• Title/Summary/Keyword: Early Planning Phase

Search Result 68, Processing Time 0.032 seconds

A Wartime/Peacetime OMS/MP Analysis Model for the Submarine Development (잠수함 전.평시 OMS/MP 설정 방법론 연구)

  • Jang, Won-Joon;Kim, Kyoung-Yong;Paik, Soon-Huem
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.14 no.3
    • /
    • pp.432-440
    • /
    • 2011
  • Operational Mode Summary/Mission Profile(OMS/MP) is a document to quantify the operational and maintenance requirements based on the future operational environments and its mission and How to Fight concept in the development of the weapon system. It is important as a key document for the RAM goal setting in the early phase of weapon system development. The paper presents a systematic and practical submarine OMS/MP model processes with a deep analysis of relevant case studies and current status domestic and abroad. Especially, it proposes the unique Scenario Planning and Switch on List techniques with real case studies which have recently performed. The paper will contribute not only the basis of improved requirements for the development of weapon system but also the sustainment of readiness with the enhancement of RAM and reduction of total life cycle cost.

A "Dynamic Form-Finding" Approach to Environmental-Performance Building Design

  • Yao, Jia-Wei;Lin, Yu-Qiong;Zheng, Jing-Yun;Yuan, Philip F.
    • International Journal of High-Rise Buildings
    • /
    • v.7 no.2
    • /
    • pp.145-151
    • /
    • 2018
  • Newly-designed high-rise buildings, both in China and abroad, have demonstrated new innovations from the creative concept to the creative method. from the creative concept to the creative method. At the same time, digital technology has enabled more design freedom in the vertical dimension. "Twisting" has gradually become the morphological choice of many city landmark buildings in recent years. The form seems more likely to be driven by the interaction of aesthetics and structural engineering. Environmental performance is often a secondary consideration; it is typically not simulated until the evaluation phase. Based on the research results of "DigitalFUTURE Shanghai 2017 Workshop - Wind Tunnel Visualization", an approach that can be employed by architects to design environmental-performance buildings during the early stages has been explored. The integration of a dynamic form-finding approach (DFFA) and programming transforms the complex relationship between architecture and environment into a dialogue of computer language and dynamic models. It allows the design to focus on the relationship between morphology and the surrounding environment, and is not limited to the envelope form itself. This new concept of DFFA in this research consists of three elements: 1) architectural form; 2) integration of wind tunnel and dynamic models; and 3) environmental response. The concept of wind tunnel testing integrated with a dynamic model fundamentally abandons the functional definition of the traditional static environment simulation analysis. Instead it is driven by integral environmental performance as the basic starting point of morphological generation.

The Case Study on the Success Factors of Korean Car Sharing Business (한국 차량공유사업의 성공요인 사례분석)

  • Kim, Jiye;Han, Ingoo
    • Knowledge Management Research
    • /
    • v.21 no.3
    • /
    • pp.1-25
    • /
    • 2020
  • This study analyzed key success factors of Korean car-sharing enterprises, Socar and Greencar, and the responsive strategies of Korean car-manufacturing company, Hyundai Motor Group, in the face of emerging sharing economy under the specific economic and regulatory system in Korea. The outcomes of the analysis are as follows. 'Timely market entry' in early startup phase and 'use of external resources' in early growth phase were key success factors common to both Socar and Greencar. However, the differences in the eventual business directions of the two companies also resulted in different key success factors in the expansion phase of their business. For Socar which focused on maintaining its independence and the external growth of B2C business, customer relation marketing and sufficient capital raising were key success factors. For Greencar which became a part of a business group and focused on improving the efficiency of business operations, timely market entry (B2B market) was key success factor. The use of external resources and cooperation with large corporations emerged as key success factors common to both companies in the rapid growth phase. The responsive strategies of the Hyundai Motor Group were collaboration, investment and direct management of DeliveryCar. The short-term goal of the responsive strategy was the operation of test-bed in collaboration with car-sharing company while the mid/long term goal was planning new mobility services by utilizing collected data. Securing opportunities for early market dominance for autonomous car industry was also found to be an important goal.

Thermal Load Simulation Analysis on Model Building Estimating Optimum Heat Source Capacity (최적 열원용량 산정을 위한 모델건물 공조부하 시뮬레이션 분석)

  • Park, Jong-Il;Kim, Se-Hwan;Lee, Sung
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.19 no.6
    • /
    • pp.427-433
    • /
    • 2007
  • Generally, H.V.A.C load capacity in early planning phase can presume with maximum thermal load. Basic data can prove by air conditioning equipment system data analysis at existing building. There are poor and not reliable alternative presentation. In this paper, measured data after use H.V.A.C load calculation K-load program reply choosing standard building and variables simulation. And I founded peak load correlation graph and mode for several kinds of variable and contents of size. I wish that equipment designer is beaconed to produce optimum capacity at building as quantitative through this result.

A Study on the Direction for Developing the Korean PDRI(Project Definition Rating Index) (한국형 PDRI(Project Definition Rating Index)기법 개발 방향)

  • Hong, Sim-Hee;Yu, Jung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.168-169
    • /
    • 2016
  • Risk management at an early stage of projects is known as an effective method expected various benefits. The PDRI(Project Definition Rating Index) by the CII(Construction Industry Institute) is defined project scope for reducing risks. In addition, the PDRI is one of the verified methods for achieving benefits by a risk management. The literature review in Korea about risk management is all about focusing on construction works and the construction phase. Thus, we need to extend the perspective of a project management such as the PDRI. To develop the Korean PDRI, However, we have to consider Korean situations. Therefore, in this study, we analyze some previous studies of PDRI' indexes and its using methods, and suggest the new direction for using PDRI in Korea. This method will enable to improve the scoring method of a project management with PDRI in Korea.

  • PDF

A Study on Information Strategy Development Using Configuration Management in Large-scale Construction Project (형상관리기법을 활용한 대형 프로젝트 정보화 전략개발)

  • Won, Seo Kyung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.66-67
    • /
    • 2018
  • Large-scale construction projects require various license and technologies for the manufacturing and handling processes. Also, the whole life cycle business process management determines the success of the project. Then, the efficiency of the business conducted by stakeholders and their possessed technology should be enhanced in order to strengthen their competitive power. For this reason, many experts pointed out to focus on the improvement of the life cycle process and efficient management. Since it is very important to keep up-to-date data and utilize it for work during the long-term project to reflect changes in the large-scale project, the most important part of the project management in project is information change management. Therefore, the objective of this study is applying configuration management(CM) technique in order to managing change data generated for planning in early phase. The result of this research will certainly assist the large-scale project managers in the development of information change management system.

  • PDF

A Wartime·Peacetime OMS/MP Analysis Model for a Naval Ship and Case Study (함정 전·평시 OMS/MP 설정 방법론 연구 및 사례)

  • Ha, Sungchul;Kook, Jungho
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.15 no.5
    • /
    • pp.660-666
    • /
    • 2012
  • The weapon system is getting more and more expensive, complex and smarter. Therefore, efficiently and effectively, it is important to operate the weapon system. OMS/MP is a document to quantify operational factors like as environment, mission, mode etc. It is important data to perform RAM analysis in early weapon development phase and operate better a weapon system. This paper present a process and framework of OMS/MP for a naval ship with a deep analysis of relevant domestic and abroad case studies. It propose OMS/MP analysis framework based on wartime scenario and mission area analysis. This result will contribute not only improvement for the availability of a naval ship but also enhancement of RAM analysis process.

PROGRAM MANAGEMENT STRATEGY FOR THE MaCC PROJECT

  • Boknam Lee;Wooyoung Kim;Seokin Choi;Hyounseung Jang;Bonsang Koo
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1582-1590
    • /
    • 2009
  • In 2006, Korean Government decided to relocate the several Government bodies and public institutes. They include total of 49 central Government agencies, semi-government agencies, and 17 national research institutes. The completion of the relocation program has been set to be final in 2030. The target population for the city plan is set to be 500,000. The goal of MAC is first to complete the first phase of the program by 2014 within the budget. In order to achieve the goal, considerable time has been spent to properly establish the program management system. The success of MAC's Multi-function Program Administration System is too early to determine as it is still in progressive. The success depends on the operations not the development.

  • PDF

Individual Factors Influence on Client Involvement: the Case Construction Projects in Saudi Arabia

  • Trigunarsyah, Bambang;Al-Solaiman, Sultan
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.578-582
    • /
    • 2015
  • Lack of client involvement in construction of public projects has been identified as the main cause of many operational problems. Clients need to perform their roles and responsibilities effectively and efficiently at the right time and through the use of correct methods in order to have the optimum involvement required during all the construction project phases, namely, the planning, design, construction, handover, and operation and maintenance phase. This paper investigates the influence of clients' individual factors on their involvement in construction project delivery. A questionnaire survey was distributed to various government agencies of the Kingdom of Saudi Arabia (KSA). Explanatory Factory Analysis was performed to group nineteen individual factors. The factor analysis result suggests that the individual factors that can involve clients' involvement in construction projects can be grouped into five, which are: adequacy of knowledge and experience for decision making in the early stage of design; ability to communicate clearly; job satisfaction; personal skills; and expertise in design and construction.

  • PDF

Front End Engineering and Design (FEED) for Project Management of Thermal Power Plant Construction

  • KIM, Namjoon;JUNG, Youngsoo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.415-419
    • /
    • 2015
  • Engineering is a value-adding process applying knowledge and skills in the construction industry that includes the planning, feasibility study, project management (PM), front end engineering and design (FEED), detail design, procurement, construction, supervision, and operation. Among these engineering activities, FEED is defined as a comprehensive design practice in the early design phase focused on conceptual design and basic design. It is a particularly influencing area that determines the competitiveness of procurement and construction capability of construction firms (KNIN 2013). Nevertheless, previous studies in FEED have been limited to the design process, deliverable, or particular management technique (e.g. system engineering, collaboration, information etc.). In this context, the purpose of this study is to propose a comprehensive FEED business process structure for project management of thermal power plant construction projects encompassing the entire project life cycle. And an assessment methodology for FEED functions was developed. It is expected that the proposed structure of FEED functions and FEED evaluation methodology will contribute to improvement of competitive capability of engineering, procurement, and construction (EPC) companies.

  • PDF