• Title/Summary/Keyword: ELCC(Effective Load Carrying Capability)

Search Result 4, Processing Time 0.015 seconds

Analysis of Capacity Factors and Capacity Credits for Wind Turbines Installed in Korea (국내 풍력발전 설비의 이용률과 용량크레딧 분석)

  • Paik, Chunhyun
    • Journal of the Korean Solar Energy Society
    • /
    • v.39 no.4
    • /
    • pp.79-91
    • /
    • 2019
  • The capacity credit (CC) is a key metric for mid- to long-term power system capacity planning. The purpose of this study is to estimate the CCs of domestic wind turbines. Based on hourly capacity factor (CF) data during the seven years from 2011 to 2017, the new so-called probabilistic CF scheme is introduced to effectively reflect the variability of CFs on CC estimation. The CCs are then estimated through the CF-based method and the ELCC (Effective Load Carrying Capability) method reflecting the probabilistic CF scheme, and the results are compared. The results show that the CC value 0.019 for domestic wind turbines proposed in the $8^{th}$ Basic Plan for Electricity Supply and Demand corresponds to the CC with a confidence level slightly lower than 95%.

Capacity Credit and Reasonable ESS Evaluation of Power System Including WTG combined with Battery Energy Storage System (에너지저장장치와 결합한 WTG를 포함하는 전력계통의 Capacity Credit 평가 및 ESS 적정규모 평가방안)

  • Oh, Ungjin;Lee, Yeonchan;Choi, Jaeseok;Lim, Jintaek
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.65 no.6
    • /
    • pp.923-933
    • /
    • 2016
  • This paper proposes a new method for evaluating Effective Load Carrying Capability(ELCC) and capacity credit(C.C.) of power system including Wind Turbine Generator(WTG) combined with Battery Energy Storage System(BESS). WTG can only generate electricity power when the fuel(wind) is available. Because of fluctuation of wind speed, WTG generates intermittent power. In view point of reliability of power system, intermittent power of WTG is similar with probabilistic characteristics based on power on-off due to mechanical availability of conventional generator. Therefore, high penetration of WTG will occur difficulties in power operation. The high penetration of numerous and large capacity WTG can make risk to power system adequacy, quality and stability. Therefore, the penetration of WTG is limited in the world. In recent, it is expected that BESS installed at wind farms may smooth the wind power fluctuation. This study develops a new method to assess how much is penetration of WTG able to extended when Wind Turbine Generator(WTG) is combined with Battery Energy Storage System(BESS). In this paper, the assessment equation of capacity credit of WTG combined with BESS is formulated newly. The simulation program, is called GNRL_ESS, is developed in this study. This paper demonstrates a various case studies of ELCC and capacity credit(C.C.) of power system containing WTG combined with BESS using model system as similar as Jeju island power system. The case studies demonstrate that not only reasonable BESS capacity for a WTG but also permissible penetration percent of WTG combined with BESS and reasonable WTG capacity for a BESS can be decided.

Maintenance Scheduling with Considering Load Forecast Uncertainty (수요예측의 불확실성을 고려한 발전기의 정기 보수계획수립)

  • Song, K.Y.;Cha, J.M.;Oh, K.H.;Jung, M.H.;Kim, Y.H.
    • Proceedings of the KIEE Conference
    • /
    • 1995.07b
    • /
    • pp.562-564
    • /
    • 1995
  • This paper proposes a new algorithm for maintenance scheduling with considering load forecast uncertainty. The proposed algorithm is based on the equivalent load of effective load carrying capability(ELCC) of generators. The uncertainty of forecasted load is considered as a normal distribution probability density function. For maintenance scheduling, reserve levelization method and risk levelization method are used in this study. To test the algorithm, we applied the proposed method to IEEE reliability test system(IEEE RTS). As a result, we verified the validity of the proposed method.

  • PDF

Development of Methodology of New Effective Installed Reserve Rate considering Renewable Energy Generators (신재생에너지전원을 고려한 새로운 유효설비예비율 평가방법의 개발)

  • Park, Jeong-Je;Choi, Jae-Seok
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.1
    • /
    • pp.26-32
    • /
    • 2010
  • This paper proposes a new effective installed reserve rate in order to evaluate reliability of power system considering renewable generators, which include uncertainty of resource supply. It is called EIRR(effective installed reserve rate) in this paper. It is developed with considering capacity credit based on ELCC by using LOLE reliability criterion. While the conventional installed reserve rate index yields over-evaluation reliability of renewable generators, the proposed EIRR describes actual effective installed reserve rate. However, it is not the probabilistic reliability index as like as LOLE or EENS but another deterministic effective reliability index. The proposed EIRR is able to evaluate the realistic contribution to the reliability level for power system considering wind turbine generators and solar cell generators with high uncertainty in resource supply. The case study in model system as like as Jeju power system size presents a possibility that the proposed EIRR can be used practically as a new deterministic reliability index for generation expansion planning or operational planning in future.