Korean Journal of Construction Engineering and Management
/
v.7
no.6
/
pp.165-174
/
2006
Recently, the architecture remodeling is rising as new alternative for activating the construction market as the interest toward life cycle of buildings has increased. But the reality is that current remodeling business is suffering various types of difficulties in its performance due to the absence of general management technology and factor technology in systematic performance procedure or evaluation, etc toward remodeling effect, evaluation on performance, imperfect system for reflecting user requirements and remodeling life cycle ; planning, $feasibility ^{\circ}\hat{E}designing^{\circ}\hat{E}construction^{\circ}\hat{E}management$ along with lack of overall understanding on remodeling. Accordingly, this research has attempted to search for an effective management method through overall understanding in project performance by presenting work procedure of remodeling project and analysis items for decision making, etc centered on early planning stage out of three stages called planning, designing and construction.
Journal of Korean Society of Industrial and Systems Engineering
/
v.39
no.1
/
pp.37-46
/
2016
Quality has been a key issue to manufacturers. Many distinguished scholars have defined quality with profound insight. Korean firms struggle to make better products to fulfil requirements and satisfy customers. Korean industries have implemented quality management from Japan in early 70s. Statistical quality control, QCC (Quality Control Circle), and total quality management have also been introduced in succession. Chief executive officers, managers, and field employees have been aware of the importance of quality since then. This quality movement force workers to improve quality. They have to maintain the quality of products and compete with foreign products. Korean industries were able to compete with foreign industries in price. However, Korean firms now have to compete in quality as well as price. ISO (International Organization for Standardization) was established and industries around world have started to implement standardized systems depending on their need. ISO 9000 has continuously been revised and firms around world started to register a ISO 9000 certificate. Today's quality competitiveness gets more deeply involved. KSA (Korean Standard Association) have launched QCAS (Quality Competitiveness Assessment System) since 1997. Up until now recent status of QCAS have been reported but the characteristics of QCAS results have not been analyzed. In this article we examine the QCAS results of 41 firms in 2014. QCAS consisted of 13 subsections : strategy and management system, organization culture and development of human resource, information management, quality system, customer satisfaction, management achievement, TPM, logistics, product development and technology, PL, QCC, SQC/SPC, and reliability. We performed one way ANOVA to discover the difference among the levels of firm size, business type, and quality hall of fame using the total scores of 13 subsections resulted from QCAS. We also analyzed the scores of 13 individual subsections of QCAS to see if there is any differences based on firm size and business type. We interpret the results and implication of analysis and finally draw a conclusion.
Journal of the Korean Society of Marine Environment & Safety
/
v.17
no.3
/
pp.283-289
/
2011
As leisure boats become large-scaled and high value-added, their design requirements gradually get more complicated and accordingly their manufacturing processes get more complicated than those of existing ones. Leisure boat builders overseas make efforts to overcome this circumstance by establishing a 3-D model-based design system which is based on the concept of PLM. On the other hand, Korean shipbuilders still remain in the development process of traditional leisure boats which are mainly based on 2-D drawings. There have been some efforts made to have the 3-D model-based design system; however, they belong to a very early stage. This study carried out initial research to apply DMU technology to the development process of leisure boats. It established the design process based on a DMU model and proved its usefulness through a case study on the design of 40-ft class aluminum leisure boats.
This paper proposes an effective method to create logically consistent and structured requirement model by applying consistency control approach of the formal method to the use-case modeling. This method integrates the multi-perspective scattered requirement segments that may overlap and conflict each other into a structured requirement model. The model structure can be analyzed based on context goal and concerned area overlap analysis. The model consistency can be achieved by using specification overlap-based consistency checking method as an integration vehicle. An experimental application to case study shows that the Proposed method can successfully identify requirement overlaps and inconsistency. It can also transfer multi-viewpoint requirement segments into a consistently integrated use-case model to clarify software behaviors and functionality This method helps users to enhance capability to identify specification inconsistency in the use-case modeling at the early stage of software engineering development. The proposed approach can also facilitate communication between users and developers to ensure customer satisfaction.
Journal of the Korea Institute of Military Science and Technology
/
v.19
no.1
/
pp.35-42
/
2016
Modern aircraft is facing the increase of power demands and thermal challenges. In accordance with the application of more electric technology and advanced mission requirement, aircraft system requires increase of power generation and it cause increase of internal heat generation. Simultaneously, restrictions have significantly been imposed to the thermal management system. Modern aircraft must maintain low radar observability and infra-red signature. In addition, new composite aircraft skins have reduced the amount of heat that can be rejected to the environment. The combination of these characteristics has increased the challenges faced by thermal management. In order to mitigate the thermal challenges, the concept of system level thermal management should be applied and new modeling and simulation tools need to be developed. To develop and utilize system level thermal management technology, three key points are considered. Firstly, the performance changes of subsystems and components must be assessed at an integrated thermal system. It is because that each subsystem and component interacts with other subsystems or components and it can directly effects on overall system performance. Secondly, system level thermal management requirements and solutions must be evaluated early in conceptual design process as vehicle and propulsion system configuration decisions are being made. Finally, new component level thermal management technologies must focus on reducing heat generation and increasing the availability of heat sinks.
기존의 오류 제어 방법들은 실시간 특성과 신축적인 신뢰성을 가지는 멀티미디어 통신 응용의 특징을 충분히 반영하지 못하고 있다. 본 연구는 기존의 재전송을 기반으로 하는 방법에 두 가지 기법을 추가하여 이 문제에 접근하였다. 첫째, 실시간 데이타의 마감 시간을 고려하여 미리 재전송을 실시하는 사전 재전송과 시간적으로 불가능하다고 판단될 때 복구를 포기하는 재전송 포기를 통한 적시 재전송 기법이다. 둘째, 요구되는 신뢰성에 근접하도록 오류가 많이 발생하였을 때만 재전송을 하는 선택적 오류 제어 기법이다. 본 연구는 두 기법을 적용한 오류 제어 프로토콜을 구현하고 네트워크 환경을 바꾸어 가며 성능을 검사하였다. 실험 결과, 제안된 오류 제어 방법은 전체적인 오류 제어 부하는 감소시키면서 오류 복구율을 높인다는 점을 확인하였다.Abstract The current error control schemes do not fit well to the characteristics of multimedia communications: real-time transmission and flexible reliability requirements. This research proposes a new error control scheme, which extends the retransmission-based error control with the following two mechanisms. First, error recovery is performed in two timely fashions: one is retransmission in advance where a retransmission is performed early enough for the deadline if an error is suspected, and the other is retransmission abort where a retransmission is given up if its recovery within the deadline seems to be impossible. Second, error control is selectively performed only when an actual error rate approaches to the threshold on a given reliability requirement. The proposed scheme has been implemented and experimented in various network environments. The performance results show that it has lower control overhead and higher error recovery than the existing schemes.
Journal of the Architectural Institute of Korea Planning & Design
/
v.36
no.3
/
pp.31-38
/
2020
The purpose of this study is to compare between professionalism in medical field(doctor) and architectural design field(architect) in Korea through synchronic and diachronic analysis, with basic requirement of expertise and systemicity, attitude requirement of the publicness, and structural requirement of exclusiveness and autonomy. The medical professionalism adapted by Korean government in the early period of modernization evolved from Western's professional expertise is highly divided as economy grew and society changed. In comparison, architecture was divided into architecture, urbanism, landscape, and interior architecture. Additionally, architectural field was subdivided with architectural design, engineering, construction, structure, and facilities, but architectural design focused on generalized education and practice system. From the systematical point of view, architectural design field has changed profoundly from architectural engineering as 5 year undergraduate educational system was introduced with Korean architectural accreditation. The publicness is approved through health service in medical field and safety and the public domain in architectural design field, but in reality the professionals are viewed as economic interest groups. Hence, the professionalism in both fields is required to reinforce ideology and ethics, and to practice concrete measures for publicness. Compared with the unified organization of medical field, architectural design professionalism faces various difficulties in unifying the organization, such as internal competition caused by tightened architect's requirements, along with external problems from architectural design permission demands of construction companies. In medical and architectural design professionalism, with the appearance of consumerism and stricter governmental regulations, the autonomy is weakened. From the result of comparative analysis, Korean medical field became extremely subdivided and specialized in each department, therefore integration of each disease and establishment of centers are proposed as solutions. By contrast, the reinforcement of expertise in architectural design professionalism might be necessary to strengthen autonomy caused by governmental restriction, and to form architectural culture and secure public architecture.
International conference on construction engineering and project management
/
2011.02a
/
pp.561-566
/
2011
In general, the early stage of urban renewal such as preparing a master plan and processing administrative works including planning permission are conducted by local governments in Korea. The local governments need to review the status of projects that are undergone in other local governments' territories. However, no integrated information system to manage information to this end at the level of nation exists in Korea. If the system would be developed, it may support central government to obtain information on required resources at the national level. In addition, local governments can gain guidance on the process and recognize potential problematic situations from others experience. The system should include functions to collect data on project summary, cost and schedule of projects according to local governments. The expected effects from using the information system are as following. First, information generated from project practice become more credible on account of management at the national level. Because the authorized party such as system administrative agents of governments are responsible for collecting and managing data. Second, the unified information system with no regard to the place where projects progresses reduces the efforts for accumulating reference data for aiding local governments decision making by providing appropriate information timely. Also, enhanced information accessibility for stakeholders make the project process clear. Finally, oversight management is enforced with visualization technology adopted in the system, presenting master plan and mass model including information on usage by floors and progressing information graphically. Ultimately, potential challenges can be anticipated by considering records accumulated from other local governments' projects. This paper presents concept, functionalities, and architecture of information system enabling to manage data from individual projects and aggregate those for oversight management for local and central governments. As a part of systems analysis, general requirements of briefing system for governments and necessary data fields to this end are identified.
The key features of 5G mobile communications recently commercialized can be represented by High Data Rate, Connection Density and Low Latency, of which the features most distinct from the existing 4G will be low Latency, which will be the foundation for various new service offerings. AR and self-driving technologies are being considered as services that utilize these features, and 5G Network Latency is also being discussed in related standards. However, it is true that the discussion of E2E Latency from a service perspective is much lacking. The final goal to achieve low Latency at 5G is to achieve 1ms of air interface based on RTD, which can be done through Ultra-reliable Low Latency Communications (URLLC) through Rel-16 in early 20 years, and further network parity through Mobile Edge Computing (MEC) is also being studied. In addition to 5G network-related factors, the overall 5G E2E Latency also includes link/equipment Latency on the path between the 5G network and the IDC server for service delivery, and the Processing Latency for service processing within the mobile app and server. Meanwhile, it is also necessary to study detailed service requirements by separating Latency for initial setup of service and Latency for continuous service. In this paper, the following three factors were reviewed for initial setup of service. First, the experiment and analysis presented the impact on Latency on the Latency in the case of 1 Data Lake Setup, 2 CRDX On/Off for efficient power, and finally 3H/O on Latency. Through this, we expect Low Latency to contribute to the service requirements and planning associated with Latency in the initial setup of the required services.
For economical earthquake resistant design of cable-stayed bridge tower, the use of energy dissipation systems for the earthquake protection of steel structures represents an alternative seismic design method where the tower structure could be constructed to dissipate a large amount of earthquake input energy through inelastic deformations in certain positions, which could be easily retrofitted after damage. The design of energy dissipation systems for bridges could be achieved as the result of two conflicting requirements: no damage under serviceability limit state load condition and maximum dissipation under ultimate limit state load condition. A new concept for cable-stayed bridge tower seismic design that incorporates sacrificial link scheme of low yield point steel horizontal beam is introduced to enable the tower frame structure to remain elastic under large seismic excitation. A nonlinear dynamic analysis for the tower model with the proposed energy dissipation systems is carried out and compared to the response obtained for the tower with its original configuration. The improvement in seismic performance of the tower with supplemental passive energy dissipation system has been measured in terms of the reduction achieved in different response quantities. Obtained results show that the proposed energy dissipation system of low yield point steel seismic link could strongly enhance the seismic performance of the tower structure where the tower and the overall bridge demands are significantly reduced. Low yield point steel seismic link effectively reduces the damage of main structural members under earthquake loading as seismic link yield level decreases due their exceptional behavior as well as its ability to undergo early plastic deformations achieving the concentration of inelastic deformation at tower horizontal beam.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.