• Title/Summary/Keyword: Earthwork BIM

Search Result 19, Processing Time 0.021 seconds

BIM Based Intelligent Excavation System (BIM 기반 지능형 굴삭시스템)

  • Kim, Jeong-Hwan;Seo, Jong-Won
    • Journal of KIBIM
    • /
    • v.1 no.1
    • /
    • pp.1-5
    • /
    • 2011
  • Earthwork is important in terms of construction time and duration, and highly related to the construction productivity. However, current earthwork system has stick to labor intensive process depending on skilled operator's heuristic decision making, so it is hard to improve overall productivity. To overcome this drawback, this paper presents a BIM based Intelligent Excavation System(IES). The BIM technology is applied in the excavation task planning system, Human-Machine Interface for remote-control/autonomous work environment, and web-based Project Management Information System(PMIS) in the IES integration process, and the results are addressed.

The Improvement of Point Cloud Data Processing Program For Efficient Earthwork BIM Design (토공 BIM 설계 효율화를 위한 포인트 클라우드 데이터 처리 프로그램 개선에 관한 연구)

  • Kim, Heeyeon;Kim, Jeonghwan;Seo, Jongwon;Shim, Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.5
    • /
    • pp.55-63
    • /
    • 2020
  • Earthwork automation has emerged as a promising technology in the construction industry, and the application of earthwork automation technology is starting from the acquisition and processing of point cloud data of the site. Point cloud data has more than a million data due to vast extent of the construction site, and the processing time of the original point cloud data is critical because it takes tens or hundreds of hours to generate a Digital Terrain Model (DTM), and enhancement of the processing time can largely impact on the efficiency of the modeling. Currently, a benchmark program (BP) is actively used for the purpose of both point cloud data processing and BIM design as an integrated program in Korea, however, there are some aspects to be modified and refined. This study modified the BP, and developed an updated program by adopting a compile-based development environment, newly designed UI/UX, and OpenGL while maintaining existing PCD processing functions, and expended compatibility of the PCD file formats. We conducted a comparative test in terms of loading speed with different number of point cloud data, and the results showed that 92 to 99% performance increase was found in the developed program. This program can be used as a foundation for the development of a program that reduces the gap between design and construction by integrating PCD and earthwork BIM functions in the future.

Effectiveness of a Business Model for Adopting a Construction Machine Guidance System (건설장비 가이던스 시스템 도입을 위한 비즈니스 모델 효과)

  • Moon, Sung-Woo
    • Journal of KIBIM
    • /
    • v.8 no.1
    • /
    • pp.24-32
    • /
    • 2018
  • A construction machine guidance system is an assistance system that helps construction equipment operators dig grounds during excavation work at a construction site. This system has long been applied in the overseas countries of the United States, Japan and Europe. However, the system has not been paid much attention in Korea. The objective of this paper is to present a business model for adopting construction machine guidance systems in Korea and evaluate the effectiveness of applying the system to excavation work. The business model in this study shows a new process of applying construction machine guidance system, business stakeholders and revenues, and suggests the benefits to the business stakeholders. A field test of the construction machine guidance system proves that the system can be applied as a tool that can improve the productivity of excavation work. This productivity improvement consequently demonstrates that the business model in this study is a prospective challenge in improving the effectiveness of excavation work at the construction site.

Case Study of Smart Phone GPS Sensor-based Earthwork Monitoring and Simulation (스마트폰 GPS 센서 기반의 토공 공정 모니터링 및 시뮬레이션 활용 사례연구)

  • Jo, Hyeon-Seok;Yun, Chung-Bae;Park, Ji-Hyeon;Han, Sang Uk
    • Journal of KIBIM
    • /
    • v.12 no.4
    • /
    • pp.61-69
    • /
    • 2022
  • Earthmoving operations account for approximately 25% of construction cost, generally executed prior to the construction of buildings and structures with heavy equipment. For the successful completion of earthwork projects, it is crucial to constantly monitor earthwork equipment (e.g., trucks), estimate productivity, and optimize the construction process and equipment on a construction site. Traditional methods however require time-consuming and painstaking tasks for the manual observations of the ongoing field operations. This study proposed the use of a GPS sensor embedded in a smartphone for the tracking and visualization of equipment locations, which are in turn used for the estimation and simulation of cycle times and production rates of ongoing earthwork. This approach is implemented into a digital platform enabling real-time data collection and simulation, particularly in a 2D (e.g., maps) or 3D (e.g., point clouds) virtual environment where the spatial and temporal flows of trucks are visualized. In the case study, the digital platform is applied for an earthmoving operation at the site development work of commercial factories. The results demonstrate that the production rates of various equipment usage scenarios (e.g., the different numbers of trucks) can be estimated through simulation, and then, the optimal number of tucks for the equipment fleet can be determined, thus supporting the practical potential of real-time sensing and simulation for onsite equipment management.

BIM Based Automated Planning and Operation System for Earthwork Equipment (BIM 기반 토공 장비 계획 및 운영 자동화 시스템)

  • Kim, Jeong-Hwan;Jang, Jun-Hyun;Min, Ji-Hong;Seo, Jong-Won
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2011.04a
    • /
    • pp.375-378
    • /
    • 2011
  • 건설공사에서 토공사가 차지하는 비중은 타공종에 비하여 높다. 즉 건설공사의 생산성을 향상시키기 위하여 토공사를 중점적으로 관리하는 일은 매우 중요하다고 할 수 있다. 그러나 현재의 토공 시스템은 굴삭 조종자와 현장 계획 관리자의 경험적 지식에만 의지하여 토공 계획을 수립하고 있는 실정이며, 또한 노동 집약적 토공작업의 한계를 벗어나지 못하는 현실로 인하여 토공사를 관리함에 어려움이 있다. 이러한 당면 과제를 극복하고자 BIM 기반의 토공 시스템에 대하여 소개하고자 한다. 본 논문에서는 굴삭 장비와 연계하는 토공 계획과 운영 자동화 시스템에 대하여 주로 다루게 된다. 굴삭 작업 계획 생성 시스템, 장비 조종 인터페이스, 웹 기반 Project Management Information System(PMIS)이 개발되는 과정에서 적용된 BIM 요소기술에 대하여 살펴본다.

  • PDF

A Study on the Improvement of 3D Slope Modeling for BIM Designing Site Construction (택지조성공사 BIM을 위한 비탈면 3차원 모델링 효율화 방안에 관한 연구)

  • Kwon, Yongkyu;Ha, Dahyun;Kim, Jeonghwan;Seo, Joonwon;Shim, Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.4
    • /
    • pp.29-40
    • /
    • 2021
  • Recently, interest in Building Information Modeling (BIM) has increased globally, and 3D modeling is a start for the application of BIM at construction sites. However, while many studies have been conducted on the efficiency of 3D modeling focused on civil facilities, there is a lack of research on the earthwork BIM. In particular, since 3D slope often has complex shapes depending on the ground models, the efficiency method for 3D slope are needed. This study analyzed the interfaces and procedures of other software to find out what functions users need. Then the functions to enter intervals between 3D faces, select multiple ground models, and improve the interface are reflected on the developed system and is able to efficiently perform modeling with only five steps, and reduce the number of clicks and inputs. As a result of conducting the test to verify the efficiency, using the developed system made skilled users complete modeling at least 1.8 times faster and unskilled people at least 2.4 times faster than using other software. This is expected to perform 3D slope modeling more efficiently, as well as to contribute to the activation of future BIM adoption for housing construction projects.

Analysis of Substitutability of 2D Electronic Drawing Using the BIM Model -Focusing on the Electronic Delivery System in Road Field- (BIM 모델을 활용한 2D 전자도면 대체 가능성 분석 -도로분야 전자납품체계를 대상으로-)

  • Seo, Myoung-Bae;Ju, Ki-Beom;Kim, Nam-Gon
    • The Journal of the Korea Contents Association
    • /
    • v.13 no.11
    • /
    • pp.441-450
    • /
    • 2013
  • With the recent increase in BIM orders in civil engineering, project owners are supplied with BIM-based products. Due to the lack of related guidelines, however, and the vague regulations on the creation and level of drawings as well as on the products list, many owners receive BIM-based products along with the existing 2D products. This can lead to task overlapping by designers or contractors and can cause the owners to have more data to maintain. If the existing 2D-based electronic supply system is changed to a BIM ordering system to reduce such a burden, it is necessary to examine the 2D products that can be extracted from or substituted for the BIM model so as to minimize the overlapping products. Therefore, in this study, BIM modeling of road construction projects whose enforcement plan by the Ministry of Land and Transportation has been completed was conducted, and based on the study results, the possibility of extracting 2D drawings from a total of 3,767 drawing items was determined. The results showed that 2,549 drawing items (67%) could be extracted as 2D drawings from the BIM model, and in particular, drawing items related to general connection work, earthwork, and amenities work could be most effectively substituted. The results of this study can be used as the base data for reducing the number of 2D drawings or substituting them in developing a BIM-based product supply system in the future.

Functional Analysis of 4D CAD System and Improvement of Function for Applying Linear Construction Project (4D CAD시스템의 기능분석 및 선형시설물 적용을 위한 기능 개선 방안)

  • Kim, Hyeon-Seoug;Kang, Leen-Seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.9
    • /
    • pp.269-278
    • /
    • 2018
  • In Korea, BIM technology is applied mainly to building construction projects, but is expected to be applied rapidly to civil engineering projects because the government is currently considering the mandatory application of BIM for infrastructure facilities. Because the infrastructure project is processed in a horizontal work area, the application of BIM technology is more useful in the schedule management of the construction phase than the interference management of the design phase. The 4D CAD system is a typical BIM technology applied to the schedule management in the construction phase, but the application to the actual project is limited due to the lack of practical functions. This study examined the functions of four representative 4D CAD systems commercialized so that the selection criterion can be provided according to the characteristics of the project, and suggests that the functions that should be improved to have practicability. As a result of functional analysis, the application characteristics of each system were analyzed and the user convenience was suggested. In addition, a linear 4D simulation methodology was developed to improve the functions applicable to civil engineering projects, and ways to improve the utilization of the infrastructure projects as the construction phase BIM were suggested. In railway and road construction projects, most activities, such as earthwork, bridges, and tunnels proceed along the distance axis in a horizontal space. Therefore, a linear 4D simulation method, in which an activity is expressed along a distance axis, can be more practically useful rather than a simple 4D simulation method with a Gantt chart.

Factors of Selecting Temporary Road Positions for the Optimal Path of Earthwork Equipment in Road Constructions (도로공사에서 토공장비 최적 이동을 위한 가설도로 위치선정 요소)

  • Lee, Dong-Jun;Kim, Sung-Keun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.2
    • /
    • pp.85-94
    • /
    • 2022
  • Construction industry is facing difficult challenges in terms of productivity, manpower, and industrial accidents. Currently, along with the 4th Industrial Revolution, various high-tech technologies are emerging, and efforts are being made to solve the problem by applying the technologies related to the 4th Industrial Revolution to the construction industry. As part of these efforts, research is being conducted to develop a construction equipment control system to increase productivity and safety at earthworks sites where many and various types of construction equipment are involved, and the system needs a function to increase productivity by optimizing the moving path of construction equipment. In the case of trucks, the location of the temporary road must be optimized in order to optimize the path of movement in the construction site. However, only matters related to the quality standard of temporary roads have been suggested so far, and there is no standardized process for efficiently determining the location of temporary roads. In this paper, the factors and its importance related to the location of the temporary road were identified through field surveys and interviews with experts, and a method for determining the location of the temporary road was presented. It was confirmed that the suggested method through a case study could improve the productivity of earthwork.