Journal of the Korea Institute of Building Construction
/
v.14
no.6
/
pp.537-543
/
2014
As environmental matters such as Green House Effect rise, many construction industries are putting an effort on minimizing environmental impact in terms of building life cycle throughout the world. However, in South Korea, evaluating the eco-friendly building based on life cycle assessment has been facing an academic ostracism while the most studies are focusing on assessing the 6 environmental impact assessments of passive apartment based on life cycle assessment. The theoretical consideration of the life cycle assessment and environmental impact category were performed and the direction of the study was set up. Also, existing apartment and passive apartment, which had same structure and same type were chosen and building materials per unit area were compared to find out the difference environmental impact for building life cycle. As a result, passive apartment was rated as low level among the 6 environmental impacts. Also, effect of building material on passive apartment was more important than its operational stage.
In this study, quantitative environmental impact assessments of the VSL anchor and RB(Reaming and Bearing) anchor systems were conducted after a life-cycle assessment (LCA). In addition, improvements which reduce the adverse environmental effects of the RB anchor system were confirmed through comparisons with results with a VSL anchor system. Both results showed that water ecotoxicity and global warming are the most important in environmental influences. To determine the effect of reducing the RB anchor system environment, the result was normalized for the environmental impact category. Most items appeared to have been improved with regard to the RB anchor system. The most significant improvement was a 77% decrease in POC levels(photochemical oxidant creation). Greenhouse gas emissions, related to global warming, were decreased by 44%. It is expected that these quantitative environmental impact assessment results will serve as the basis of an anchor system for civil engineering and environmental impact assessments.
In orderto cope with the post-2020 in accordance with the Paris Agreement, greenhouse gas (GHG)reduction in Environmental Impact Assessment (EIA) and its contributions to post-2020 were discussed. The 26 Environmental Impact Statement (EIS) administered by Geum-River Basin Environmental Office from 2010 to 2019 were analyzed for reviewing GHG mitigation measures. From the case study, it was found that the assessment of GHG emissions reduction and climate change adaptation were not appropriately performed. In this study, the following measures are proposed to improve the inappropriate assessment of 'GHG subject matter' associated with EIA according to post-2020, 1) allotment of enforced charge on GHG emission during the EIA process, 2) addition of the 'GHG subject matter' in 'establishing permissible discharge standards' which is based on "Act on the Integrated Control of Pollutant-discharging Facilities", and 3) the participation of stakeholders in early EIA stage for governance. Also the details on the EIA for the preparedness of post-2020 were discussed here.
Kim, Gui-Young;Lee, Dae-In;Eom, Ki-Hyuk;Jeon, Kyeong-Am;Kang, Sung-Kyung
Journal of the Korean Society for Marine Environment & Energy
/
v.16
no.2
/
pp.121-129
/
2013
This study investigated the status and problems of the post-project environmental management for development projects and suggested improvements of the system to achieve effectiveness for the system of the sea area utilization consultation. The post-project environmental management has had several problems such as the neglect of implementations and checks for the consultation items, the lack of actions and notifications of results, the absence of awareness and expertise of the post-project environmental management. In addition, although it is very important to verify results of actual change and modelling of marine environment before and after the projects, the marine environmental monitoring and assessment have been perfunctorily carried out. Thus, for the improvements of the post-project environmental management to the system of the sea area utilization consultation, it is extremely necessary for related stakeholders to raise awareness of the post management and implement it faithfully, and establish the post management system for conflict resolution and enforce sanctions and accountability against executory items. Furthermore, it should establish systematic monitoring system of marine environmental impact survey.
The study is intended to develop the measures to introduce the Environmental Impact Assessment (EIA) project manager (Environmental Assessor), who will be responsible for leading the EIA task. This role requires a quality standard of expertise in the area of natural science, social science, knowledge and technology on environment design mechanism, and the integrated approaches that combine the relevant policies and systems. To facilitate the system, the certificate will be given to the person who is well acquainted with the knowledge on EIA with relevant experiences, thereby authorizing them to coordinate the assessment task for reliable outcome. Hence, the need for introducing the system is very crucial. The EIA project manager, as a guide for an EIA project team, shall be the person who has a comprehensive understanding of the project, the knowledge about the principal for implementation of EIA and the expertise in structuring the management system, with a skill to maintain the good relationship with the people engaged in the project. To that end, it is highly recommended to set up such a certificate system to be incorporated in the college curriculum.
Journal of Agricultural Extension & Community Development
/
v.6
no.1
/
pp.15-24
/
1999
There have always been dilemmas between development and environmental conservation throughout the world. Gradually environmental contamination threatens sustainable development and conservation. we try to study on the sustainable development with environmental conservation. One of the instruments to get this goal is Environmental Impact Statement. Environmental Impact Statement has now become a standard tool of decision making in Environmentally Sound and Sustainable Development. The objectives of this study is to explore and suggest some suggestions for improvements of EIA. 1. Identify all criteria and standards that apply to physical and social environmental components and dynamics. 2. Giving attention to the purpose of the criterion and standard, with respect to resource use and quality. 3. Demonstrate the relevance legal, technical, and scientific authority by early planning through construction, operation and maintenance phases. 4. Implement rationales and protocols for the documentation of standard analytical methods, location of sampling points and statistical analysis of data. 5. Establish precise protocols by predictions of environmental impact relevant for established criteria and standards. Reviewing these protocols with relevant legal authorities prior to their implementation is important.
The applications of artificial intelligence (AI) can provide useful solutions to animal infectious diseases and their impact on humans. The advent of AI learning algorithms and recognition technologies is especially advantageous in applied studies, including the detection, analysis, impact assessment, simulation, and prediction of environmental impacts on malignant animal epidemics. To this end, this study specifically focused on environmental pollution and animal diseases. While the number of related studies is rapidly increasing, the research trends, evolution, and collaboration in this field are not yet well-established. We analyzed the bibliographic data of 1191 articles on AI applications to environmental pollution and animal diseases during the period of 2000~2019; these articles were collected from the Web of Science (WoS). The results revealed that PR China and the United States are the leaders in research production, impact, and collaboration. Finally, we provided research directions and practical implications for the incorporation of AI applications to address environmental impacts on animal diseases.
The low rate of penetration and short lifetime of drilling bit served as the most common problems encountered in hard formation drilling, thus leading to severe restriction of drilling efficiency in oil and gas reservoir. This study developed a new local impact drilling method to enhance hard formation drilling efficiency. The limitation length formulas of radial/lateral cracks under static indentation and dynamic impact are derived based on the experimental research of Marshall D.B considering the mud column pressure and confining pressure. The local impact rock breaking simulation model is conducted to investigate its ROP raising effect. The results demonstrate that the length of radial/lateral cracks will increase as the decrease of mud pressure and confining pressure, and the local impact can result in a damage zone round the impact crater which helps the rock cutting, thus leading to the ROP increase. The numerical results also demonstrate the advantages of local impact method for raising ROP and the vibration reduction of bit in hard formation drilling. This study has shown that the local impact method can help raising the ROP and vibration reduction of bit, and it may be applied in drilling engineering.
Kim, In-Cheol;Jeon, Kyeong-Am;Kim, Gui-Young;Eom, Ki-Hyuk;Kim, Young-Tae;Choi, Bo-Ram
Journal of the Korean Society of Marine Environment & Safety
/
v.20
no.2
/
pp.157-164
/
2014
This paper suggested the improvement of marine environmental impact assessment of different types of project by analyzing the consultation on the coastal area utilization(133cases) of the coastal development project for 4years(2010-2013). According to the analysis results, the erosion protection project needs to precede the accurate analysis of erosion reasons, predict exactly possible problems and establish the systematic system to verify the effect of erosion protection by monitoring after projects. The construction projects of revetments and coastal roads have to require to sublate, examine the reliability in structures, give consideration to the problems of coastal erosion by increase of reflected waves. In addition, flooding protection projects have got to require to select the waves for evaluation items in conjunction with the effects of abnormal waves. furthermore, waterfront construction projects need to establish comprehensive and methodical space plans and reinforce the review to conserve the natural environment and conduct nature-friendly development. There are many problems inherently related to coastal development Project. To these problems, however, it is required to support the project on the side of the legislation and conduct additional studies reflecting the characteristics by sea areas and projects.
Korean Journal of Construction Engineering and Management
/
v.15
no.5
/
pp.13-21
/
2014
This study on condominium complex will adopt the quantitative assessment of the influence on the environment throughout the entire life cycle of buildings. This paper applies input-out analysis in order to analyse embodied energy regarding input of materials at material production phase. Also, it calculates environment load at use and demolition and destruction Phases of buildings as analysing energy consumption. The study categorises environment load as six impact categories and undertakes environmental impact evaluation. The consequence shows that the environment load of multi-unit dwelling takes up 88.2% out of the entire environment load of condominium complex. Also, as a result of analyzing the environmental impact of the life cycle of condominium buildings, it was found that such environmental impact comprised of about 11.96% of all industries in Korea that had an environmental impact.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.