electrical safety education and publicity.
Recently, the reactor trip in nuclear power plants has mostly occurred by the failure of secondary electrical facilities. Some kinds of technical standards or acceptable criteria are required to regulate those facilities. Therefore, in this paper the failures of secondary electrical facilities which cause reactor trip are analyzed, and the inspection technologies including guidelines for secondary electrical facilities are developed.
Kim, Jong-Woong;Kim, Kyoung-Min;Moon, Yun-Shik;Park, Gwi-Tae;Lee, Jong-Hak;Jung, Jin-Yang
Proceedings of the KIEE Conference
/
1996.07b
/
pp.1240-1242
/
1996
In a still mill, the effective surface defect inspection algorithm is necessary. For this purpose, this paper proposed the preprocessing algorithm for surface defect inspection of cold mill strip. This consists of live steps. They are edge detection, binarizing, noise deletion, combining of fragmented defect and selecting the largest defect. Especially, binarizing is a critical problem. Bemuse the performance of the preprocessing is largely depend on the binarized image. So, we develope the adaptive thresholding method, which is multilevel thresholding. The thresholding value is varied according to the mean graylevel value of each test image. To investigate the performance of the proposed algorithm, we classified the detected defect using neural network. The test image is 20 defect images captured at German Sick Co. This algorithm is proved to have good property in cold mill strip surface inspection.
Kim, Ji-Ho;Song, Ho-Jun;Lim, Keon-Gyu;Lee, Hyang-beom
Proceedings of the KIEE Conference
/
2005.07b
/
pp.1008-1010
/
2005
In the examination of steam generator(SG) tube in nuclear power plant, eddy current testing probes play an important role in detecting the defects. Bobbin probe and MRPC probe is usually used for the inspection of SG tube. Bobbin probe is good at high speed inspection, but ability of detection of circumferential defect is very weak. On the contrary MRPC probe, which moves for inspection in the direction of axial and circumferential simultaneously, has very slow inspection speed, but it has excellent detection capability for small cracks, which is hardly detected by bobbin probe. In this paper, for the accurate analysis of experimental ECT signals, construction of MRPC probe signals database according to the variation of defect size is the main purpose. Using 3-D finite element method, ECT signals are analyzed, and signals analysis add according to frequency ingredient. The results, which are analysis and characteristics ion of electromagnetism simulation signals, is databased.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.21
no.10
/
pp.101-107
/
2007
In order to introduce remote monitoring system for effective safety management of electrical facilities for general use, which the most of electrical fires and non-inspection problems due to absence are generated development of local device model considering cost and installation is requested. This paper presents local device models for remote electrical safety inspection of electrical facilities for general use and in order to rational model according to installation place of electrical facilities for general use, compare and analysis cost, installation and communication method of local device models. The results show that rational model for remote safety inspection of electrical facilities located in houses, which occupy the must of electrical facilities for general use, is to give safety monitoring ability to low voltage remote meter reading(or automatic meter reading: AMR).
Park, Joon-Young;Lee, Jae-Kyung;Cho, Byung-Hak;Oh, Ki-Yong
The Transactions of the Korean Institute of Electrical Engineers P
/
v.59
no.1
/
pp.89-95
/
2010
A new live-line insulator tester was developed to detect faulty insulators in 154kV power transmission lines. This paper is the second part of the two-part paper and deals with its inspection algorithm development. Unlike normal condition with low pollution and low humidity, the inspection data measured in the field under high pollution or high humidity showed that the voltage distribution of an insulator string has offsets in comparison with those of others and its insulation resistances are greatly decreased, which leads to wrong results of the existing inspection algorithms under such conditions. To solve this problem, we propose new diagnosis algorithms that can exactly detect faulty insulators from measured data regardless of environmental conditions. Its effectiveness was validated by live-line field tests in actual power lines.
The Transactions of the Korean Institute of Electrical Engineers D
/
v.49
no.3
/
pp.95-101
/
2000
In this paper, an improved method for magnetic inspection to detect surface of a conductor is presented. The presented method is based on the technique of ECP(Electric Current Perturbation), which is to measure the variation of current flow due to defects with a magnetic sensor. The inspection performance is improved by using high frequency current behaviors in order to concentrate the current near the defect and employing the resonant frequency of a search coil as an operating frequency. By analytical results and experiments of the test specimens, the feasibility of the inspection method is shown.
The Transactions of The Korean Institute of Electrical Engineers
/
v.67
no.1
/
pp.142-147
/
2018
Private electrical facilities are judged whether it is suitable for the insulation aging condition of their incoming underground cables using DC leakage current test method. In the case where the service point of utility is the secondary side of cut out switch installed in the electric pole, there is a problem that it is difficult to separate the lightning arresters(LA) because of their high position of the pole. Therefore, the field test voltage is applied at value lower than DC 30 kV, which are stated in the inspection guideline. However, this test could reduced the insulation performance of the LA by accelerating the electrical stress of the metal oxide varistor element in the pre-breakdown region. In this study, we analyzed the relationship between the DC test voltage and the leakage current using the non-destructive DC high voltage equipment with leakage current measurement function. The results show that the leakage current increases sharply above the specified test voltage. As a consequence, it could be contributed to improve insulation aging inspection method by selecting the possible test area on the VI characteristic curve of the pre-breakdown area of the LA.
The appearance inspection of various electronic products and parts has been executed by the eyesight of human. But inspection by eyesight can't bring about uniform inspection result. Because the appearance inspection result by eyesight of human is changed by condition of physical and spirit of the checker. So machine vision inspection system is currently used to many appearance inspection fields instead of the checker. However the inspection result of machine vision is changed by the illumination of workplace. Therefore we have used a power-law transformation in this paper. for improvement of vision inspection accuracy and could increase inspection accuracy of vision system. Also this system has been developed only using PC, CCD Camera and Visual C++ for universal workplace.
Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
/
2004.05a
/
pp.479-485
/
2004
The purpose of this study is to develop a practical image inspection system that could recognize it correctly, endowing flexibility to the productive field, although the same object for work will be changed in the size and rotated. In this experiment, it selected a fighter, rotating the direction from $30^{\circ}\;to\;45^{\circ}$ simultaneously while changing the size from 1/4 to 1/16, as an object inspection without using another hardware for exclusive image processing. The invariant moments, Hu has suggested, was used as feature vector moment descriptor. As a result of the experiment the image inspection system developed from this research was operated in real-time regardless of the chance of size and rotation for the object inspection, and it maintained the correspondent rates steadily above from 94% to 96%. Accordingly, it is considered as the flexibility can be considerably endowed to the factory automation when the image inspection system developed from this research is applied to the productive field.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.