• 제목/요약/키워드: Efficiency of working process

검색결과 270건 처리시간 0.027초

Study on System Support for Offshore Plant Piping Process Using 3D Simulator

  • Kim, Hyun-Cheol;Lee, Gyu-Hong
    • 한국해양공학회지
    • /
    • 제34권3호
    • /
    • pp.217-226
    • /
    • 2020
  • An offshore plant is an offshore platform that can process oil and gas resources in rough seas with a poor working environment. Moreover, it is a complex structure with different types of offshore facilities and a large amount of outfitting that connects different offshore installations. In particular, an enormous amount of various piping materials is installed in a relatively narrow space, and thus, the difficulty of working is relatively high compared to working in ships or ground plants. Generally, when the 3D detailed design is completed, an offshore plant piping process is carried out at the shipyard with ISO 2D fabrication drawings and ISO 2D installation drawings. If a worker wants to understand the three-dimensional piping composition in the working area, he can only use three-dimensional viewers that provide limited functionality. As offshore plant construction progresses, correlating work with predecessors becomes more complicated and rework occurs because of frequent design changes. This viewer function makes it difficult to identify the 3D piping structure of the urgently needed part. This study deals with the process support method based on a system using a 3D simulator to improve the efficiency of the piping process. The 3D simulator is based on the Unity3D engine and can be simulated by considering the classification and priority of 3D models by the piping process in the system. Further, it makes it possible to visualize progress information of the process. In addition, the punch content can be displayed on the 3D model after the pipe inspection. Finally, in supporting the data in relation to the piping process, it is considered that 3D-simulator-supported piping installing could improve the work efficiency by more than 99% compared to the existing method.

맞춤형 야구복의 효율적 생산관리를 위한 공정관리 분석 (Process Control Analysis for Efficient Production Management of Customized Baseball Uniforms)

  • 최경미;황현정;전정일;박용수
    • 한국의류산업학회지
    • /
    • 제14권4호
    • /
    • pp.597-606
    • /
    • 2012
  • To increase the productivity and product quality of customized baseball jerseys, this study developed a multi-variable system for a production process that efficiently controls diverse production management factors. The working time was measured through the establishment of a standard process where skilled workers and Chinese factory workers manufactured 5 sets of the same basic design jerseys. Based on the measured working time (1,136 seconds/per unit), the multi-variable process control system was developed, where hourly production management is possible according to the involved workers and equipment types. Each process was assigned accoding to the production management factors for a total of 28 standard processes. The processes were developed based on consideration of work characteristics according to the order of needlework of open-type set baseball jerseys with sleeves(the basic design of baseball jerseys)to result in a customized production system structure that could be set up with multi-variables. As a result, a total 12 types of systems were developed in consideration of the personnel involved and the number of equipments. The optimal production management system (with the highest efficiency compared to the number of workers)was A-2, B-1, C-1. D-2, E-2, F-1, and G-1. This system had extremely high efficiency and showed 99% assignment efficiency for the 7-person team. Though not optimal, possible process assignment for each working personnel is proposed as a reserve process in case work modification is inevitable due to malfunctions and the absence of equipments.

과실 채소중 잔류농약(유기인제)에 관한 연구 (Organophosphorus Insecticide Residues in Fruits and Vegetables)

  • 윤숙자
    • 환경위생공학
    • /
    • 제5권1호
    • /
    • pp.83-92
    • /
    • 1990
  • Adapting two step aeration system to a waste water treatment of W-paper manufactory as Full-Scale Plants, we drew a following conclusion from its practical working. 1. Because BOD removal efficiency was 20% in A-Stage, 90% in B-Stage and total removal efficiency was 97%. It worked treatment plant well and was suitable for effluent water standard as well. Because COD removal efficiency was 42% in A-stage, 71% in B-stage and the total removal efficiency was 94% COD control was possible in effluent water quality. 2. Treatment efficiency according to a load capacity was average 20% in 1.401 BOD kg/m3/d load of A-Stage and average 90% in 0.273 BOD kg/$\textrm {m}^3$ / d load of B-Stage. 3. Treatment efficiency according to a ratio of F/M was 2.657--5.024 kg BOD/kg MLSS/d in A-Stage and BOD removal efficiency was 16-261 in the same stage. The ratio of F/M was 0.068-0.094 kg BOD /kg MLSS/d and BOD removal efficiency ratio was 85-94%. Therefore treatment efficiency could be kept stably and volume of aeration tank could be reduced wholly. 4. Treatment efficiency according to MLSS appeared BOD 20%. COD 42%, in A-Stage and removal efficiency appeared BOD 90%, COD 71% in B-Stage. They were suitable for plan condition. 5. Because of working of complemented treatment plant by AB-Process. 20,000,000 Won a month was saved than the ordinary working cost. Therefore, it was assumed that invested cost could be recollected in 19 months or so consequently.

  • PDF

김 양식장 채취선의 운항거동과 수확조업에 관한 연구 (A study on the havesting process and operating behaviour of working ships for farming laver)

  • 김옥삼;민은비;황두진
    • 수산해양기술연구
    • /
    • 제56권3호
    • /
    • pp.223-229
    • /
    • 2020
  • We analyzed the cutting mechanism of laver harvesting machine in the sea area near Gooam Port in Goheung, Jeollanam-do, and investigated the change and efficiency of laver collecting operation in the working ship. The laver working ship slides uniformly from the bow to the upper part of the laver collecting machine on the deck and cuts the wet laver attached to the bottom of the net at the blade of the havesting machine. The laver farming net, which was loaded with laver turrets on the deck by gravity and collected primitives, consisted of a ship structure that led to the stern side and into the sea. The working ship operation is in harvesting process while driving in a S-shape that is separated by one space to efficiently collect the laver net. During laver working ship operation, the speed was 0.51 m/s in the access stage, 0.56 m/s in the havesting stage, and 0.52 m/s in the exit stage. Considering the cutting edge life and production efficiency of the laver harvesting machine, it is appropriate to harvest 1.15 to 1.26 kg/rpm by operating at a rotational speed of about 700 to 800 rpm rather than forcibly harvesting the product at high speed. On the deck of the working ship, 959.7 kg of starboard and 1048.7 kg of center were 964.7 kg of port side. Based on the starboard, 9.3% of the central part and 0.5% of the port side appeared. The reason for this was due to the difference in harvest time according to the turning direction of the working ship.

극저온 $CO_2$ 세정공정의 세정인자 최적화 (Optimization of Cleaning Parameters in Cryogenic $CO_2$ Cleaning Process)

  • 이성훈;석종원;김필기;오승희;석종혁;오병준
    • 한국정밀공학회지
    • /
    • 제25권9호
    • /
    • pp.109-115
    • /
    • 2008
  • The cleaning process of contaminant particles adhering to the microchips, integrated circuits (ICs) or the like is essential in modern microelectronics industry. In the cleaning process particularly working with the application of inert gases, the removal of contaminant particles of submicron scale is very difficult because the particles are prone to reside inside the boundary layer of the working fluid, The use of cryogenic $CO_2$ cleaning method is increasing rapidly as an alternative to solve this problem. In contrast to the merits of high efficiency of this process in the removal of minute particles compared to the others, even fundamental parametric studies for the optimal process design in this cleaning process are hardly done up to date, In this study, we attempted to measure the cleaning efficiency with the variations of some principal parameters such as mass flow rate, injection distance and angle, and tried to draw out optimal cleaning conditions by measuring and evaluating an effective cleaning width called $d_{50}$.

터널 장공발파에서 굴진율 개선 및 작업공정 시간 단축 사례 (Case Study for the Improvement of Tunnel Advance Rate & the Time Reduction of Working Process in Long Hole Blasting About Tunnel Excavation)

  • 김희도;이준원;이하영
    • 화약ㆍ발파
    • /
    • 제31권2호
    • /
    • pp.32-39
    • /
    • 2013
  • 일반적으로 장공발파 방법은 과거 대규모 채탄막장이나 댐 기초굴착, 광산 등에서 행하여져 왔으나, 최근 우리나라에서 신설되는 토목터널에서 시공 효율성 및 경제성을 목적으로 많이 실시되고 있다. 고속국도제 600호선 부산외곽 고속도로 ${\bigcirc}$공구 또한 총연장 약 8km의 4차선 대단면 도로 터널로서 Type I, II, 4.4m 장공발파를 실시하는 현장이다. 그러나 당 현장에서는 발파 후 굴진율이 약 75%에 그쳐 발파 후속작업 시간에 영향을 미치게 되고 그로 인하여 전체 작업공정 시간이 증가하여 계획된 굴진을 못하는 현상이 자주 발생되었다. 본 논문에서는 당 현장에서 위 문제를 극복하기 위하여 실시된 장공발파 공법 중 천공경과 가장 밀장전 할 수 있는 ${\phi}36mm$폭약을 적용하여 굴진효율을 향상시키고 작업공정 시간을 단축시킨 사례를 소개하고자 한다.

Business Process Efficiency in Workflows using TOC

  • Bae Hyerim;Rhee Seung-Hyun
    • 한국정보시스템학회:학술대회논문집
    • /
    • 한국정보시스템학회 2003년도 추계학술대회
    • /
    • pp.55-63
    • /
    • 2003
  • Workflow Management System (WFMS) is a software system to support an efficient execution, control and management of complex business processes. Since traditional commercial systems mainly focus on automating processes, they don't have methods for enhancing the task performer's efficiency. In this paper, we propose a new method of executing business processes more efficiently in that a whole process is scheduled considering the degree of the participants' workload. The method allows managing the largest constraints among constituent resources of the process. We utilize DBR scheduling techniques to develop the method. We first consider the differences between workflow process models and DBR application models, and then develop the modified drum, buffer and rope. This leads us to develop WF-DBR (WorkFlow-DBR) that can control the proper size of the task performers' work list and arrival rate of process instances. Use of WF-DBR improves the efficiency of the whole process as well as the participants' working condition. We then carry out a set of simulation experiments and compare the effectiveness of our approach with that of scheduling techniques used in existing systems.

  • PDF

비접촉식 표면연마를 통한 디버링 효과 향상에 관한 연구 (A Study on Improving Deburring Efficiency Using Non-Contact Finishing Process)

  • 이정희;곽재섭
    • 한국기계가공학회지
    • /
    • 제21권6호
    • /
    • pp.74-80
    • /
    • 2022
  • The surface status of a workpiece determines its functionality, product quality, and manufacturing costs. Thus, several finishing technologies have been widely investigated and applied to improve surface characteristics. In this study, rotational electro-magnetic abrasive finishing (REMAF) was suggested as a non-contact finishing process to achieve high geometric precision. To verify the effects of the REMAF process on burr removal on the surface of Al6061, experiments were conducted using the Taguchi method. Based on the experimental results analyzed by the S/N ratio and ANOVA, the optimal conditions were defined as A3B2C3D3 that corresponded to 1,800 rpm of rotational speed, 1.5 kg of abrasive particle weight, 0.7 mm of abrasive diameter, and 15 min of working time. In addition, the particle weight was a key attribute for deburring, whereas the working time was less effective.

실내건축 실시설계도면 작성방법 연구 (The Study of Working Drawing Method in Interior Architecture)

  • 오인욱;김부곤
    • 한국실내디자인학회논문집
    • /
    • 제8호
    • /
    • pp.44-57
    • /
    • 1996
  • Now interior designers have to meet this challenge by rising to the occasion and taking advantage of opportunities while strengthening their skills which have not kept pace with the increasing emphasis on design. furthermore, they are hampered by the lack of a general working design methodology. Interior designers in Korea have been slow to recognize the need for developing a specification methodology manual which could be adapted to meet varying requirements and modified to reflect designers experiences. The design process in Korean interior design often involves utilizing drawing document methods based on architectural prototypes rather than upon drawing methods developed by design firms as a result of work experience s and unique needs. However, these unique nees are nearly always limited by traditional working drawing methods. This has led to confusion and inaccuracies due to the lack of a single starndardized and universally acceptable working drawing methodology which is capable of reflecting the needs of all parties involved , partiality those of interior designers. This thesis is an attmepted to establish the necessity for developing a better working drawing methodogoy or technical mans of satisfying the information sorting and processing need s of interior design professionals, a five step suggestion for developing such a methodology follows. First, arrange pertinent design research information by means of a process which can be employed throughout the design process, from inception through to working drawing stage. The end result should be an interior architectural design process culminating in a pattern skillfully blending architecture, vision and product with environment . The design process should be manifested into a series of definable steps and yet sufficiently flexible and variable in order to provide the most apropos design solution. Secondly , motify the design methodology systematically according to site conditions and prevailing construction technology and manifest the design process in a booklet form so that it reflects a desired pattern. Thirdly, this methodology should incorporate a stand-ardized and functional process capable of being utilized to impact clear design concepts and objectives with preci-sion and efficiency in a manual form.

  • PDF

단상유도전동기의 효율개선을 위한 평형운전에 관한 연구 (A Study on Balanced Operation for Efficiency Improvement of Single Phase Induction Motor)

  • 백수황;김병택;권병일
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 춘계학술대회 논문집 전기기기 및 에너지변환시스템부문
    • /
    • pp.143-145
    • /
    • 2006
  • In this paper, single phase induction motor achieved improvement in efficiency by adapting the condition of Balanced operation and Quasi-balanced operation. Also, the process of efficiency improvement to find the optimum point of secondary resistance and running capacitor for working single phase induction motor is performed in order to attain the conclusion to put out the maximum efficiency at the rated operation point with meeting the starting torque.

  • PDF