Field measurements were carried out in this study to investigate the behavior of cut and cover tunnel such as the distribution and the magnitude of the earth pressure during back fill process of the ground material. Three kinds of measuring instruments, such as the earth pressure load cell, the concrete strain gauge and the reinforcing bar meter of embedded type in concrete structure were installed and measured. Earth pressure load cells, installed after construction of the tunnel lining, measure the outside forces acting on the tunnel lining with radial directions. Three load cells were installed at the crown, the right and the left shoulder of the tunnel, respectively. Three sets of reinforcing bar meter were installed in the double reinforcements of the tunnel lining and their locations were the same with the position of the earth pressure load cells. Concrete strain gauge was installed only one site of the upper compressive part at the tunnel crown. Based on the measuring results in the field, the deformation and the earth pressure acting on the tunnel lining were investigated with the back fill process of the ground material. Considerations on the validity of the measuring results were paid. For the analysis of measurements, after dividing back fill process into three steps, various factors which affect on the behavior of tunnel lining were investigated at each step.
To study the influences of tunneling on the earth pressure and ground settlement when the tunnel passes through the adjacent underground retaining structure, 30 two-dimensional model tests were carried out taking into account the ratios of tunnel excavation depth (H) to lateral width (w), excavation width (B), and excavation distance using a custom-made test device and an analogical soil. Tunnel crossing adjacent existing retaining structure (TCE) and tunnel crossing adjacent newly-built retaining structure (TCN) were simulated and the earth pressure variations and ground settlement distribution during excavation were analyzed. For TCE condition, the earth pressure increments, maximum ground settlement and the curvature of the ground settlement curve are negatively related to H/B, but positively related to H/s and H/w. For TCN condition, most trends are consistent with TCE except that the earth pressure increments and the curvature of ground settlement curve are negatively related to H/w. The maximum ground settlement is larger than that observed in tunnel crossing the existing underground structure. This study provides an assessment basis for the design and construction under confined space conditions.
Recently, the danger of fine dust has emerged worldwide. In general, fine dust refers to particulate matter less than 10㎛ and ultrafine dust less than 2.5㎛, and according to the announcement by HEI (Health Impact Research Institute) in 2015, the concentration of ultrafine dust in Korea is the second highest among OECD member countries. It was investigated. In this study, an experiment was conducted to analyze how the diatomaceous earth substitution rate affects the strength characteristics of the permeable block. As the replacement rate of diatomaceous earth increased, the strength decreased. The reason why the strength decreases with the use of diatomaceous earth is that the strength of the hardened body decreases as the structure of the hardened body becomes less dense as the amount of diatomaceous earth increases, and the reason that the strength decreases as the replacement rate of diatomaceous earth increases is the reason for the absorption performance of diatomaceous earth. Therefore, it is judged that a void was generated inside the hardened body while water was absorbed and then evaporated or discharged in the matrix, and accordingly, the strength decreased.
대형 댐 및 대심도 지하공간 개발에서 많이 시행되는 암반 그라우팅은 기초지반의 누수를 방지하여 안정성을 향상시키고 추가적인 재해를 방지하기 위해 사용되는 중요한 공종 중 하나이다. 대부분의 암반 그라우팅은 수리지질 및 암반공학적 지수들(RQD, Q-value, GSI, Js, Ap, Lu, SPI, and K)에 의해 영향을 받는다. 따라서, 안전하고 적절한 그라우팅 설계 및 시공을 위해서는 지질학자들의 정확한 기초 암반의 분석과 적절한 그라우팅 계획 수립이 필요하다. 해외의 경우 기초 암반의 수리지질 및 암반공학적 특성 분석과 그라우트 주입량(grout take, GT) 예측에 대한 연구가 활발히 이루어지고 있으며, 주로 댐의 기초지반 분야에서 많은 연구가 수행되었다. 하지만, 국내의 경우 그라우트 주입재료 및 시공관리 기법에 대한 연구는 많이 수행되었으나 암반의 수리지질 및 암반공학적 특성을 고려한 암반 그라우팅 공법에 대한 연구는 미흡한 실정이다. 이에 본 리뷰에서는 암반 그라우팅 계획시 중요한 수리지질 및 암반공학적 지수들(RQD, Q-value, GSI, Js, Ap, Lu, SPI, and K)과 그라우트 주입량의 상관성 분석을 진행한 해외 연구 사례를 파악하고 국내의 암반 그라우팅 관련 연구의 발전방향을 제시하였다.
얼음골 주변의 지표면 변화에 따른 중규모 대기순환장에 미치는 효과를 보기위하여 수치실험을 실시하였다. 얼음골 남북 경사면에서 발생하는 순환장은 지형과 단파복사에 의한 영향으로 다르게 나타나며, 비대칭을 이룬다. 그리고 이러한 비대칭은 18시까지 계속된다. 야간의 경우, 도로건설에 따른 대기순환장의 차이는 크지 않다. 이것은 주간 단파 복사에 의한 현열플럭스가 감소하며, 현열플럭스외의 다른 요소는 크게 영향을 미치지 않는다는 것을 의미한다. 도로의 건설은 현열플러스의 증가와 관련되고, 주간의 경우, 지형에 의한 곡풍과 결합하여 도로가 없는 경우에 비하여 상승류가 강하여진다. 최대풍속은 4.67 m/s이다. 그리고 이때 도로의 위치역시 주요한 요인으로 작용한다.
최근 도심지에서 건물 및 지하철 건설시 보다 효율적인 지하공간을 활용하기 위하여 깊은 굴착이 많이 실시되고 있다. 이와 같은 지하굴착공사에 있어서 앵커지지 굴착공법은 넘은 작업공간을 확보할 수 있는 이점이 있으므로 많이 사용되고 있다. 본 논문의 목적은 27개 사례현장으로부터 얻은 현장계측결과를 토대로 앵커지지 흙막이벽에 작용하는 측방토압산정식을 마련하는데 있다. 앵커축력은 흙막이벽을 지지하기 위해 앵커두부에 부착된 하중계로 측정하였으며 흙막이벽의 수평변위는 홀막이벽 배면에 설치된 경사계로 측정하였다. 앵커축력 및 흙막이벽 수평변위로 부터 산정된 앵커지지 홀막이벽에 작용하는 측방토압은 사다리들 분포를 나타내고 있었다. 이와 같은 측정토압과 여러 경험식으로 주어진 경험토압사이에는 약간의 차이가 있었다. 따라서 앵커지지 흙막이벽에 작용하는 측방토압은 종래 사용되고 있는 경험식에 약간의 수정을 가한 후 사용함이 바람직하다.
흙막이 구조물은 한정된 부지의 효율적인 활용 차원에서 고층건물, 개착식 지하철, 지하상가 등의 건설을 위해 시공되는 가설구조물이다. 최근 들어, 교량, 터널, 도로 등의 설계와 시공에 관련된 표준화 작업과 DB화 작업이 활발히 이루어지고 있다. 이러한 구조물의 설계와 시공에 관련된 각종 통계 자료가 축적되고 여러 문제점들이 분석되어 실제 설계 시공에 많이 반영되고 있다. 그러나, 건설현장에서 많이 설계 시공이 되는 흙막이 구조물과 관련해서는 DB화 작업이 전무할 뿐만 아니라 이를 통한 활용이 이루어지지 않고 있다. 따라서, 본 논문은 흙막이 구조물에 관련된 100개 현장의 설계와 시공에 대한 지적사항들을 분류하였으며, 이 자료를 기초로 하여, 분류체계를 구성하였으며, 흙막이 구조물의 설계와 시공에 관련된 중요 고려사항을 DB 프로그램으로 개발하였다.
건설공사의 초기 단계인 토공사의 경우 현장 토공계획에 부합하는 다양한 건설장비를 활용하여 수행된다. 이 경우 짧은 시간에 다종의 건설기계장비가 투입되며 많든 공사비가 소요되는 만큼 어느 공종보다도 토공관리자의 합리적인 계획 수립이 요구된다. 그러나 대부분의 경우 경험과 직관을 바탕으로 토공장비계획이 수립되어 공정관리 및 원가절감 차원에서 적절한지 검증이 어려우며, 계획수립에 요구되는 고려조건이 변경될 때마다 시간과 인력을 투입해야하는 실정이다. 이에 본 연구에서는 시스템 다이내믹스 기법을 활용하여 기계화 토공장비의 굴삭과 적재 및 운반단계를 대상으로 토공장비의 적정 조합모형을 구축한다. 연구의 결과로 도출되는 토공장비의 적정 조합모형은 토공계획을 담당하는 관리자가 토공장비계획을 함에 있어 짧은 시간에 합리적인 판단을 하도록 지원해줄 것으로 기대된다.
Journal of Construction Engineering and Project Management
/
제3권3호
/
pp.10-16
/
2013
The annual expenditure on diesel oil and heavy oil in the construction sector is the second largest among all industrial sectors. According to the greenhouse reduction scheme of Korean Government, construction sector targeted 7.1% reduction by 2020. Although this target is not higher than other industrial sectors, it is not easy to achieve the reduction target without radical advance in technology, which cannot be expected to happen soon, considering the conservative characteristics of construction industry. Most researches on environmental issues focus on the issues related to energy saving matters during material production stage or maintenance stage, such as heating and insulation, and few deal with the issues directly related to the energy use in the construction sites. This research regards the operation of equipment for the on-site construction processes as a system and attempts to model the energy use processes related to the activities in construction sites, and provides simulation results of earth excavation and hauling processes. The result of this research is expected to aid construction planners estimating the time-based patterns of energy use and assessing greenhouse gas emission and to help selecting more energy efficient alternatives at the planning stage.
The 5th International Conference on Construction Engineering and Project Management
/
pp.287-293
/
2013
The annual expenditure on diesel oil and heavy oil in the construction sector is the second largest among all industrial sectors. According to the greenhouse reduction scheme of Korean Government, construction sector targeted 7.1% reduction by 2020. Although this target is not higher than other industrial sectors, it is not easy to achieve the reduction target without radical advance in technology, which cannot be expected to happen soon, considering the conservative characteristics of construction industry. Most researches on environmental issues focus on the issues related to energy saving matters during material production stage or maintenance stage, such as heating and insulation, and few deal with the issues directly related to the energy use in the construction sites. This research regards the operation of equipment for the on-site construction processes as a system and attempts to model the energy use processes related to the activities in construction sites, and provides simulation results of earth excavation and hauling processes. The result of this research is expected to aid construction planners estimating the time-based patterns of energy use and assessing greenhouse gas emission and to help selecting more energy efficient alternatives at the planning stage.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.