• Title/Summary/Keyword: Electric power facilities

Search Result 515, Processing Time 0.032 seconds

The Study on the Actual Condition about Facility Accident Case and PL Recognition of the Safety Manager in Electric Installation for Private Use (수용가 전기설비 관리자의 PL인식 및 설비사고사례에 관한 실태연구)

  • Kim, Young-Seok;Shong, Kil-Mok;Jung, Jong-Wook;Jung, Jin-Su;Kim, Sun-Gu;Lee, Jun
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2008.05a
    • /
    • pp.309-312
    • /
    • 2008
  • In this paper, we investigated electric safety manager's PL recognition and accident occurrence of electric power facilities(power cable, transformer, circuit breaker) in electric installation for private use. The target of questionnaire survey is 450 electric installations for private use, 154 responded the questionnaire among these and it occupied 35.8%. Most of receiving voltage were 22.900kV. The questionnaire survey says that 58% of electric safety manager knew well about PL contents and 42% of them did not recognize about PL contents, About the PL application of electrical facility accidents, 82.4% of them must applied PL law, 5.8% of them did not need the PL law. Reason of PL application occupied 64% for stability of electrical facility and product, 19% for prevention of same accident. The accident of transformer occupied most and the power cable accident were much next. The questionnaire survey results, electric safety managers are interested in PL content. thev expected necessity of PL application about electrical accident strongly.

  • PDF

A Study on the Certification Criteria fot Personal Watercraft Using Electric Power Propulsion (전기 동력 추진식 수상오토바이 인증기준 개발 연구)

  • Kang, Dae-Kon;Kim, Shin-Hyo
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.23 no.1
    • /
    • pp.67-72
    • /
    • 2017
  • This study developed an electric power propulsion personal watercraft by combining a battery and an electric system from the domestic automobile industry with water motorcycle from marine leisure industry in a convergence of technology. It also developed a safety inspection plan and type approval standard for personal watercraft that use electric power propulsion. For the registration and production of the electric power PWC (Personal Watercraft), a safety inspection standard (draft) and type approval standard (draft) have been established. PWC that use this electric power propulsion certification standard have been divided into two categories according to the use of gasoline engines as related to the ship's electrical system. The contents of these safety inspections standards is divided into 7 categories, and their purpose is to confirm the facilities used for the safe operation of PWC. Type approval is divided into 7 categories and is intended to ensure the safe production of PWC. This is basic data can be used to establish criteria for safety inspection and type approval of electric power propulsion vessels and to guide the production of the environmentally friendly PWC in Korea.

A Proposed High Voltage Distribution System of the Customer Inside for Reducing Power Loss (수용가내부 고압배전시스템의 전력손실감소효과)

  • Park, Hyung-Joon;Yun, Man-Soo;Chung, Chan-Soo
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.19 no.5
    • /
    • pp.39-44
    • /
    • 2005
  • This paper is about the new distribution system of the electric customer inside. The power loss in the distribution system of the customer is disregarded and rarely managed so for. But, economically, this loss is not small quantity to ignore. So, in this paper, we suggest that the new distribution system of the electric customer inside by simply changing the locations of power transformer and other power facilities which is located inside of the customer. And we also show that the power loss is decreased with this systematic changing by approximated calculation.

A Study on the Characteristics of Electric Power Consumption of University (종합대학의 전력에너지 부하 특성에 관한 연구)

  • Lee, Choun-Mi;Kim, Ju-Young;Hong, Won-Hwa
    • 한국태양에너지학회:학술대회논문집
    • /
    • 2008.04a
    • /
    • pp.336-341
    • /
    • 2008
  • For the last half a century, Korea has been experienced rapid economic growth and industrialization development, however they cause serious problems that environment pollution and energy shortage are appeared, and the biggest problem that we are now confronted are required solutions through all over the world. Now, Korea's energy consumption is the 10th in the whole world. Among them, energy for buildings, about 25% in the whole Energy which spend in Korea, is very serious. Especially, the energy consumption of school buildings which have heating & cooling system according to improvements of educational environment are rapidly increasing. These features are explicit in the University, Because it has lots of colleges and facilities for lecture, experiment, and research. Especially, electric power consumption account for 75 percent of energy consumption in educational institutions. Accordingly, it is important to understand and analyze the pattern of electricity energy consumption which is used. This study attempts to appoint the place which is one of university and to investigate the characteristics of energy consumption like electricity, gas, oil.

  • PDF

The need for the development of conversion program of distribution facilities on the New Distribution Information System to GRS80 Datum (NDIS 배전설비 세계측지계 전환 프로그램 개발의 필요성)

  • Park, Young-Sung;Yi, Sue-Muk;Lee, Suk-Beom
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.402-403
    • /
    • 2008
  • 한전의 신배전정보시스템(NDIS)은 지리정보시스템(GIS)을 활용하여 전국에 시설되어 있는 방대한 배전설비를 데이터베이스로 구축한 후 배전계획, 배전설계, 공사관리, 준공정산, 자산취득, 유지보수 등 배전분야 전반의 업무를 수행하고 고객정보시스템과 연계하여 영업업무를 지원하는 시스템으로 저압공급방안검토, 고압계통분석, 보호협조검토, Simulation 등 배전분야에서 필요한 다양한 기술지원 기능과 경제적인 투자계획, 효율적인 유지보수 등을 위한 배전통계 및 자원정보 등 장기적 관점의 경영정보 인프라를 구축하여 배전설계에서 준공까지 업무흐름 표준화, 업무처리 절차, 방법 등을 시스템에서 자동 지원토록하여 반복적인 배전정보 관리업무의 정확도 향상을 목적으로 만들어진 시스템이다. 신배전 정보시스템의 배전설비는 모두 위치값을 가지고 있는데 지중배전설비는 위치에 대한 측량 및 탐사를 시행하여 신배전정보시스템에 DB입력하여 사용하고 있으며 이 입력 좌표체계는 한정된 일부지역에서만 사용할 수 있는 동경측지계를 사용하고 있다. 2010년 부터는 이동 경측지계를 전 세계적으로 GPS측량값을 그대로 적용할 수 있는 세계 측지계로 사용토록 측량법에 명시되어 있어 신배전정보시스템의 배전설비를 전환 프로그램을 개발하여 전환하고자 한다.

  • PDF

A Study on Seismic Liquefaction Risk Map of Electric Power Utility Tunnel in South-East Korea (국내 동남권 지역의 전력구 지반에 대한 지진시 액상화 위험도 작성 연구)

  • Choi, Jae-soon;Park, Inn-Joon;Hwang, Kyengmin;Jang, Jungbum
    • Journal of the Korean GEO-environmental Society
    • /
    • v.19 no.10
    • /
    • pp.13-19
    • /
    • 2018
  • Following the 2016 Gyeongju earthquake, the Pohang Earthquake occurred in 2017, and the south-east region in Korea is under the threat of an earthquake. Especially, in the Pohang Earthquake, the liquefaction phenomenon occurred in the sedimentation area of the coast, and preparation of countermeasures is very important. The soil liquefaction can affect the underground facilities directly as well as various structures on the ground. Therefore, it is necessary to identify the liquefaction risk of facilities and the structures against the possible earthquakes and to prepare countermeasures to minimize them. In this study, we investigated the seismic liquefaction risk about the electric power utility tunnels in the southeast area where the earthquake occurred in Korea recently. In the analysis of seismic liquefaction risk, the earthquake with return period 1000 years and liquefaction potential index are used. The liquefaction risk analysis was conducted in two stages. In the first stage, the liquefaction risk was analyzed by calculating the liquefaction potential index using the ground survey data of the location of electric power utility tunnels in the southeast region. At that time, the seismic amplification in soil layer was considered by soil amplification factor according to the soil classification. In the second stage, the liquefaction risk analysis based on the site response analyses inputted 3 earthquake records were performed for the locations determined to be dangerous from the first step analysis, and the final liquefaction potential index was recalculated. In the analysis, the site investigation data were used from the National Geotechnical Information DB Center. Finally, it can be found that the proposed two stage assessments for liquefaction risk that the macro assessment of liquefaction risk for the underground facilities including the electric power utility tunnel in Korea is carried out at the first stage, and the second risk assessment is performed again with site response analysis for the dangerous regions of the first stage assessment is reasonable and effective.

Home Network Control Protocol for Networked Home Appliances and Its Application

  • Lee Jae-Min;Myoung Kwan-Joo;Kim Dong-Sung;Kwon Wook-Hyun;Ko Beom-Seog;Kim Young-Man;Kim Yo-Hee
    • Journal of The Institute of Information and Telecommunication Facilities Engineering
    • /
    • v.1 no.1
    • /
    • pp.26-39
    • /
    • 2002
  • This paper describes design and implementation of home network control protocol for networked home appliances. The proposed network protocol has four-layered protocol structure and device-modem interface structure for the flexibility of modems based on power line communication. The standard message set is specified to guarantee the interoperability between various home appliances The proposed protocol can be easily implemented because it has minimum network overhead.

  • PDF

Frequency Spectrum Analysis of Corona Discharge as Electrode Structures (전극 구조에 따른 코로나 방전의 주파수 스펙트럼 분석)

  • Jung, Kwang-Seok;Kim, Sun-Jae;Park, Dae-Won;Kil, Gyung-Suk
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2010.06a
    • /
    • pp.118-118
    • /
    • 2010
  • In this paper, we analyzed the frequency spectrum of radiated electromagnetic waves which is generated by corona discharges as a basic study to develop a on-line diagnostic technique for power facilities installed in a closed-switchboard. Five types of electrode system were arranged to simulate corona discharge. The experiment was carried out in an electromagnetic shielding room, and the measurement system consists of an Ultra Log Antenna and an EMI Test Receiver. These results showed that the frequency spectrum of corona discharges exists widely in ranges from 30 to 1,000 [MHz].

  • PDF

DEVELOPMENT OF ELECTRICAL TESTING FACISITY ABOUT U.H.V. CABLE AND ACCESSORY (극 초고압 케이블 및 접속함 전기 시험 단말의 개발)

  • Kim, J.H.;Oh, E.J.;Kim, H.J.
    • Proceedings of the KIEE Conference
    • /
    • 2000.07c
    • /
    • pp.2014-2016
    • /
    • 2000
  • In order to meet recent increasing demand for electric power in large cities, plans are being made to introduce 345kV lines into large urban areas. Up to now, OF cables have been used for 345kV fines, but nowadays XLPE insulated cables are preferred as they are easier to maintain due to phenomenal advances in plastic insulation technology, therefore cable manufacturing companies are trying to improve the performance and reliability of UHV CV cables and their accessories. For the purpose, our company has developed facilities for testing UHV cables. In this paper, we describes the methodology adopted for the design and development of a test termination, conducted the electrical test of UHV cables. Based on detailed analytical studies for electrical field distribution, the internal electrical design for the testing end has been carried out.

  • PDF

Protection Strategies Against False Data Injection Attacks with Uncertain Information on Electric Power Grids

  • Bae, Junhyung;Lee, Seonghun;Kim, Young-Woo;Kim, Jong-Hae
    • Journal of Electrical Engineering and Technology
    • /
    • v.12 no.1
    • /
    • pp.19-28
    • /
    • 2017
  • False data injection attacks have recently been introduced as one of important issues related to cyber-attacks on electric power grids. These attacks aim to compromise the readings of multiple power meters in order to mislead the operation and control centers. Recent studies have shown that if a malicious attacker has complete knowledge of the power grid topology and branch admittances, s/he can adjust the false data injection attack such that the attack remains undetected and successfully passes the bad data detection tests that are used in power system state estimation. In this paper, we investigate that a practical false data injection attack is essentially a cyber-attack with uncertain information due to the attackers lack of knowledge with respect to the power grid parameters because the attacker has limited physical access to electric facilities and limited resources to compromise meters. We mathematically formulated a method of identifying the most vulnerable locations to false data injection attack. Furthermore, we suggest minimum topology changes or phasor measurement units (PMUs) installation in the given power grids for mitigating such attacks and indicate a new security metrics that can compare different power grid topologies. The proposed metrics for performance is verified in standard IEEE 30-bus system. We show that the robustness of grids can be improved dramatically with minimum topology changes and low cost.