• Title/Summary/Keyword: Effluent concentration

Search Result 796, Processing Time 0.026 seconds

The Characteristics of SBR Treatment with Different Types of Piggery Wastewater (축산폐수성상에 따른 SBR 처리특성)

  • Jun, Byong-Hee;Poo, Kyung-Min;Kim, Yang-Hoon;Im, Jeong-Hoon;Kim, Chang-Won
    • Journal of Korean Society on Water Environment
    • /
    • v.18 no.4
    • /
    • pp.435-440
    • /
    • 2002
  • A pilot scale SBR (effective volume, $20m^3$) for the treatment of piggery wastewater treatment was performed with three different kinds of wastewater; fermenter effluent, scraper type and slurry type. The react phase in SBR was performed by sub-cycle operation consisting of repeated short cycle of anoxic-aerobic step. The fermenter effluent was characterized by the rapid nitrification and $NO_X-N$ accumulation due to depletion of organic matter in wastewater. The scraper type wastewater showed appropriate nitrogen removal efficiency, however, a poor response capacity for high loading rate often resulted in increased nitrogen concentration in effluent. Moreover, severe P release was the most serious problem in scraper type wastewater. SBR treated slurry type wastewater with high nitrogen removal efficiency to satisfy effluent quality requirement. It was thought that high concentration of organic matter in slurry made it possible to uptake P during SBR operation, where P concentration of 140mgP/l was decreased to 8mgP/l. As results, SBR was suitable to treat slurry type wastewater which has been discharged to the ocean till now.

Control of $NH_4-N$ in Wastewater Treatment Effluent According to Simplified ASM No. 1 (간략화된 활성슬러지 모델(ASM No. 1)을 이용한 유출수 중 암모니아성 질소의 제어에 관한 연구)

  • Kim, Shin-Geol;Choi, In-Su;Koo, Ja-Yong
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.29 no.5
    • /
    • pp.548-555
    • /
    • 2007
  • The control of wastewater treatment has two merits; one is to regulate water quality of effluent and the other is to reduce the cost of wastewater treatment. The purpose of this study was to control the ammonium nitrogen in effluent that is known to cause eutrophication. The control was based on simplified ASM No. 1 which had 3 component materials and 8 coefficients, and the control method was as following. Firstly the ammonium concentration of inflow was measured and the optimal aeration time in effluent was determined according to simplified ASM No. 1 to be 1.0 mg/L. If ammonium concentration of effluent was not equal to 1.0 mg/L, the influent ammonium was corrected by adaptive control. These processes above were repeatedly performed. The SBR running aerobic-anoxic phase had been controlled for 1 month with this method. As a result, the ammonium concentration of the effluent showed in the range of $0.22\sim3.1$ mg/L with an average concentration of 1.1 mg/L. The adaptive control method used in this study was found very useful to control and predict the effluent concentration of ammonium.

Recovery of High-Purity Methane from Piggery Wastewater in the Phase-Separated Anaerobic Process (상분리 혐기성공정에 의한 양돈폐수로부터 고순도 메탄회수)

  • Jung, Jin-Young;Chung, Yun-Chul;Yoo, Chang-Bong
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2008.05a
    • /
    • pp.210-213
    • /
    • 2008
  • The purpose of this study is to investigate the performances of organic removal and methane recovery in the full scale two-phase anaerobic system. The full scale two-phase anaerobic system was consists of an acidogenic ABR (Anaerobic Baffled Reactor) and a methanognic UASB (Upflow Anaerobic Sludge Blanket) reactor. The volume of acidogenic and methanogenic reactors is designed to 28.3 $m^3$ and 75.3 $m^3$. The two-phase anaerobic system represented 60-82% of COD removal efficiency when the influent COD concentration was in the range of 7,150 to 16,270 mg/L after screening (average concentration is 10,280 mg/L). After steady-state, the effluent COD concentration in the methanogenic reactor showed 2,740 $\pm$ 330 mg/L by representing average COD removal efficiency was 71.4 $\pm$ 8.1% when the operating temperature was in the range of 19-32$^{\circ}C$. The effluent SCOD concentration was in the range of 2,000-3,000 mg/L at the steady state while the volatile fatty concentration was not detected in the effluent. Meanwhile, the COD removal efficiency in the acidogenic reactor showed less than 5%. The acidogenic reactor played key roles to reduce a shock-loading when periodic shock loading was applied and to acidify influent organics. Due to the high concentration of alkalinity and high pH in the effluent of the methanogenic reactor, over 80% of methane in the biogas was produced consistently. More than 70 % of methane was recovered from theoretical methane production of TCOD removed in this research. The produced gas can be directly used as a heat source to increase the reactor temperature.

  • PDF

Methane Recovery and Performances of Full-scale Two-stage Anaerobic Process Treating Piggery Wastewater (양돈폐수처리시 실규모 이단 혐기성공정의 성능 및 메탄회수)

  • Jung, Jin-young;Chung, Yun-chul;Kang, Shin-hyun;Chung, Hyung-sook
    • Journal of Korean Society on Water Environment
    • /
    • v.21 no.3
    • /
    • pp.256-262
    • /
    • 2005
  • The purpose of this study is to investigate the performances of organic removal and methane recovery by using a full scale two-phase anaerobic system. The full scale two-phase anaerobic process was consists of an acidogenic anaerobic baffled reactor (ABR) and a methanognic upflow anaerobic sludge blanket (UASB) reactor. The volumes of acidogenic and methanogenic reactors were designed to $28.3m^3$ and $75.3m^3$. The two-phase anaerobic system represented 60-82% of COD removal efficiency when the influent COD concentration was in the range of 7,150 to 16,270 mg/L after screening (average concentration is 10,280 mg/L). After steady-state, the effluent COD concentration in the methanogenic reactor showed $2,740{\pm}330 mg/L$ by representing average COD removal efficiency was $71.4{\pm}8.1%$ when the operating temperature was in the range of $19-32^{\circ}C$. The effluent SCOD concentration was in the range of 2,000-3,000 mg/L at the steady state while the volatile fatty acid concentration was not detected in the effluent. Meanwhile, the COD removal efficiency in the acidogenic reactor showed less than 5%. The acidogenic reactor played key roles to reduce a shock-loading when periodic shock loading was applied and to acidify influent organics. Due to the high concentration of alkalinity and high pH in the effluent of the methanogenic reactor, over 80% of methane in the biogas was produced consistently. More than 70% of methane was recovered from theoretical methane production of TCOD removed in this research. The produced gas can be directly used as a heat source to increase the reactor temperature.

The Basic Design Parameters and Effluent Characteristics for Aerobic Fixed Biofilm Reactor (호기성 고정생물막 반응기에서 기초 설계인자와 유출수의 성상)

  • 박태주;송승구
    • KSBB Journal
    • /
    • v.7 no.3
    • /
    • pp.235-245
    • /
    • 1992
  • A number of experiments to treat wastewater of a dye plant were conducted to investigate the basic design parameters and effluent characteristics for aerobic fixed biofilm reactor upon the variation of organic loading rate. The media used for this study were SARAN 4000 D with specific surface area $153m^2/m^3$, and 1000 D with specific surface area $307m^2/m^3$. The influent COD concentration ranged from 1250 to 4080 mg/L. Substrate removal and variation of biomass concentration were observed. At the beginning, the effluent quality was poor but improved as the time passed. However the effluent quality became seriously deteriorated when the media clogged. At influent COD of 1250mg/L, the effluent COD varied little, even if the organic loading rate increased from 0.63 to 2.5kg COD/$m^3$/day. It was also noted that the design parameters for activated sludge process could be applied to an aerobic fixed biofilm process under the experimental conditions.

  • PDF

A Study on Low Concentration Substrate Removal by Using the Aerated Submerged Biofilter (호기 생물막법에 의한 저농도 기질제거법에 관한 고찰)

  • 홍성철;정문식
    • Journal of Environmental Health Sciences
    • /
    • v.15 no.2
    • /
    • pp.59-68
    • /
    • 1989
  • This study was performed employing the two stage aerated submerged biofilter of media pore size 1.5cm and 2cm, and infiuent substrate concentrations were 30.25mg COD/l, 50.1mg COD/l respectively. The purpose was to determine the treatment efficiency at the low concentration infiuent, reaction order and substrate flux with application of variable-order model that was presented by Rittmann and McCarty. . The results are as follows. 1. Treatment efficiency of 1st reactor was about BOD 82% and COD 76%, when effluent concentration was BOD 3.9 ~ 6.8, COD 7.1 ~ 12.5 mg/l, and this effluent concentration didn't satisfy the water quality grade I, II of river and lake. But as treated effluent of 1st reactor with 2nd reactor, we could achieve appropriate water quality, since instillation of 2nd reactor was needed. 2. Difference of media pore size between 1.5cm and 2cm didn't effect significantly to treatment efficiency and since this of 2nd reactor was about BOD 60%, COD 50%, an consideration of economic point of view should be carried out in field application. 3. Reaction order and substrate flux was varied 0.9851~0.9956 and 0.0028~0.0405 mg/$cm^{2} \cdot day$, and the substrate flux was increased as infiuent substrate concentration increased.

  • PDF

Influence factors and Efficiencies Characteristics for Treatment of Wastewater Containing Phenol (Phenol 함유폐수의 처리를 위한 영향인자와 성능특성)

  • Kang, Sun-Tae;Kim, Jeong-Mog
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.10 no.4
    • /
    • pp.119-126
    • /
    • 1996
  • Influence factors and efficiency characteristics for treatment of wastewater containing phenol were studied with using Pseudomonas sp. B3. It took 130 hours to remove phenol, when only activated sludge of terminal disposal palnt of sewage was innoculated in batch culture, but it was required just 36 hours, when bacteria degrading phenol and activated sludge were simultaneously innoculated. If only phenol an carbon source was used, it necessary 36 hours for biodegradation of phenol, while glucose was added to medium, it took 73 hours. It was revealed as excellent effluent and SVI, when the F/M ratio, COD and phenol concentration were 53mg/l and 1.2mg/l, respectively, and optimum F/M ratio was revealed 0.31. The reactor were seriously shocked as reducing hydraulic retention time at constant phenol concentration more than increasing phenol concentration at constant hydraulic retention time, when volumetric loading rate was increased to $0.8kg\;phenol/m^3{\codt}d$ from $1.6kg\;phenol/m^3{\codt}d$. And also the effluent phenol concentration was 34mg/l after starting 12 hours of shocking and reactor was recovered as steady state after 65 hours of changing in the former test. Although the effluent phenol concentration was maximum value with 12mg/l after starting 20 hours of shocking and reactor was recovered as steady state after 54 hours of changing in the later test.

  • PDF

Application of Toxicity Identification Evaluation Procedures for Toxic Effluents from the Aluminum Rolling Industry (알루미늄 가공 공장 배출 방류수의 독성 원인물질 탐색)

  • Ra, Jin-Sung;Lee, Jiho;Kim, Ki-Tae
    • Journal of Environmental Health Sciences
    • /
    • v.41 no.5
    • /
    • pp.305-313
    • /
    • 2015
  • Objectives: The objective of this study is to identify toxicants causing acute toxicity in effluents from the aluminum rolling industry that violate the discharge limits in Korea. Methods: Whole effluent toxicity tests (WET) were conducted on effluent discharged from the aluminum rolling industry following the US EPA WET test methods. We collected effluent samples three times and evaluated acute toxicity by using Daphnia magna. We employed toxicity identification evaluation (TIE) procedures to identify toxicants causing toxicity in the effluent. Results: No specific chemical groups were identified in the seven different manipulations applied to the of wastewater effluent samples showing 1.3 toxic units (TU) according to the TIE phase I procedures. Water quality parameters for water hardness, electric conductivity and heavy metals (Mn) were 4,322 mg/l as $CaCO_3$, 11.39 mS/cm, and $5,551{\mu}g/l$, respectively. Considering water hardness and reference toxicity, high concentrations of Mn can be disqualified from the causative toxicants. Consequently, high ionic concentrations of $Na^+$(1,648 mg/l), $Ca^{2+}$(1,048 mg/l), $Mg^{2+}$(1,428 mg/l) and $SO_4{^{2-}}$(7,472 mg/l) were identified to be causative toxicants. Water hardness and electric conductivity exceed the $EC_{50}$ value obtained by biological toxicity tests using Daphnia magna. Conclusion: According to TIE procedures, high salt concentration is determined to be a major toxicant in the effluent of agro-industrial wastewater treatment plants receiving wastewater from the aluminum rolling industry.

Fuzzy Control and Optimization for the Wastewater Treatment Process (퍼지제어기를 이용한 하폐수처리공정의 최적화)

  • 천성표;김봉철;김성신
    • Proceedings of the Korean Institute of Intelligent Systems Conference
    • /
    • 2000.11a
    • /
    • pp.452-455
    • /
    • 2000
  • There are increasingly important financial incentives and environmental consideration to improve the effluent quality of wastewater from domestic and industrial users. The activated sludge process is a widely used biological wastewater treatment process. The activated sludge process is complicated due to the many factors such as the variation of influent flowrate and concentration, the complexity of biological reactions and the various operation conditions. Nowadays, not only suspended solids and residual carbon, but also nitrogen and phosphorous concentration of the effluent water must be taken into account for the design and operation of wastewater treatment plants. Also, the effluent quality to be met are more stringent. Therefore, an intelligent control approach is required in order to successful biological nitrogen removal. In this paper, the strategies for dosage of extra carbon in the anoxic zone and DO concentration in the aerobic zone are presented and evaluated through the simulation using the denitrification layout of the IWA simulation benchmark implemented by Matlab$\^$/5.3/Simulink$\^$/3.0. The control strategy to achieve sufficient denitrification rates in an anoxic zone. Methanol is used as an external extra carbon source. The external extra carbon source is required for the nitrogen removal process because nitrogen and organic concentration are fluctuated in the influent flowrate. The dissolved oxygen is calculated by So concentration in the activated sludge model NO.1. The air flowrate of each aerobic reactor is intelligently controlled to achieve the predefined setpoints. Air flowrate is adjusted by the fuzzy logic controller that includes two inputs and one output. The objective function for the optimization procedure is designed to improve effluent quality and reduce the operating cost.

  • PDF

Development and Evaluation of Model-based Predictive Control Algorithm for Effluent $NH_4-N$ in $A^2/O$ Process ($A^2/O$ 공정의 유출수 $NH_4-N$에 대한 모델기반 예측 제어 알고리즘 개발 및 평가)

  • Woo, Dae-Joon;Kim, Hyo-Soo;Kim, Ye-Jin;Cha, Jae-Hwan;Choi, Soo-Jung;Kim, Min-Soo;Kim, Chang-Won
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.33 no.1
    • /
    • pp.25-31
    • /
    • 2011
  • In this study, model-based $NH_4-N$ predictive control algorithm by using influent pattern was developed and evaluated for effective control application in $A^2/O$ process. A pilot-scale $A^2/O$process at S wastewater treatment plant in B city was selected. The behaviors of organic, nitrogen and phosphorous in the biological reactors were described by using the modified ASM3+Bio-P model. A one-dimensional double exponential function model was selected for modeling of the secondary settlers. The effluent $NH_4-N$ concentration on the next day was predicted according to model-based simulation by using influent pattern. After the objective effluent quality and simulation result were compared, the optimal operational condition which able to meet the objective effluent quality was deduced through repetitive simulation. Next the effluent $NH_4-N$ control schedule was generated by using the optimal operational condition and this control schedule on the next day was applied in pilot-scale $A^2/O$ process. DO concentration in aerobic reactor in predictive control algorithm was selected as the manipulated variable. Without control case and with control case were compared to confirm the control applicability and the study of the applied $NH_4-N$control schedule in summer and winter was performed to confirm the seasonal effect. In this result, the effluent $NH_4-N$concentration without control case was exceeded the objective effluent quality. However the effluent $NH_4-N$ concentration with control case was not exceeded the objective effluent quality both summer and winter season. As compared in case of without predictive control algorithm, in case of application of predictive control algorithm, the RPM of air blower was increased about 9.1%, however the effluent $NH_4-N$ concentration was decreased about 45.2%. Therefore it was concluded that the developed predictive control algorithm to the effluent $NH_4-N$ in this study was properly applied in a full-scale wastewater treatment process and was more efficient in aspect to stable effluent.