Hye-Ryeong O;Won-Mo GAL;Ok-Nam Park;Mi-Hwa JANG;Seok-Soon KWO;Seung-Hyuck PARK
웰빙융합연구
/
제7권2호
/
pp.49-56
/
2024
Purpose: Construction sites are currently facing a socialization problem as the incidence of thermal disease-related disasters increases due to summer heat waves, exacerbated by factors like the concentration of middle-aged and older workers and global warming. The reason why construction sites are particularly vulnerable to heat waves is that there are many outdoor work, which is the peculiarity of the construction industry, and most of the construction workers are elderly. This study analyzes disaster statistics of workers at construction sites for five years to investigate the occurrence of thermal diseases and analyze factors through disaster cases to provide basic data for future disasters to be reduced. Research design, data, and methodology: According to the Construction Workers' Mutual Aid Association, as of June, more than 60% of the construction workers working in the field were in their 50s and 60s. More than 24% are in their 60s and older. Thermal diseases caused by heat waves occur when exposed to high heat or strong sunlight for a long time, accompanied by headaches and dizziness. The problem is that many elderly people have underlying diseases, so if they lose consciousness, they cannot easily recover and are likely to die. Results: According to industrial accident statistics, 182 people were injured by heat-related diseases in the summer from 2016 to 2021, of which 29 died. In particular, in the construction industry, which has a lot of outdoor work, 87 people were injured and 20 people died. Conclusions: In order to prevent heat diseases caused by outdoor work, it is emphasized that exposure time is controlled, and sufficient rest and hydration are essential. Rest, water, and shade are in line with the three principles.
Muhwezi, Lawrence;Kiberu, Faisal;Kyakula, Michael;Batambuze, Alex O.
Journal of Construction Engineering and Project Management
/
제2권4호
/
pp.20-24
/
2012
Construction while being an economic activity that provides facilities and infrastructure, it is beneficial to man in some aspects and detrimental in others. There have been environmental concerns related to construction activities globally which mainly focus on atmospheric emissions, depletion of natural resources and energy issues. This study was carried out to assess the impacts of construction activities on the environment in Iganga Municipality and to propose measures for their mitigation. The methodology included: review of relevant literature, observations of the general environmental effects of construction activities, focus groups and a survey conducted among construction industry role players to determine their perceptions and opinions regarding environmental impact of construction activities. The collected data was presented in tabular form and analysed by description of responses to questions. The study revealed that forests were the most greatly degraded due to high demand of timber for construction followed by wetlands degradation. The findings of this study will be useful to architects, designers and builders in order to carefully design buildings and other infrastructure that are environmentally friendly and sustainable. Construction materials and their mode of acquisition are harmful threats to the environment. There is need to reduce the consumption of these materials through recycling and reusing wastes to reduce on waste generation, use of virgin materials and the subsequent waste of energy used in new material production.
Journal of Construction Engineering and Project Management
/
제7권2호
/
pp.11-18
/
2017
The cycle time of construction equipment for earthwork operations has a significant impact on project productivity. Elements that directly impact a haul vehicle's cycle time must be identified in order to accurately quantify the haul cycle time and implement strategies to decrease it. The objective of this research is to scientifically identify and quantify variables that have a significant impact on the cycle time of a dump truck used for earthwork. Real-time location data collected by GPS devices deployed in an active earthwork moving construction site was analyzed using statistical regression. External data including environmental components and haul road conditions were also collected periodically throughout the study duration. Several statistical analyses including a variance analysis and regression analysis were completed on the dump truck location data. Collected data was categorized by stage of the dump truck cycle. Results indicate that a dump truck's enter idle time, exit idle time, moving speed and driver visibility can significantly impact the dump truck cycle time. The contribution of this research is the identification and analysis of statistically significant correlations of variables within the cycle time.
Although the safety management plan review system according to the Construction Technology Promotion Act for securing the safety of the construction work is a fundamental system essential for the prevention of the construction industry disaster, the necessity of its improvement has been raised because it often fails to meet the original purpose. In this study, through the analysis of the effect of the safety management plan and the problems of the operation, we suggest ways to improve it in view of the construction accident reduction and conducted surveys on the construction site through the questionnaires of the client, construction company, and construction business technology manager. In order to improve the effectiveness of this system as a result of the study, it is necessary to distribute the guidelines for the preparation of the safety management plan, manuals, etc., to simplify the contents of the safety management plan, also the step-by-step approval of the safety plan can be a solution. For this, it is necessary to revise the policy through consultation with the Ministry of Land, Transport and Maritime Affairs and related experts.
The 9th International Conference on Construction Engineering and Project Management
/
pp.1114-1121
/
2022
Construction laborers and crews play a critical role in achieving a safe and productive construction site. Many past research studies used top-down approaches/perspectives for studying the impact of laborers' performance on overall construction site outputs with limited flexibility in accounting for laborers' various characteristics. However, the recent reap in computational advances allowed applications of bottom-up architectures, which can potentially incorporate heterogeneous characteristics of laborers' individual behavioral and decision-making features effectively. Accordingly, agent-based modeling (ABM), as a tool to leverage a bottom-up methodological approach, has been widely adopted by recent research. Existing literature investigated the influence of changes in laborers' behaviors and interactions on either construction sites' safety performance or productivity performance individually, leaving the tradeoff between safety and productivity in this context relatively unexplored. Accordingly, this study aims to develop an agent-based framework to study the tradeoff between project safety and productivity performances resulting from changes in laborers' behaviors after attending safety trainings. Our findings via simulations indicate that proper safety trainings can improve safety performance without negatively impacting productivity performance.
The 9th International Conference on Construction Engineering and Project Management
/
pp.450-457
/
2022
The construction industry is demanding, dynamic, and complex making it difficult for workers to recognize hazards. The nature of construction tasks exposes workers to several critical risk factors, such as a high rate of exertion and fatigue. Recent studies suggest that fatigue may impact hazard recognition in the construction industry. However, most studies rely on subjective measures when assessing the relationship between physical fatigue and hazard recognition, limiting such studies' efficacy. Thus, this study examined the relationship between physical fatigue and hazard recognition using a controlled experiment. Worker fatigue levels were captured using physiological data and a subjective exertion scale. The findings confirmed that physical exertion plays a significant role in hazard recognition skills (p < 0.05). This research contributes to theory and practice by providing a process for objectively assessing the influence of physical fatigue on worker safety and providing construction professionals with some critical insight needed to improve workplace safety.
The 9th International Conference on Construction Engineering and Project Management
/
pp.336-343
/
2022
Industrial robotic arms are widely adopted in numerous industries for manufacturing automation under factory settings, which eliminates the limitations of manual labor and provides significant productivity and quality benefits. The U.S. modular construction industry, despite having similar controlled factory environments, still heavily relies on manual labor. Thus, this study investigates the U.S., Canada, and Europe-based leading modular construction companies and research labs implementing industrial robotic arms for manufacturing automation. The investigation mainly considered the current research scope, industry state, and constraints, as well as identifying the types and specifications of the robotic arms in use. First, the study investigated well-recognized modular building associations, the Modular Building Institute (MBI), and renowned architecture design magazine, Dezeen to gather industry updates. The authors discovered one university lab and a few companies that adopted Switzerland-based robotic arms, ABB. Researching ABB robotics led to the discovery of ABB's competitor, Germany-based KUKA robotic arms. Consequently, research extended to the companies and labs adopting KUKA models. In total, this study has identified seven modular companies and four research labs. All companies employed robotic arms and gantry robot combinations in a production-line-like system for partial automation, and some adopted design standardization for optimization. The common goal among the labs was to achieve greater flexibility and full automation with robotic arms. This study will help companies better implement robotic arm automation by providing recommendations from investigating its current industry status.
The purpose of this study is the comparative analysis of Susan citizens' images of Eulsook-do as a coastal tourism destination before and after the construction of a road bridge across the Nakdong estuary in order to analyze local people's changes in leisure patterns. Analysis of the images of a pre-construction Eulsook-do that people aged both 40 and less and 50 and more had on five dimensions showed values higher than zero(0) that suggests neutral image, while their images of a post-construction Eulsook-do showed the shrinking size of pentagon on all five dimensions: ET(Entertainment), CA(Culture & Art), EE(Environment & Ecology), RC(Recreation) and LP(Leports) dimensions. Its pre- and post- construction image analysis conducted 20 years after it came to be built finds that the road bridge construction has led to the ecological, environmental disruption of the coast and the lower Nakdong river, having negative influence on the images of Eulsook-so.
Jee, Sung Hyun;Kang, Seong Hae;Kim, Jeong Hwan;Seo, Jong Won
Journal of Construction Engineering and Project Management
/
제3권2호
/
pp.49-57
/
2013
A sea dike construction has been increased in Korea because of the actively deployed reclamation project in basis of efficient application in land. The degree of completion in sea dike construction is affected by final closing construction, which has a lot of uncertainty that often results in higher accidents rate. Therefore, this research identified risk factors of final closing construction and classified them. This research examines the likelihood and its impact for each risk factor and calculates the risk degree as to the risk matrix. Based on this, the impact and the environmental conditions that affect to risk factors are investigated and further responsive methods are established for each risk factor. Ultimately, this research attempts to provide the risk retrenchment method for inspectors by proposing risk estimation model, responsive action list, and risk management process.
The study set up the models of a general standard apartment house and a super high-rise standard apartment house, which were based on the 5 floor plans of the assessment reference houses of the "green homes" provided by the government; such main construction materials as to account for more than 80% of the entire amount of $CO_2$ emission in a construction work were selected; a database was built up for evaluating the environmental loads of the main materials according to the house types that were different from each other in area, block type, combination of living units or floor; and using the database, an attempt was made to develop the technology to assess $CO_2$ emission from the production of construction materials used in the stage of construction.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.