ENERGY EFFICIENT BUILDING DESIGN THROUGH DATA MINING APPROACH

  • Hyunjoo Kim;Wooyoung Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.601-605
    • /
    • 2009
  • The objective of this research is to develop a knowledge discovery framework which can help project teams discover useful patterns to improve energy efficient building design. This paper utilizes the technology of data mining to automatically extract concepts, interrelationships and patterns of interest from a large dataset. By applying data mining technology to the analysis of energy efficient building designs one can identify valid, useful, and previously unknown patterns of energy simulation modeling.

  • PDF

Optimal Project Duration Estimation Through Enhanced Resource Leveling Technique (개선된 자원 평준화 기법을 활용한 적정 공기산정에 관한 연구)

  • Yoon Yung-Sang;Kim Kyung-Hwan;Kim Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.575-578
    • /
    • 2004
  • Since a construction project is a series of works that utilizes resources to accomplish the project goal for a given time period, efficient resource management is a prerequisite for the success of the project. Two major areas of resource management are resource constrained scheduling focusing on the limited resource availability and resource leveling focusing on smoothing resource usage pattern on the fixed project completion time. It is not available, however, to apply both techniques to a project at the same time. This paper proposes a model to enhance the minimum moment algorithm of resource leveling, aiming to find an efficient usage of resources and an appropriate project completion time. A survey is performed to evaluate the major five factors using the AHP.

  • PDF

A Study of R&D Investment Framework and Success Factors

  • Park, Young-H.
    • International Journal of Quality Innovation
    • /
    • v.9 no.1
    • /
    • pp.103-112
    • /
    • 2008
  • This paper presents a framework for implementing R&D project. Fundamental R&D investment process framework and success factors while considering risks and uncertainties of project will be described to illustrate an efficient and effective R&D management system in a firm.

The Establishing of the Self-regulation System for Quality and Safety Management (현장(現場) 자율(自律) 품질안전관리(品質安全管理) 시스템 구축(構築))

  • Baik, In-Whee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2007.04a
    • /
    • pp.81-87
    • /
    • 2007
  • PMIS (Project Management Information System) has been applied in the R4-PROJECT This construction project has been controlled and managed by PMIS for the whole process of project. Moreover, this PMIS is updated to the Self-regulation System for Quality and Safety Management which is integrated and developed from PMIS in R4-PROJECT. So, The Self-regulation System for Quality and Safety Management has been delivering effective communication and information distribution with various stakeholders related to project and also brought the achievement of efficient construction management. As the system is successfully utilize, the satisfaction of costumer request and the performance of no accident for 550 million hours could be attained.

  • PDF

Metrics for Measuring Innovation in Integrated Project Delivery

  • Lee, Tai-Sik;Swain, Saumya Ranjan;Park, Kyoung-Soon;Kim, Young-Hyun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.322-325
    • /
    • 2006
  • The research project evaluates different infrastructure project delivery methods used internationally. The goal is to define the main benefits, deficiencies, and requirements of the project delivery systems for both the short term and long term perspectives. Also, the research attempts to determine alternatives to modify and to promote change in the current infrastructure project delivery methods in order to make the processes more efficient with value added benefits to all participants.

  • PDF

Web-based Three-step Project Management Model and Its Software Development

  • Hwang Heung-Suk;Cho Gyu-Sung
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2006.05a
    • /
    • pp.373-378
    • /
    • 2006
  • Recently the technical advances and complexities have generated much of the difficulties in managing the project resources, for both scheduling and costing to accomplish the project in the most efficient manner. The project manager is frequently required to render judgments concerning the schedule and resource adjustments. This research develops an analytical model for a schedule-cost and risk analysis based on visual PERT/CPM. We used a three-step approach: 1) in the first step, a deterministic PERT/CPM model for the critical path and estimating the project time schedule and related resource planning and we developed a heuristic model for crash and stretch out analysis based upon a time-cost trade-off associated with the crash and stretch out of the project. 2) In second step, we developed web-based risk evaluation model for project analysis. Major technologies used for this step are AHP (analytic hierarchy process, fuzzy-AHP, multi-attribute analysis, stochastic network simulation, and web based decision support system. Also we have developed computer programs and have shown the results of sample runs for an R&D project risk analysis. 3) We developed an optimization model for project resource allocation. We used AHP weighted values and optimization methods. Computer implementation for this model is provided based on GUI-Type objective-oriented programming for the users and provided displays of all the inputs and outputs in the form of GUI-Type. The results of this research will provide the project managers with efficient management tools.

  • PDF

Efficient Application of Multi-Trade Contract Method to Public Construction Project (공공건설사업 직할시공제 적용의 문제점 및 효율적 적용 방안)

  • Chang, Chul-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.35-44
    • /
    • 2013
  • Multi-trade Contract Method was introduced as a means of cutting down construction cost of public housing for low income people. Before a specific project delivery method is applied to large public construction project, it is necessary to discuss all the issues raised up from all the parties in construction industry and all the issues which can impact project performance. Thus the interviews were conducted with industrial professionals from diverse organizations and previous studies were investigated to figure out how this newly introduced project delivery method may impact owner's role and responsibility and project performance in terms of cost, schedule, quality and risk. Under the Multi-trade Contract Method, project owner's management tasks will be highly increased, so it should be checked out if the owner can do its role and responsibility. Public owner's organization also needs to be changed and proper project management procedure and system need to be established. In addition, for efficient application of Multi-trade Contract Method, public owner should consider diverse management approach to deliver the project, and how to select and maintain qualified specialty trades.

A Basic Study of Construction Procurement Management using Block Chain & Big Data Technology (블록체인과 빅데이터 기술을 이용한 건설 조달 관리 기초 연구)

  • Kim, Ki-Ho;Son, Seung-Hyun;Kim, Sun-Kuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.127-128
    • /
    • 2019
  • The cost of procurement in construction projects varies depending on the type of project, but the proportion of the cost component is very large. Therefore, efficient procurement system operation affects the success of the project. However, difficulties arise in procurement management due to problems such as availability of data due to limited information, inaccurate scheduling and integration of costs. Therefore, the purpose of this study is to develop a procurement management system to help efficient communication decision by combining Big Data which can analyze a lot of information and Block Chain technology which can secure information and record reliability to satisfy the above requirements. The results of this study are used to develop a system to develop academically improved procurement management system and practically to develop a system to secure business competitiveness and to facilitate rapid communication among project participants.

  • PDF

Problems and Solutions for the Private-funded Railroad Station Project Management (철도 민자역사 사업수행체계 개선방안)

  • Park Chan-Sik;Jeon Yong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.172-180
    • /
    • 2004
  • Recently, there are growing concerns on the introduction of private financing in railroad station construction project. But private-funded station project does not have the efficient delivery system. This study is focused on the recommended solutions about the private-funded station project management. Through the literature survey and interview, it is investigated and analyzed that project management has the problems. The problems are classified as 2 areas: law & regulations and job practice. The problems in law & regulations are a lowing on the profitability, and an unreasonable project team selection process. Job practice has problems such as delaying in authorization process, and inferior feasibility analysis. The study suggests several recommended solutions related to the problem areas. That are as follows: the efficient return of investment system, the project financing system, the professional project management, the benchmarking team operation, and the cut down on discussion period

A Fundamental Research on Scope Definition for Efficient Landscape Architecture Construction Project (효율적 조경공사 프로젝트 수행을 위한 과업범위설정관련 기초 연구)

  • Joo, Sang-Hyun;Lee, Jae-Keun
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.36 no.3
    • /
    • pp.96-110
    • /
    • 2008
  • Differing from civil engineering and construction, landscape architecture projects are far from efforts in operation and project management. Under the circumstances, it is worthwhile to adopt scope definition from project management for construction and civil engineering in some respects. First, scope definition is able to be conducted through a simple procedure without additional investment in capital and time. Second, the output produced by scope definition is very substantial. The research scrutinized scope definition procedures accompanied by landscape architecture project execution and derived various methods in order to help scope definition for efficient landscape architecture projects. Based on the literature review, a design case study, and an exert interview, the project success elements were developed consisting of 3 sections, 8 categories and 50 elements, grounded on the theoretical base of PDRI. The elements are expected to pave a way to an adequate level of scope definition among participants of landscape architecture projects and contribute in efficient project execution.