• 제목/요약/키워드: ENVIRONMENTAL CONSTRUCTION

검색결과 7,592건 처리시간 0.029초

A Study on the Safety Measures for Thermal Diseases, Focusing on the Cases of Disaster by Construction Industry

  • Hye-Ryeong O;Won-Mo GAL;Ok-Nam Park;Mi-Hwa JANG;Seok-Soon KWO;Seung-Hyuck PARK
    • 웰빙융합연구
    • /
    • 제7권2호
    • /
    • pp.49-56
    • /
    • 2024
  • Purpose: Construction sites are currently facing a socialization problem as the incidence of thermal disease-related disasters increases due to summer heat waves, exacerbated by factors like the concentration of middle-aged and older workers and global warming. The reason why construction sites are particularly vulnerable to heat waves is that there are many outdoor work, which is the peculiarity of the construction industry, and most of the construction workers are elderly. This study analyzes disaster statistics of workers at construction sites for five years to investigate the occurrence of thermal diseases and analyze factors through disaster cases to provide basic data for future disasters to be reduced. Research design, data, and methodology: According to the Construction Workers' Mutual Aid Association, as of June, more than 60% of the construction workers working in the field were in their 50s and 60s. More than 24% are in their 60s and older. Thermal diseases caused by heat waves occur when exposed to high heat or strong sunlight for a long time, accompanied by headaches and dizziness. The problem is that many elderly people have underlying diseases, so if they lose consciousness, they cannot easily recover and are likely to die. Results: According to industrial accident statistics, 182 people were injured by heat-related diseases in the summer from 2016 to 2021, of which 29 died. In particular, in the construction industry, which has a lot of outdoor work, 87 people were injured and 20 people died. Conclusions: In order to prevent heat diseases caused by outdoor work, it is emphasized that exposure time is controlled, and sufficient rest and hydration are essential. Rest, water, and shade are in line with the three principles.

An Assessment of the Impact of Construction Activities on the Environment in Uganda: A Case Study of Iganga Municipality

  • Muhwezi, Lawrence;Kiberu, Faisal;Kyakula, Michael;Batambuze, Alex O.
    • Journal of Construction Engineering and Project Management
    • /
    • 제2권4호
    • /
    • pp.20-24
    • /
    • 2012
  • Construction while being an economic activity that provides facilities and infrastructure, it is beneficial to man in some aspects and detrimental in others. There have been environmental concerns related to construction activities globally which mainly focus on atmospheric emissions, depletion of natural resources and energy issues. This study was carried out to assess the impacts of construction activities on the environment in Iganga Municipality and to propose measures for their mitigation. The methodology included: review of relevant literature, observations of the general environmental effects of construction activities, focus groups and a survey conducted among construction industry role players to determine their perceptions and opinions regarding environmental impact of construction activities. The collected data was presented in tabular form and analysed by description of responses to questions. The study revealed that forests were the most greatly degraded due to high demand of timber for construction followed by wetlands degradation. The findings of this study will be useful to architects, designers and builders in order to carefully design buildings and other infrastructure that are environmentally friendly and sustainable. Construction materials and their mode of acquisition are harmful threats to the environment. There is need to reduce the consumption of these materials through recycling and reusing wastes to reduce on waste generation, use of virgin materials and the subsequent waste of energy used in new material production.

Impact Variables of Dump Truck Cycle Time for Heavy Excavation Construction Projects

  • Song, Siyuan;Marks, Eric;Pradhananga, Nipesh
    • Journal of Construction Engineering and Project Management
    • /
    • 제7권2호
    • /
    • pp.11-18
    • /
    • 2017
  • The cycle time of construction equipment for earthwork operations has a significant impact on project productivity. Elements that directly impact a haul vehicle's cycle time must be identified in order to accurately quantify the haul cycle time and implement strategies to decrease it. The objective of this research is to scientifically identify and quantify variables that have a significant impact on the cycle time of a dump truck used for earthwork. Real-time location data collected by GPS devices deployed in an active earthwork moving construction site was analyzed using statistical regression. External data including environmental components and haul road conditions were also collected periodically throughout the study duration. Several statistical analyses including a variance analysis and regression analysis were completed on the dump truck location data. Collected data was categorized by stage of the dump truck cycle. Results indicate that a dump truck's enter idle time, exit idle time, moving speed and driver visibility can significantly impact the dump truck cycle time. The contribution of this research is the identification and analysis of statistically significant correlations of variables within the cycle time.

현장실태조사를 통한 건설기술진흥법 상 안전관리계획서의 개선방향에 대한 연구 (A Study on the Improvement of the Safety Management Plan under the Construction Technology Promotion Act by Field Survey)

  • 윤영근;이명구;오태근
    • 한국안전학회지
    • /
    • 제33권4호
    • /
    • pp.30-37
    • /
    • 2018
  • Although the safety management plan review system according to the Construction Technology Promotion Act for securing the safety of the construction work is a fundamental system essential for the prevention of the construction industry disaster, the necessity of its improvement has been raised because it often fails to meet the original purpose. In this study, through the analysis of the effect of the safety management plan and the problems of the operation, we suggest ways to improve it in view of the construction accident reduction and conducted surveys on the construction site through the questionnaires of the client, construction company, and construction business technology manager. In order to improve the effectiveness of this system as a result of the study, it is necessary to distribute the guidelines for the preparation of the safety management plan, manuals, etc., to simplify the contents of the safety management plan, also the step-by-step approval of the safety plan can be a solution. For this, it is necessary to revise the policy through consultation with the Ministry of Land, Transport and Maritime Affairs and related experts.

An Agent-Based Framework for Investigating Safety-Productivity Tradeoff of Construction Laborers Considering Risk-taking Behavioral Heterogeneity

  • Khodabandelu, Ali;Park, JeeWoong;Kheyrandish, Seyedmohsen
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.1114-1121
    • /
    • 2022
  • Construction laborers and crews play a critical role in achieving a safe and productive construction site. Many past research studies used top-down approaches/perspectives for studying the impact of laborers' performance on overall construction site outputs with limited flexibility in accounting for laborers' various characteristics. However, the recent reap in computational advances allowed applications of bottom-up architectures, which can potentially incorporate heterogeneous characteristics of laborers' individual behavioral and decision-making features effectively. Accordingly, agent-based modeling (ABM), as a tool to leverage a bottom-up methodological approach, has been widely adopted by recent research. Existing literature investigated the influence of changes in laborers' behaviors and interactions on either construction sites' safety performance or productivity performance individually, leaving the tradeoff between safety and productivity in this context relatively unexplored. Accordingly, this study aims to develop an agent-based framework to study the tradeoff between project safety and productivity performances resulting from changes in laborers' behaviors after attending safety trainings. Our findings via simulations indicate that proper safety trainings can improve safety performance without negatively impacting productivity performance.

  • PDF

The Impact of Fatigue on Hazard Recognition: An Objective Pilot Study

  • Ibrahim, Abdullahi;Okpala, Ifeanyi;Nnaji, Chukwuma;Namian, Mostafa;Koh, Amanda
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.450-457
    • /
    • 2022
  • The construction industry is demanding, dynamic, and complex making it difficult for workers to recognize hazards. The nature of construction tasks exposes workers to several critical risk factors, such as a high rate of exertion and fatigue. Recent studies suggest that fatigue may impact hazard recognition in the construction industry. However, most studies rely on subjective measures when assessing the relationship between physical fatigue and hazard recognition, limiting such studies' efficacy. Thus, this study examined the relationship between physical fatigue and hazard recognition using a controlled experiment. Worker fatigue levels were captured using physiological data and a subjective exertion scale. The findings confirmed that physical exertion plays a significant role in hazard recognition skills (p < 0.05). This research contributes to theory and practice by providing a process for objectively assessing the influence of physical fatigue on worker safety and providing construction professionals with some critical insight needed to improve workplace safety.

  • PDF

The Current State and Future Directions of Industrial Robotic Arms in Modular Construction

  • Song, Seung Ho;Choi, Jin Ouk;Lee, Seungtaek
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.336-343
    • /
    • 2022
  • Industrial robotic arms are widely adopted in numerous industries for manufacturing automation under factory settings, which eliminates the limitations of manual labor and provides significant productivity and quality benefits. The U.S. modular construction industry, despite having similar controlled factory environments, still heavily relies on manual labor. Thus, this study investigates the U.S., Canada, and Europe-based leading modular construction companies and research labs implementing industrial robotic arms for manufacturing automation. The investigation mainly considered the current research scope, industry state, and constraints, as well as identifying the types and specifications of the robotic arms in use. First, the study investigated well-recognized modular building associations, the Modular Building Institute (MBI), and renowned architecture design magazine, Dezeen to gather industry updates. The authors discovered one university lab and a few companies that adopted Switzerland-based robotic arms, ABB. Researching ABB robotics led to the discovery of ABB's competitor, Germany-based KUKA robotic arms. Consequently, research extended to the companies and labs adopting KUKA models. In total, this study has identified seven modular companies and four research labs. All companies employed robotic arms and gantry robot combinations in a production-line-like system for partial automation, and some adopted design standardization for optimization. The common goal among the labs was to achieve greater flexibility and full automation with robotic arms. This study will help companies better implement robotic arm automation by providing recommendations from investigating its current industry status.

  • PDF

A Comparative analysis of the Pre- and Post-Construction Image Analysis of the Nakdong Estuary as Coastal Tourism Resource

  • Yhang Wii-Joo;Cho Yoon-Shik
    • 한국환경과학회지
    • /
    • 제14권10호
    • /
    • pp.905-910
    • /
    • 2005
  • The purpose of this study is the comparative analysis of Susan citizens' images of Eulsook-do as a coastal tourism destination before and after the construction of a road bridge across the Nakdong estuary in order to analyze local people's changes in leisure patterns. Analysis of the images of a pre-construction Eulsook-do that people aged both 40 and less and 50 and more had on five dimensions showed values higher than zero(0) that suggests neutral image, while their images of a post-construction Eulsook-do showed the shrinking size of pentagon on all five dimensions: ET(Entertainment), CA(Culture & Art), EE(Environment & Ecology), RC(Recreation) and LP(Leports) dimensions. Its pre- and post- construction image analysis conducted 20 years after it came to be built finds that the road bridge construction has led to the ecological, environmental disruption of the coast and the lower Nakdong river, having negative influence on the images of Eulsook-so.

Risk Based Decision Support for Final Closing Section of a Sea Dike

  • Jee, Sung Hyun;Kang, Seong Hae;Kim, Jeong Hwan;Seo, Jong Won
    • Journal of Construction Engineering and Project Management
    • /
    • 제3권2호
    • /
    • pp.49-57
    • /
    • 2013
  • A sea dike construction has been increased in Korea because of the actively deployed reclamation project in basis of efficient application in land. The degree of completion in sea dike construction is affected by final closing construction, which has a lot of uncertainty that often results in higher accidents rate. Therefore, this research identified risk factors of final closing construction and classified them. This research examines the likelihood and its impact for each risk factor and calculates the risk degree as to the risk matrix. Based on this, the impact and the environmental conditions that affect to risk factors are investigated and further responsive methods are established for each risk factor. Ultimately, this research attempts to provide the risk retrenchment method for inspectors by proposing risk estimation model, responsive action list, and risk management process.

표준공동주택의 주요 건설자재 설정을 통한 공동주택 환경부하 비교평가에 관한 연구 (The Environmental Load Comparison Evaluation of The Apartment House for Main Construction Materials of Standard Apartment House)

  • 우지환;신성우
    • KIEAE Journal
    • /
    • 제10권1호
    • /
    • pp.85-90
    • /
    • 2010
  • The study set up the models of a general standard apartment house and a super high-rise standard apartment house, which were based on the 5 floor plans of the assessment reference houses of the "green homes" provided by the government; such main construction materials as to account for more than 80% of the entire amount of $CO_2$ emission in a construction work were selected; a database was built up for evaluating the environmental loads of the main materials according to the house types that were different from each other in area, block type, combination of living units or floor; and using the database, an attempt was made to develop the technology to assess $CO_2$ emission from the production of construction materials used in the stage of construction.