• Title/Summary/Keyword: Eco-river restoration

Search Result 57, Processing Time 0.026 seconds

Analysis of the Eco-experience Program of the Restoration Rivers in Seoul (서울시 복원하천의 생태체험 프로그램 분석)

  • Kim, Dong-Chan;Kim, Shin-Won;You, Kyung-Min
    • KIEAE Journal
    • /
    • v.10 no.6
    • /
    • pp.47-54
    • /
    • 2010
  • The significant aim of this research is to suggest the applicable data for the future urban ecological restoration of rivers' activity and the direction of the future eco-experience program found by analyzing the state and progress of the restoration of the river ecological experience program. For this purpose, we researched the eco-experience program's outline and details of its operation and method from six rivers among all of the rivers going through restoration. We also carried out telephone interviews and in-depth interviews with the office staff that takes care about each river at the district office to investigate the specific details not revealed by our analysis, the number of operations, and the number of participants. We compared the number of operations to the number of participants and the frequency of participation of each river in a year. As a result, they have revealed that the participants of the eco-experience program ranged in variety including local students, families, and local citizens as a whole. Also the intimate observation and experience with nature gave the participants a better understanding of the ecosystem. In addition, it is revealed that the cheonggye river goes through its own standard of strict inspections and management daily. It is quite easy to notice that the cheonggye river shows a higher level of participation and operating activity than other rivers.

A Study on Improvements of Eco-Natural Map Preparation Guideline through an Assessment of River - Focused on the Hwang River - (하천평가기준을 반영한 생태·자연도 작성지침 개선방안 연구 - 황강을 대상으로 -)

  • Kim, Dae-Young;Sung, Hyun-Chan
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.15 no.5
    • /
    • pp.19-29
    • /
    • 2012
  • The purpose of this study is to suggest improvements of Eco-Natural map preparation guideline by presenting assessment methods that can be applied to the result of river ecosystem health survey and assessment, using the Geographic Information System. The area for studying is the main stream of the Hwang River where is easy to collect data and available to compare before and after of river assessment. It was reevaluated by reflecting the result of river ecosystem health assessment of the Ministry of Environment. As the result, Eco-Natural map of the study area reflecting the river assessment, the changes in the area ratio by grade have been increased from 1.14% to 14.03% in the first-grade and from 24.64% to 43.91% in the second-grade. It is considered to present more realistic grade due to the assessment of the rivers that have not been reflected in the meantime. Consequently, the result of this study will be useful for establishing the development projects on the rivers, providing the foundation for more realistic and active protection.

Stream Eco-corridor Restoration by Out-aged Small Dam Removal - Focused on Gokreung River Gokreung 2 Small Dam Removal - (기능을 상실한 보 철거를 통한 하천생태통로 복원 - 곡릉천 곡릉2보 철거를 대상으로 -)

  • Ahn, Hong Kyu;Woo, Hyoseop;Rhee, Dong Seop;Kim, Kyu Ho
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.11 no.2
    • /
    • pp.40-54
    • /
    • 2008
  • Small and large dams are installed in the course of a stream for maintaining the water level of the stream or obtaining agricultural water. Currently about 18,000 of them are installed in Korea to supply water. However, the environmental problems of small dams are well known : the interruption of stream eco-corridors, deterioration of water quality in the upper reaches of the small dam, changes in the habitats of riparian organisms, damages to the stream scenery. In a very few of these small dams artificial eco-corridors like fishways are installed, but the number is very minimal.Accordingly, to efficiently restore stream eco-corridors by removing these small dams, it will be necessary to closely examine physical impacts, such as changes in the riverbed and changes in the shape of the stream caused by the removal, chemical impacts, such as changes in water quality, and transport and accumulation of contaminated sediments and biological impacts, such as changes in the habitats of organisms, and develop related technologies in advance, and have these technologies verified through demonstration application in the sites. In this study, we analyzed the physical, chemical and ecological impacts of the removal of the above-mentioned small dams, and conducted a research on the demonstration small dam removal project for a spot investigation. As a result, the small dam removal will restore the eco-corridor, there by improving the habitat of fishes and crustaceans. The number of major underwater organisms inhabiting the Gokreungcheon, such as Korean spotted sleepers, Chinese minnows, Microphysogobio yaluensis, Abbottina rivularis, stone morokos, striped shinners, long-nosed barbels, and Chinese mitten crabs, is expected to increase, and the food chain in the ecosystem will improve so that species diversity will improve as well.

Ecological Planning for the Preparation of an Eco-Road on the Pyungtak-Eumsung Highway (평택-음성간 고속도로의 에코로드 조성을 위한 환경생태계획)

  • 강현경;민권식;장종수;한봉호
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.32 no.3
    • /
    • pp.32-42
    • /
    • 2004
  • This study aims at establishing an ecological planning for road construction. which is considered to be a main cause of damage to the natural environment in Korea. This study focuses on the Pyungtak-Eumsung Highway development project. It considers the ecological factors and status of the site and its surrounding area. The study site is a four-way highway with a width of 23.4m and a length of 5.7km that spans from Hyungok-ri, Anseong City, Kyeonggi Province to Jukhyun-ri, Jincheon-gun, Chungbuk Province. The objective of the plan is "the establishment of an eco-road in harmony with nature." The plan is divided into five detailed goals: 1) restoration of river morphology and ecosystem through ecological planning; 2) establishment of wet biotopes; 3) construction of ecological corridors; 4) restoration of damaged forest ecosystems; and 5) ecological restoration of the roadside slopes that are linked with the surrounding forest. A master plan has been developed based on the detailed goals. The master plan involves: 1) establishment of a natural river, wet biotopes, and ecological corridors that facilitate the movement of amphibians, wild fowls, mammalians and fish; 2) development of a planting plan for the visitor center, the tunnel entrance, and soundproof banks; and 3) the presentation of a planting model for restoring roadside slopes that are connected to the surrounding forest. The eco-road plan needs to entail ecological conservation and restoration plans. In addition, a monitoring plan for ecological corridors and habitats should be included in the comprehensive plans, along with the continuous development of environmentally friendly technologies.

Application of Eco-hydraulics Principles in Rehabilitation of Urban River System

  • Meiyan, Feng;Jung, Kwansue
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2018.05a
    • /
    • pp.446-446
    • /
    • 2018
  • The urban rivers have unique hydraulic characteristics between natural rivers and artificial canals. These hydraulic characteristics determine the characteristics of urban rivers with small environmental capacity and fragile ecosystems. With the development and utilization of natural resources, the pollutants that have been produced enter the river through different channels, which seriously damages the urban river ecosystem. Therefore, how to restore contaminated water to a normal state and reproduce a natural, self-regulating ecosystem is one of the most concerned issues in recently. Eco-hydraulics is a cross-disciplinary subject of hydraulics biology and ecology. It is closely related to the protection of rivers, wetlands, and ecological self-repair. In this study, The basic principle of eco-hydraulics is concisely described and its approaches to protection and rehabilitation of river are introduced. The conception of establishing gardenesque eco-pond for urban use is suggested. The strategies including changing the hydrodynamic features of rivers, adjusting the breeds and species and constructing the gardenesque eco-pond for improving the exist ing urban rivers are proposed. It provides scientific information and guidance for the restoration of rivers and wetlands by studying the close relationship between river hydraulic characteristics, currents, and rivers and ecosystems.

  • PDF

A Study on Recognition of Land Acquisition for Ecology Restoration Project in Ecological and Landscape Conservation Area of Donggang River Basin. (동강유역 생태·경관보전지역 내 매수토지 생태복원사업 인식도 연구)

  • Li, Lan;Koo, Bon-Hak
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.20 no.4
    • /
    • pp.15-28
    • /
    • 2017
  • A protected area means a space designated and protected by law from development pressure and environmental pressure. It is mainly designated to protect specific ecosystems, natural landscapes, and cultural resources from irrational development (or damage), and involves policies of the public sector such as central and local governments. The United Nations Educational, Scientific and Cultural Organization (UNESCO) has conducted conservation and restoration projects for preserving natural ecosystems and genetic resources. In order to conserve the ecosystem in the protected area, national and public organizations purchase private land and use it ecologically; in addition, ecological restoration project is carried out for the purpose of creating waterside ecological belt or preserving ecosystem. Land acquisition refers to the land where highly influenced by the water quality and need to restore, and purchased by negotiating with the landlord. Although the nation and public institution carried out ecosystem restoration project for partial purchase land in order to conserve ecosystem, it is below the expected effect due to lack of comprehensive management system and have some problems in restoration project and unification of management institutions. Land acquisition in Donggang River Basin Ecological Conservation area is initiated in 2005 for creating income of local residents and ecological restoration. However, the lack of overall management and awareness resulted in poor vegetation growth and poor response by local residents due to terrain exposure. As such, there is insufficient research on the current situation and systematic integrated management although the number of land acquisition is increasing year after year. Futhermore, overall recognition and follow-up monitoring of eco-restoration are still inadequate. Therefore, the survey on the awareness of the purchase land ecosystem restoration project is necessary for the efficient restoration project and establishment of the management strategy for land acquisition in the future. Therefore, in this study, we provide fundamental materials on further research projects by carrying out research on the awareness of ecological restoration projects in the Donggang River basin ecological preservation area.

Eco-river Restoration and River Management in Response to Climate Change (기후변화를 고려한 생태하천 복원 및 관리방향에 관한 연구)

  • Kang, Hyeongsik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.1
    • /
    • pp.155-165
    • /
    • 2014
  • In this study, using a complex of physical, chemical, and biological evaluation factors, the ecological vulnerability to climate change were evaluated at each river in the Nakdong river basin. First, runoff, sediment rate, and low flow discharge changes according to AIB climate change scenario using the SWAT model were simulated. Also, for the assessment of chemical and biological factors, 48 points that water quality monitoring sites and ecological health measurement points are matched with each other was selected. The water quality data of BOD and T-P and the biological data of IBI and KSI in each point were reflected in the assessment. Also, the future rise in water temperature of the rivers in Nakdong river basin was predicted, and the impact of water temperature rise on the fish habitat was evaluated. The top 10 most vulnerable points was presented through a summary of each evaluation factor. This study has a contribution to river restoration or management plan according to the characteristics of each river.

The Constructability Evaluation of Ecological Restoration Construction Using Environment-friendly Design Factor - In the case of Construction of Gucheon Eco-River in Geoge City - (친환경적 설계인자를 적용한 생태복원공사의 시공성 평가 - 거제시 구천천 생태하천 조성공사를 중심으로 -)

  • An, Byung-Chul
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.16 no.4
    • /
    • pp.99-114
    • /
    • 2013
  • In this study, constructability of ecologocal stream restoration process was evaluated and improved approaches for habitat were suggested. The study site is Gucheon River in Geoje city where conducted ecologocal restoration work within maintaining its flood control function. Application of ecological design factors and constructability in the process from planning to construction was analyzed and its results are as follows: In the process of planning and designing, it was focused more on the naturality of Gucheon River rather than the human convinience and ecological design factors were applied within the ecological capacity of the site. First, the indexes for constructability evaluation is selected. It was classified into three major categories as construction quality, design quality and construction administration system. Each index has details, so there are twenty sub indexes for contractibility evaluation. Second, the evaluation results shows that the index most in need of improvement was plumbing construction, followed by Stone construction and pavement construction. design concept was evaluated as appropriate in entire categories. Finally it is suggested that it can be improved in both process of design to enhance the technology and process of construction to enhance the quality management. The constructability of ecological stream needs adaptive management and it must be discussed with its designing which is at the stage before construction. Also it needs discussion with its designer constantly and feed-back process.

An Analysis of Ecological Habitat Characteristics in the Nonsan Stream and Yanghwa Stream (논산천과 양화천 수계 내 하천 생물서식처의 특성 분석)

  • Ahn, Tae-Woong;Ahn, Hong-Kyu;Chun, Seung-Hoon;Choi, Jun-Kil;Ha, Sung-Ryong;Oh, Jong-Min
    • Journal of Environmental Impact Assessment
    • /
    • v.19 no.2
    • /
    • pp.127-140
    • /
    • 2010
  • This study investigates the relation between the location of a habitat and the ecological connections according to the habitat type in the riparian zone at the Nonsan Stream and Yanghwa Stream. Stream habitat is classified into nine types for the aquatic insects and fish. For vegetation and birds, habitat is classified into two types of medium-scale streams, including both physical and chemical streams are analyzed accordingly. Nowadays, The fundamental goal of the river environment restoration enterprise is the rehabilitation or the restoration of the characteristic the river scenic or environment. For instance, The Channel habitats which has physical nature environment such as flat, speedy rapids, or closed-channel wetland, pool are constructed by artificial, Consequently, make them autogenesis smoothy eco-environment. However, the river environment are controlled not only physical environment, but it also need reasonable the quality of the water to compose smoothly. Finally, understanding what influence are effecting on physical habitat environment which are made by natural factors to water quality are very important factor for the river environment restoration enterprise Therefore, In this research, we are targeting to a basin to investigate the environment of the physical channel habitat and evaluate the changing of the water quality. This results will be a important characteristic that can judge the physical habitat and reciprocality connected to the water quality or adequacy of restoration technology. Therefore in this study, as a step to quantify functions and values of habitats and definite factors to perform habitat, we selected a representative stream of sand-stream, gravel-stream to classify habitat characteristics and quantified the physical, chemical, biological characteristics.

A Study on Slope Greening Technique Using Eco-Stone -Focused on growth conditions of plant species among treatment blocks- (Eco-Stone을 이용한 사면녹화공법에 관한 연구 -식재식물종의 처리구간 생장상태를 중심으로-)

  • Ahn, Tae Seok;Jo, Hyun-Kil;Ahn, Tae-Won;Kim, Ji-Ho;Chung, Kyung-Jin;Kim, Mi-Kyeong
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.7 no.2
    • /
    • pp.87-95
    • /
    • 2004
  • For the slope stability and revegetation of retaining wall, Eco-Stone was built beside a newly constructed road in August, 2002. Eco-Stone blocks were constructed in 4 different combinations of irrigation and soil types. Within the Eco-Stone, planted were 6 species such as Forsythia koreana, Rhododendron mucronulatum, Spiraea prunifolia var. simpliciflora, Rhododendron sp. Euonymus japonica, and Aster koraiensis. Shoot growth was greater on common soils than at a better soil treatment for Forsythia koreana(P<0.01) and Spiraea prunifolia var. simpliciflora(P<0.05), while there were no significant differences for the other species. Biomass increment of the planted species also did not show significant differences between irrigation types, except Rhododendron sp. and Aster koraiensis of which biomass was higher under irrigation than at no irrigation for common soils. Most of the planted individuals were alive, showing survival ratio of 90~97% with no significant differences among treatment blocks. These results imply that the Eco-Stone can be used economically for slope stability and revegetation instead of concrete blocks, without a specific soil and irrigation requirement.