The 3th International Conference on Construction Engineering and Project Management
/
pp.1140-1147
/
2009
Productivity measurement of construction machinery is a significant issue faced by many contractors especially those involved in earthwork projects. Traditionally, equipment production rate has been estimated using data available in manufacturers' catalogues, results of previous construction projects, or personal experience and assessments of the site personnel. Actual production rates obtained after the completion of a project demonstrate the fact that most of these methods fail to provide accurate results and as a direct consequence, may lead to unrealistic project cost estimations prepared by the contractors. What makes this more critical is that in most cases, inadequate cost estimations lead the entire project to exceed the initial budget or fall behind the schedule. In this paper, a linear regression method to estimate bulldozer productivity is introduced. This method has been developed using SPSS-16 software package. The presented method is used to estimate the productivity of Komatsu D-155A1 series which is commonly used in many earthmoving operations in Iran. The data required for the numerical analysis has been collected from actual site observation and productivity measurement of 60 pieces of D-155A1 series currently being used in several earthmoving projects in Iran. Comparative analysis of the output data of the presented regression method and the existing productivity tables provided by the manufacturer shows that when compared to the actual productivity data collected on the jobsite, a significant increase in accuracy and a remarkable reduction of data variance can be achieved by using the presented regression method.
건설산업은 생산성, 인력, 산업재해 측면에서 어려운 과제에 직면해 있다. 4차 산업혁명과 함께 다양한 첨단기술이 대두되면서, 건설분야에서는 이런 문제들을 첨단기술을 활용해 해결하려 노력하고 있다. 그 일환으로 다수 및 다종의 건설장비가 투입되는 토공현장에서 생산성과 안전성을 높이기 위한 건설장비 관제시스템을 개발하고 있는 중이다. 건설장비 관제시스템은 건설장비의 이동경로를 최적화해 생산성을 높이는 기능이 필수이다. 트럭의 현장 내 이동경로를 최적화하려면, 가설도로 위치를 최적화해야만 한다. 하지만 현재 가설도로의 품질에 관한 사항만 규정되어 있을 뿐, 효율적인 방식으로 가설도로의 위치를 결정하는 정형화된 프로세스는 없는 상황이다. 이에 본 논문에서는 현장조사와 면담/설문조사를 통해 가설도로의 위치결정과 관련된 요소 및 그 중요도를 파악한 뒤 이를 기반으로 가설도로의 위치 결정을 위한 방법론을 제시하였다. 이후 사례연구를 통해 해당 방법론이 토공작업의 생산성 향상에 도움이 됨을 확인하였다.
최근의 연구에 의하면 국내 대부분의 건설사는 리스크 관리를 효과적으로 하고 있지 못하며, 리스크 관리 시스템의 개선이 필요한 것으로 판단된다. 또한 리스크 관련 연구도 대부분 거시적인 관점에서의 리스크를 다루고 있으며 프로젝트 시공단계에서의 공정리스크를 다룬 연구는 거의 없는 실정이다. 따라서 본 연구에서는 공정리스크 중 흙막이공에서 발생할 수 있는 리스크 요인의 분석 및 분류를 통해 리스크 대응 방안을 제시하고자 하였다. 이를 위하여 리스크 전문가를 대상으로 워크숍을 실시하여 아파트 흙막이공 시공 중에 발생할 수 있는 리스크를 식별 및 분석하였다. 연구 결과 95 % 신뢰구간에서 49.7억 원의 절감이 가능할 것으로 예상되었으며, 최대 발생 가능한 비용은 150억 원에서 100억 원가량으로 줄어들었다. 리스크 저감 비율 기준으로 별다른 투입비용 없이 리스크를 저감할 수 있는 리스크, 리스크 대응 시 효과가 큰 리스크와 효과가 미미한 리스크로 구분하여 나타났다. 따라서 본 연구에서 제시한 유형들과 리스크 요인들을 지침으로 삼아 현장 여건에 맞는 적절한 대응 전략을 갖추고 체계적으로 대응할 경우 프로젝트를 성공적으로 운영하는 데 도움이 될 것으로 기대한다.
토공은 건설공사의 시작이며 기초가 되기 때문에 가장 중요한 공정이다. 특히 토공의 다짐측정은 건설공사의 품질과 생산성에 직결되는 중요한 요소이다. 기존 다짐측정은 주로 들밀도 시험, 평판재하시험과 같은 아날로그 방식을 이용하여 수행되었다. 하지만 최근 4차 산업혁명의 고도화에 따라 스마트건설기술이 대두되면서 다짐측정 또한 기존 아날로그 시험의 단점을 보완한 기술에 대한 연구가 활발히 진행되고 있다. DCPT는 기존 시험법과 비교하여 간편하고 속도가 빨라 최근 관심이 증대되고 있지만 데이터를 수기로 측정하는 아날로그 방식으로 이력관리와 데이터 검증 등 여러 단점을 가지고 있다. 본 연구에서 개발한 IoT 기반 DCPT 시스템은 기존 DCPT에 디지털 와이어센서, 모바일 폰, 블루투스를 결합했다. 개발된 장비는 아날로그 DCPT 뿐만 아니라 다른 다짐시험법과 비교하여 빠른 시험시간, 1인 계측, 저비용, 모바일 기반 계측 이력 및 데이터 관리, 실시간 데이터 확인 등의 장점을 갖는 것이 특징이다. 추가로, 개발된 장비의 현장 적용성 검증을 위해 아날로그 DCPT와 함께 테스트베드를 구축하여 검증하였다. 테스트베드는 롤러장비를 통해 실제 토공현장과 유사한 조건으로 구축했다. DCPT 데이터는 322개 측점에서 총 3220개의 데이터를 획득했다. 분석결과로 IoT 기반 DCPT의 성능은 우수한 것으로 나타났으며 개발된 장비를 통해 구축된 테스트베드 또한 다짐이 수행됨에 따라 안정적인 결과를 보이는 것으로 나타났다.
최근 국내외에서 BIM (Building Information Modeling)에 대한 관심이 증가하며 도입사례가 증가하고 있으며, 3차원 모델링은 BIM의 도입을 위한 첫 단추다. 그러나 도로, 철도와 교량과 같은 토목시설물 중심의 3차원 모델링의 효율화 방안에 대한 연구는 많이 이루어지고 있는 반면, 토공사에는 3차원 모델링의 효율화 방안에 대한 연구가 부족한 실정이다. 특히 비탈면 설계는 주위 환경과 지반의 특성에 따라 복잡다단한 형상을 가지는 경우가 많기 때문에 사용자가 비탈면 3차원 모델을 작성하기 위해 효율적인 방안이 필요한 상황이다. 이에 본 연구에서는 국내에서 개발된 e-BIM 모델러와 해외 Autodesk 사의 Civil 3D의 비탈면 모델링 기능의 인터페이스와 절차를 세세히 분석하여 3차원 면의 생성 간격을 입력하는 기능, 기준지형을 다수로 선택하고 각 기준지형 별로 모델링 파라미터를 입력하고 저장할 수 있는 기능을 개발하고 인터페이스를 개선하였다. 본 연구에서 개발한 시스템은 앞서 분석한 소프트웨어와 비교하였을 때 5단계의 절차만으로 효율적으로 비탈면 3차원 모델링을 수행할 수 있고, 클릭 및 입력횟수를 줄일 수 있었다. 본 시스템의 검증을 위해서 개발한 시스템과 타 소프트웨어를 활용하여 동일한 조건 및 형상의 비탈면 모델링을 수행한 결과, 개발한 시스템을 통해 비탈면 모델링을 3회 실시하면 타 소프트웨어를 사용할 때보다 숙련자의 경우 최소 1.8배, 비숙련자의 경우 최소 2.4배만큼 빠르게 작업을 완료할 수 있었다. 이를 통해 비탈면 모델링을 보다 효율적으로 수행하고 모델링 파라미터 저장 기능을 통해 급작스러운 설계변경사항을 적용할 수 있을 뿐만 아니라, 향후 택지조성공사 BIM 도입의 활성화에 기여할 것으로 기대된다.
본 연구에서는 경기도 소재 AY 고속도로 토공사 현장에 지능형 다짐기술을 적용해 대표적인 지능형 다짐값인 CMV를 획득했다. 시험시공을 통해 품질관리 목표 CMV를 결정하고, 이를 이용해 본 시공 구간의 다짐품질을 관리하는 과정을 실증했다. 시험시공 결과, 평판재하시험이 수행된 위치로부터 5m 이내에서 측정된 CMV의 평균값과 지지력 계수의 선형회귀식을 통해 목표 CMV를 결정하는 것이 최적임을 확인했다. 시험시공을 통해 결정된 목표 CMV를 기반으로 본 시공 구간의 다짐품질을 확인한 결과, 국내 지능형 다짐공 표준시방서에서 제시된 품질기준은 만족했지만, 오스트리아, 미국에서 제시된 품질기준은 만족하지 못했다. 특히 다짐품질의 변동성과 관련한 지표를 대부분 만족하지 못하는 것으로 나타나, 변동계수가 17~55%에 달하는 CMV의 변동성에 비해 관련 기준이 매우 엄격하게 설정되어 있음을 확인했다. 추후 추가적인 현장시험을 통해 지능형 다짐 기반 다짐품질 관리 과정을 실증하여, 각 기준에서 제시하고 있는 규정의 적절성을 검증하고 개선해야 할 것으로 보인다.
고속도로 토공에서 대부분을 차지하는 성토부의 다짐도 평가는 일반적으로 평판재하시험에 의해 이루어진다. 평판재하시험은 전통적인 시험법으로 높은 신뢰성을 가지고 있지만, 반력장비를 공수해야 하고, 시험 시 개소당 약 40분의 시간이 소요됨에 따라 광활한 토공부 전체를 관리하기에는 한계가 발생할 수 있다. 한편, 국토해양부에서는 이를 극복하고자 2010년에 '포장 하부구조 다짐관리 잠정지침'에서 간편한 다짐도 평가방법 기준을 제시한 바 있다. 하지만 10년이 지난 지금까지 고속도로공사 현장에서는 활용하고 있지 못하고 있다. 따라서, 본 연구에서는 잠정지침에서 제시한 시험법 중 충격재하 방식의 LFWD(Light Falling Weight Deflectometer)를 활용한 다짐도 평가방법에 대한 활용성을 검증하고자 하였다. 이를 위하여 현장 토질 성상 및 다짐도별로 평판재하시험 및 LFWD시험을 실시하여 상관관계를 도출하였다. 시험결과, 80% 이하의 상대 다짐도를 가진 지반에서는 시험데이타의 일관성이 없었으나, 그 이상에서 상관도가 증가하는 경향을 가지는 것을 확인할 수 있었다. 향후 충격재하 방식의 시험값의 일관성 확보를 위하여 본 연구 결과를 참고하여 시험방법 또는 시험장비를 개선한다면 토공부 다짐도 관리 사각지대를 해소하는 데에 큰 역할을 할 수 있을 것으로 기대한다.
This report describes the first prize design of Midongsan Eco-park, which is located in Chungcheongbuk-do (North Chungcheong) province. Criteria of the winning design are as follows: 1) The design should include a neighborhood park as well as a portion of a green zone, in order to harmonize the area ecosystem, gradually assimilate the surroundings, and serve as an education tool for the public. 2) According to an analysis of area maps and a site-inspection, a preserved area, a buffer area, a restored area, and a developed area should be developed. In the buffer and restored areas, major facilities and activity spaces should be set up. 3) Observation trails should be accessible to visitors, and a variety of adventure programs should be available. 4) The eco-park should be designed to provide a habitat for the Gorani (Chinese water deer) which used to live around Midongsan. 5) For sensuous and vivid visitor experiences, diverse programs are to be designed to accommodate different seasons, visitor ages, and required time. Environment and eco-education are to be emphasized to maximize the effect of the eco-programs. 6) Optimal activities for visitors of different ages, optimal time intervals and eco-programs by age are also suggested. 7) Facilities are zoned into three sections according to level of development. Each section has a main area and supplementary areas for better understanding. 8) Nature-friendly arrangement of facilities and construction should minimize earthwork and adverse effects on the local ecology. Throughout the planning, the following things were learned: longer-term analysis including all season's observation is essential; planning, designing, bui Iding and managing should be based on this careful, extended observation. The contest should have taken plate over a longer period of time in order enable more detailed planing of the eco-park For improved management and activities, a volunteer system in linked with schools eco-institutions and NGOs should be developed with eco-interpreters.
다른 산업현장에 비해 토목 시공현장은 작업 공정이 길고 복잡하여 준공시까지 종합관리 및 공정관리, 품질관리가 어렵고 많은 문제점이 발생하고 있다. 본 연구는 토목 시공현장의 상황을 종합적으로 관리하고 현장정보를 상시 모니터링하기 위하여 무인항공사진측량, GPS측량 등을 활용하여 3차원 공간정보를 신속, 정확하게 처리하고, 주요설계, 시공도면 및 공정, 공사비 등을 언제, 어디서든 관리 및 분석하며 시공현장을 종합적으로 관리, 파악할 수 있는 자료를 제공하는데 목적이 있다. 토목 시공현장의 계획에서 준공까지 공정관리, 공사진행 확인 등 빠른 의사결정을 위한 최신의 정보를 제공할 수 있고, 고해상도 3차원 공간정보와 설계도면을 중첩하여 객관적으로 현장상황을 판단할 수 있으며, 현황도, 종 횡단면도를 제작하여 토적표, 내역서, 지반고 변화 등 각종 자료를 신속하게 제공하였다.
본 연구에서는 Value Engineering 기법을 토취장 선정의 도구로 활용할 수 있는지의 여부를 검토하였다. 이를 위해 대규모 택지개발지역의 토취장 후보지들에 대한 지반조사 결과를 분석한 후 토취장 후보지들의 가채량을 산정하였으며, 토취장 후보지들의 VE 평가에는 가중치 부여 매트릭스평가법을 적용하였다. VE 평가를 위해 평가항목을 결정한 후 중요도를 산정하고 평가척도를 설정하였으며, 토취장 후보지에 대한 성능등급 및 성능평가를 수행하여 토취장 후보지들의 개발 우선순위를 결정하였다. 결과적으로 토취장 후보지들에 대한 상대공사비는 운반거리와 밀접한 관련이 있으며, 운반거리가 멀어질수록 상대공사비는 점차 증가하므로 운반거리가 토취장 선정에 있어 상당한 영향을 미친다는 것을 확인하였다. 또한 최적의 토취장 후보지를 선정하는데 있어 토취장 자체의 조건도 중요하지만, 생애주기비용의 영향을 무시할 수 없는 것으로 나타났다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.