수리온헬기 개발사업에서 시스템 엔지니어링 및 사업성과관리 기법 적용 사례연구 (A Case Study of SE and EVMS Techniques Application on Surion Helicopter R&D Program)

  • 변형균;이상우
    • 시스템엔지니어링학술지
    • /
    • 제8권1호
    • /
    • pp.51-62
    • /
    • 2012
  • The System Engineering(SE) and the Earned Value Management System(EVMS), as parts of the scientific project management methodology, have been applied to Surion Helicopter R&D Program. The concept and application process of SE methodology, requirements management and applications output by DOORS program are described in this study. The concept and application process of EVMS, analysis results of schedule/cost variance for Surion RF equipment are also discussed in this study. Though the Surion R&D program is still on-going, it is found that the measures of effectiveness of SE and EVMS applications are verified.

Earned Value 기반 프로젝트 관리체계 및 사례연구 (Earned Value based Construction Project Control System)

  • 이유섭;조창연;오규환;김정훈
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2002년도 학술대회지
    • /
    • pp.123-130
    • /
    • 2002
  • 건설공사 관리프로세스 및 관리체계는 건설공사를 성공적으로 수행하는데 필수적인 요소이다. 이러한 공사관리체계는 건설공사를 계획${\cdot}$관리함에 있어서 일정, 비용, 성과측정, 현금흐름(cash flow)예측 등의 업무체계가 통합 또는 연계될 때, 효과적인 관리도구로 활용할 수 있으며, 이는 건설공사에 대한 정확하고 신속한 의사결정을 도모하고 관리의 효율성을 증대시킬 수 있다. 이를 위해 우리나라 건설업계에서는 건설공사의 수행과정을 효과적으로 계획하고 통제, 관리한 수 있도록 업무프로세스를 혁신하고, 이를 지원하는 공사관리시스템의 구축에 많은 시간과 노력을 기울이고 있다. 본 연구에서는 건설공사를 효과적으로 계획, 관리하여 업무프로세스의 투명성을 확보하고 비용효과를 증대시키기 위한 방안의 일환으로 구축되고 있는 공사관리시스템의 개발 동향과 기능적 특징을 비교 분석하고, 구축된 공사관리시스템이 유효하게 기능할 수 있도록 하기위한 현안과제와 대응방안을 제시하고 있다.

  • PDF

국방무기체계 연구개발사업의 EVMS 적용실태 분석 (Analysis of EVMS Implementation to Korean Defence R&D Project)

  • 민원배;강석중;송운호
    • 한국정보통신학회논문지
    • /
    • 제14권1호
    • /
    • pp.242-250
    • /
    • 2010
  • EVMS(Earned Value Management System)는 사업을 관리하는 정부나 사업을 수행하는 업체의 관리자들이 비용과 일정을 주기적으로 추적함으로써 현재의 사업진행 상태를 파악하고 미래를 예측할 수 있는 관리기법이다. 이 관리기법은 미국, 호주 등에서 국방연구개발 사업에 의무적으로 적용해오고 있으며, 그 효율성이 이미 입증된 기법이다. 그러나 외국에서 수행하고 있는 EVMS를 그대로 우리나라에 도입하는 것은 환경적 차이로 인해 많은 문제점을 가지고 있기 때문에 우리나라에 환경에 적합한 EVMS 적용을 위해 연구를 꾸준히 수행하고 있다. 본 논문에서는 먼저 EVMS에 대한 개념을 먼저 고찰 해보고, 저자가 직접 관리하고 있는 차기경구난차량 연구개발사업에 적용한 EVMS 적용실태 분석을 통해 문제점을 도출하고자 한다.

산출내역서.공정 통합관리 모형 구축에 관한 연구 (Work Management Model to Integrate Schedule and Bill of Quantit)

  • 박홍태;박찬정
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2002년도 학술.기술논문발표회
    • /
    • pp.123-131
    • /
    • 2002
  • Recently our government operates earned value management system (EVMS) for improving work management system of the construction projects over specific scale. The EVMS is based on the integrated management between construction cost and schedule, the existing systems, however, are focused on the cost management by using wort quantity. This study suggests a work management mode1 to integrate construction cost with activity information. The model introduces a work task concept as a tool that can connect construction cost to activity information. The suggested model in this study is verified by using actual data for the applicability to practical construction projects.

  • PDF

산출내역서.공정 통합관리 모형 구축에 관한 연구 (Work Management Model to Integrate Schedule and Bill of Quantity)

  • 박홍태;박찬정
    • 한국건축시공학회지
    • /
    • 제2권4호
    • /
    • pp.153-161
    • /
    • 2002
  • Recently our government operates earned value management system (EVMS) for improving work management system of the construction projects over specific scale. The EVMS is based on the integrated management between construction cost and schedule. the existing systems, however, are focused on the cost management by using work quantity. This study suggests a work management model to integrate construction cost with activity information. The model introduces a work task concept as a tool that can connect construction rest to activity information. The suggested model in this study is verified by using actual data for the applicability to practical construction projects.

추계적 EVMS 기반 예비비 산정 방법론 (Contingency Estimation Method based on Stochastic Earned Value Management System)

  • 곽한성;최병윤;이창용;이동은
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 춘계 학술논문 발표대회
    • /
    • pp.72-73
    • /
    • 2018
  • The accuracy of contingency estimation plays an important role for dealing with the uncertainty of the financial success of construction project. Its' estimation may be used for various purposes such as schedule control, emergency resolve, and quality expense, etc. This paper presents a contingency estimation method which is schedule control specific. The method 1) implements stochastic EVMS, 2) detects a specific timing for schedule compression, 3) identifies an optimal strategy for shortening planned schedule, 4) finds a probability density function (PDF) of project cost overrun, and 5) estimates the optimal contingency cost based on the level of confidence. The method facilitates expeditious decisions involved in project budgeting. The validity of the method is confirmed by performing test case.

  • PDF

Project Management Process를 바탕으로 한 EVMS 실무적용 프로세스 (EVMS Application Process based on Project Management Processes)

  • 백성민;안병주;김재준;공건영
    • 한국건설관리학회논문집
    • /
    • 제3권2호
    • /
    • pp.59-66
    • /
    • 2002
  • EVMS(Earned Value Management System)가 공정과 연계하여 공사비를 관리할 수 있는 적절한 수단으로 대두되고, EVMS 적용의 제도화 계획이 발표된 이후 수많은 건설현장과 학계에서는 EVMS의 국내 도입 및 활성화를 위한 연구와 국내 건설 환경을 고려하는 EVMS 모델 및 이행 프로세스에 대한 연구가 진행되고 있다. 본 연구는 EVMS process에 관한 연구로서, 기존 EVMS Process에 관한 연구의 문제점을 도출하여 그 대안으로 PMBOK의 Project Management Process글 제시하고, EVMS 적용에 알맞도록 수정하여 그것을 기반으로 새로운 EVMS의 실무적용 프로세스를 제시하고자 하였다. 본 연구를 통해 EVMS 프로세스에 관한 연구의 새로운 방향을 제시하고자 하며, 나아가 국내건설공사의 특수성을 반영한 공정-공사비 통합관리체계의 틀을 마련하고자 한다.

공정-공사비 통합 프로세스 개선을 통한 대단지 아파트 건설공사의 계획기성 산출 및 관리 (A Study on the Process Improvement of Budgeted Cost of Earned Value Management in Multiple Apartment Project)

  • 양용철;김상희;김재준
    • 한국건설관리학회논문집
    • /
    • 제4권4호
    • /
    • pp.123-136
    • /
    • 2003
  • 아파트 공사에서 계획기성은 전체 사업단계에 걸쳐 공사기간 산정, 중도금 납부일정, 사업손익분석, 기성지급, 계획대비 실적비교 관리 등에 활용되므로, 다수 사업 참여자간의 이해와 사업의 성공에 지속적으로 영향을 미치는 핵심적인 관리요소이다. 그러나 대단지 아파트 공사에서는 다수건물 동시 시공으로 인한 공정 액티비티 과다발생으로 인하여 공정표를 작성하고 자원을 분개하여 계획기성을 정확하게 산출하는데 어려움을 겪고 있는 실정이다 본 연구에서는 실태조사를 통하여 기존의 문제점과 원인을 파악하고 계획기성 산출의 프로세스를 개선을 통하여 계획기성을 신속$\cdot$정확$\cdot$체계적으로 산출하기 위한 개선방향을 제시한다.

액티비티 기반의 EVM - PMIS 통합모델 구축 (The Establishment of an Activity-Based EVM - PMIS Integration Model)

  • 나광태;강병희
    • 한국건축시공학회지
    • /
    • 제10권1호
    • /
    • pp.199-212
    • /
    • 2010
  • 국내 건설산업에 있어서 기술과 정보의 기반구조를 확립하기 위하여 몇몇 건설정보관련 법규가 제도화되었다. 그러나 국내 건설정보 분류체계, 공정 공사비 통합관리(EVM), 프로젝트관리 정보시스템(PMIS)은 주요한 문제점을 내포하고 있다. 특히 현행 PMIS의 기능은 시공자 위주의 시스템으로 되어 있고, EVM이 적용되지 않아 발주자를 위한 보고, 분석, 예측기능이 매우 취약하다. 더욱이 EVM과 PMIS가 서로 분리된 체계로 운영되고 있어 발주자가 실시간으로 공정 및 공사비 정보를 확인할 수 없다. 본 연구의 목적은 PMIS가 EVM기능을 제공하고 사업참여자들이 제반정보를 공유할 수 있도록 WBS 구축방안과 EVM - PMIS 통합모델을 제안하여, E-비즈니스 업무환경하에서 PMIS를 효율적으로 운용할 수 있는 틀(framework)을 제공하는 것이다. EVM - PMIS 통합의 핵심은 EVM과 PMIS가 액티비티 기반의 동일한 운영체계를 갖는 것이다. 통합의 원리는 액티비티의 정보항목(field)을 PMIS의 공정 및 공사비관리 기능을 위한 하위모듈을 구성하는 관계형 데이터베이스 테이블(table)의 항목과 연계시키는 것이다. 따라서 액티비티의 계획공사비(PA), 달성공사비(EV), 실투입비(AC), 공정편차(SV), 공정수행지수(SPI), 공사비편차(CV), 공사비지출지수(CPI)는 PMIS의 공정 및 공사비 하위모듈을 위한 데이터베이스 테이블의 항목으로 연계된다.

CMMI기반의 XP를 위한 3단계 EVM 적용 지침 개발 (Development of 3 layer EVM(Earned Value Management) Guideline for XP(eXtreme programming) based on CMMI)

  • 정미서;한혁수
    • 인터넷정보학회논문지
    • /
    • 제9권6호
    • /
    • pp.155-163
    • /
    • 2008
  • 소프트웨어 프로젝트가 착수 후 성공적으로 종료되기 위해서는, 계획에 따라 프로젝트가 잘 진행이 되고 있는지의 여부를 주기적으로 검토하고 만약 문제가 있을 경우에는 적절한 시정 조치를 취하는 프로젝트 통제활동이 필수적이다. 프로젝트 통제활동은 주간회의나 마일스톤 회의 등과 같이 주기적으로 수행되는 보고회의를 통해 이루어지는데, 이때 프로젝트 관리자는 일정, 비용, 작업성과 등을 검토해 봄으로써 프로젝트의 진행 상태를 파악할 수 있다. 프로젝트 통제활동을 지원하는 방법으로 가장 많이 쓰이고 있는 EVM(Earned Value Management)은 일정과 작업성과에 관한 측정치를 비용으로 산정하여, 일정, 비용, 작업성과를 하나의 그래프에 표현하는 방법이다. 프로젝트 관리자는 EVM을 통하여 비용이라는 하나의 단위로 프로젝트의 작업 성취도와 진도율을 정량적으로 관리 할 수 있다. EVM은 전체작업을 단위작업으로 나누어 각 단위작업의 작업 기간과 작업량을 비용으로 환산하여 관리하는데, 주로 프로젝트의 범위가 초반에 정의되고 단위작업의 크기가 큰 경우에 적용이 쉽고 관리가 편하다. 이러한 이유로 폭포수(Waterfall) 기반의 프로젝트에 주로 적용되고 있다. 그러나 XP(eXtreme Programming)기반의 프로젝트에서는 요구사항이 프로젝트 초반에 완벽히 정의되기가 어렵고 단위작업의 크기가 작아, 프로젝트 초반에는 상위레벨 수준으로만 범위가 정의 되고 반복이 진행되면서 점점 상세한 범위가 정의되기 때문에 EVM이 활용되고 있지 않다. 따라서 본 논문에서는 XP에 EVM을 적용할 수 있는 방안인 3단계(Layer) EVM을 제시하고, 조직이 이를 구축하도록 지원하기 위해 CMMI(Capability Maturity Model Integration)의 PMC(Project Monitoring and Control) 프로세스 영역을 기반으로 프로세스를 정립하고, 그에 따른 적용 지침을 개발하였다.

  • PDF