• Title/Summary/Keyword: EPZ

Search Result 14, Processing Time 0.021 seconds

Traffic management for large-scale evacuation with public transportation and calculation of appropriate operating ratio

  • Ham, Seunghee;Lee, Jun;Lee, Sang Jo
    • Nuclear Engineering and Technology
    • /
    • v.54 no.9
    • /
    • pp.3347-3352
    • /
    • 2022
  • In 2013, the International Atomic Energy Agency (IAEA) changed the recommended maximum range of the Emergency Planning Zone (EPZ) to 30 km, and the Kori Nuclear Power Plant in Republic of Korea has also expanded the EPZ to 30 km, following the recommendation. As a result, metropolitan cities with a high population density are contained within the EPZ, and evacuating millions of people should be considered if the 30 km range of evacuation is to take place. This study proposes an evacuation plan using buses (public transportation) to transport people outside of the EPZ, quickly and efficiently. To verify the appropriate mode share ratio of buses that can guarantee the right of vulnerable road users and reduce traffic congestion, a model was built simulating the Kori Nuclear Power Plant in Ulsan Metropolitan City. The scenarios were established by changing the mode share ratio of buses and passenger cars by 10%. Considering a large-scale network analysis at the city level, a cell transmission model was applied to calculate the evacuation time in each scenario. The result shows that the optimal mode share ratio of buses is 40%, with a total evacuation time of 132 min, considering feasible bus fleets in Ulsan Metropolitan City.

Evaluation of the Size of Emergency Planning Zone for the Korean Standard Nuclear Power Plants (한국표준형 원전에 대한 방사선비상계획구역 범위 평가)

  • Jeon, In-Young;Lee, Jai-Ki
    • Journal of Radiation Protection and Research
    • /
    • v.28 no.3
    • /
    • pp.215-223
    • /
    • 2003
  • Against major release of radioactive material in nuclear power plant, Emergency Planning Zone(EPZ)s are typically established around nuclear power plants to effectively perform the public protective measures. The domestic methodology to determine the size of the EPZ is similar to that of Japan established in 1980, where calculations were based on the conservative accident source term. The objective of this study is to re-evaluate the validity of established EPZ, the area within the radius of $8{\sim}10km$ around domestic nuclear power plants, using the source terms covering full spectrum of accidents obtained from PSA study of ULJIN 3&4. To evaluate the risks of health effects, the computer code MACCS2(MELCOR Accident Consequence Code System2) was used. The result shows that the existing EPZ can reduce the probability of early fatality adequately for most of the source term categories(STCs) except for STC-14 and STC-19. In case of STC-14 and 19, the evacuation distance of 16km and 13km, respectively, are required. These distances can be reduced by improving emergency preparedness since the sensitivity studies for the public protective actions show that the magnitude of early fatality is largely affected by the time delays in notification and evacuation.

A Study on Estimation of Numbers of Motor Unit related to the Widths and Distribution of Endplate in Neuromuscular Junction (신경근육 접합부의 종판 폭과 분포에 따른 운동단위 수의 추정에 관한 연구)

  • Lee, Ho-Yong;Kim, Duck-Young;Park, Jung-Ho;Jung, Chul-Ki;Kim, Sung-Hwan
    • Journal of the Institute of Electronics Engineers of Korea SC
    • /
    • v.48 no.5
    • /
    • pp.81-92
    • /
    • 2011
  • In this paper, a new method to estimate the number of MU (motor unit) related to the widths and distribution of end plate in NMJ (neuromuscular junction) of biceps brachii is proposed by varying muscle parameter statistically in EMG model. This work is done by designing MU-simulator and EPZ-simulator. The proposed method was compared with the results of previous researchers. The proposed MU-simulator generates SMUAP (single motor unit action potential) and CMAP (compound muscle action potential) signal similar to detected SMUAP and CMAP signal obtained from muscle. The EPZ-simulator estimate the numbers of MU by varying the widths and distribution of end plate in neuromuscular junction of muscle. The results shows that the numbers of MU was estimated about 450 ea. and muscle fibers was about 340 ea., end plate widths was about 6 mm, and end plate was randomly distributed. The proposed method may be comparable with the method of anatomical studies.

Public Evacuation Time Estimates within EPZ of Ulchin Site (울진원전 방사선비상계획구역 내의 주민 소개시간 예측)

  • Chung Yang-Geun;Lee Gab-Bock;Bang Sun-Young;Kim Sung-Min;Lee Eun-Mi
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.3 no.4
    • /
    • pp.359-372
    • /
    • 2005
  • The strong protection method of radiation emergency preparedness is the evacuation when a great deal of radionuclide material is released to environment. Required factors for evacuation time estimate of Ulchin nuclear power plant site were investigated. The traffic capacity and the traffic volume by season were investigated for the traffic analysis and simulation within EPZ of Ulchin site. As a result, the background traffic volume by season were established. The NETSIM code was applied to simulate for 12 scenarios in the event of normal traffic/summer peak traffic/winter peak traffic, daytime/night, and normal weather/adverse weather conditions. The results showed that the evacuation time required for total vehicles to move out from EPZ took generally $210\~315$ minutes. The evacuation time took longer about 45 minutes at night than in the daytime, and 45 minutes in adverse weather than normal condition.

  • PDF

Prediction of Evacuation Time for Emergency Planning Zone of Uljin Nuclear Site (울진원전 방사선비상계획구역에 대한 소개시간 예측)

  • Jeon, In-Young;Lee, Jai-Ki
    • Journal of Radiation Protection and Research
    • /
    • v.27 no.3
    • /
    • pp.189-198
    • /
    • 2002
  • The time for evacuation of residents in emergency planning zone(EPZ) of Uljin nuclear site in case of a radiological emergency was estimated with traffic analysis. Evacuees were classified into 4 groups by considering population density, local jurisdictions, and whether they ate residents or transients. The survey to investigate the behavioral characteristics of the residents was made for 200 households and included a hypothetical scenario explaining the accident situation and questions such as dwelling place, time demand for evacuation preparation transportation means for evacuation, sheltering place, and evacuation direction. The microscopic traffic simulation model, CORSIM, was used to simulate the behavior of evacuating vehicles on networks. The results showed that the evacuation time required for total vehicles to move out from EPZ took longer in the daytime than at night in spite that the delay times at intersections were longer at night than in the daytime. This was analyzed due to the differences of the trip generation time distribution. To validate whether the CORSIM model fan appropriately simulate the congested traffic phenomena assumable in case of emergency, a benchmark study was conducted at an intersection without an actuated traffic signal near Uljin site during the traffic peak-time in the morning. This study indicated that the predicted output by the CORSIM model was in good agreement with the observed data. satisfying the purpose of this study.

A Study on the Public Evacuation Time Estimates for Radiological Emergency Plan and Preparedness of Wolsong Nuclear Power Plant Site (방사선 비상계획을 위한 월성원전 주변 주민 소개시간 예측 연구)

  • Lee, Gab-Bock;Bang, Sun-Young;Chung, Yang-Geun
    • Journal of Radiation Protection and Research
    • /
    • v.32 no.2
    • /
    • pp.79-88
    • /
    • 2007
  • When an accident occurs at nuclear power plant and radionuclide material is released to the area around the plant, public evacuation is considered as a measure to protect the safety of the residents nearby. This study draws factors required to estimate evacuation time and make estimation of the time to evacuate all residents from the EPZ of Wolsong site in consideration of traffic condition in the neighborhood and on the basis of field data around the site for each factor. The traffic capacity and the traffic volume by season were investigated for the traffic analysis and simulation within EPZ of Wolsong site. As a result, the background traffic volume by season were established. To estimate TGT(Trip Generation Time), the questionnaire surveys were carried out for resident and transient. The TSIS code was applied to traffic analysis in the events of daytime/night and normal/adverse weather under normal day/summer peak traffic condition. The results showed that the evacuation time required for total vehicles to move out from EPZ took generally from 118 to 150 minutes. The evacuation time took longer maximum 17 minutes at night than daytime during summer peak traffic.

An Analysis of the Transient's Social Behavior in the Radiological Emergency Planning Zone (방사선 비상계획구역에서의 일시거주자의 사회행동 특성 분석)

  • Bang, Sun-Young;Lee, Gab-Bock;Chung, Yang-Geun;Lee, Jae-Eun
    • Journal of Radiation Protection and Research
    • /
    • v.32 no.2
    • /
    • pp.71-78
    • /
    • 2007
  • The purpose of this study is to analyze the social behavior, especially, the evacuation-related social behavior, of the transients in the radiological emergency planning zone(EPZ) of nuclear power plants. So, the meaning and kinds of the evacuation and the significance of the trip generation time(TGT) have been reviewed. The characteristics of the social behavior of the transient around Ulchin, Wolsong and Kori sites was analyzed through field surveys by using the questionnaire. The major findings of this research implications are as follows. First, for securing the safe evacuation, the alternatives to effectively provide the information on the evacuation warning may be prepared. Second, it is necessary to establish the education and training of transient's evacuation. Third, it is needed that the cause and background of the evacuation refusal are identified and the new response plan to secure transient's safety is prepared.

Directions of Development for the Gunsan Free Trade Zone (자유무역지역 발전을 위한 제도개선 및 통합관리 시스템 도입방안 - 군산자유무역지역을 중심으로 -)

  • Kim, Yong-Hwan
    • International Commerce and Information Review
    • /
    • v.3 no.2
    • /
    • pp.235-259
    • /
    • 2001
  • 최근 군산에 자유무역지역이 신규 지정되고 기존의 마산과 익산의 수출자유지역은 자유무역지역으로 이름이 바뀌었다. 새로 도입된 자유무역지역은 성격상 기존의 수출가공구적인 입장에서 탈피하여 제조, 물류, 금융 등이 동시에 가능한 복합적인 성격을 지향하며, 특히 대중국 수출전진기지로서의 군산자유무역지역의 성패가 서해안시대를 맞이한 국민경제 발전의 관건이 되고 있다. 본 연구는 기존의 자유무역지역의 경험과 외국의 자유무역지역의 제도, 군산자유무역지역의 현안문제 등을 종합적으로 검토하여 자유무역지역의 제도개선과 자유무역지역 통합관리시스템 도입방안을 모색하였다.

  • PDF