EGS field case studies - UK Rosemanowes and Australian Cooper Basin projects (EGS 실증연구사례 - 영국 Rosemanowes 프로젝트와 호주 Cooper Basin 프로젝트)

  • Min, Ki-Bok;Xie, Linmao;Kim, Hanna;Lee, Jaewon
    • Tunnel and Underground Space
    • /
    • v.24 no.1
    • /
    • pp.21-31
    • /
    • 2014
  • In order to generate electricity from geothermal energy for non-volcanic region, the concept of enhanced geothermal system (EGS) is introduced which forms an artificial reservoir by injecting high pressure fluid to 5 km deep and circulating geothermal fluid through the reservoir. Demonstration studies have been conducted in various countries and regions for determining the feasibility of EGS. In this technical note, experiences, errors, and implications of EGS demonstration projects in UK Rosemanowes and Australia Cooper Basin which have been carried out since 2002 are introduced to be used for the EGS demonstration project in Korea.

Study on EGS5 Based Test Code and Preliminary Results (EGS5 기반 사용자코드의 작성과 초기 계산결과)

  • Jeong Dong-Hyeok;Kim Jhin-Kee;Shin Kyo-Chul;Kim Ki-Hwan;Kim Jeung-Kee;Oh Young-Kee;Ji Young-Hun
    • Progress in Medical Physics
    • /
    • v.17 no.2
    • /
    • pp.123-129
    • /
    • 2006
  • A test code was written to apply the EGS5 Monte Carlo code recently published to radiotherapy. This test code was designed to calculate the depth dose in cylindrical phantom for point source model. The evaluation of the test code was peformed by calculating the depth dose curves for high energy electrons of 5, 9, 12, and 15 MeV photons of Co-60 and 10 MV in water and comparing the results with DOSRZ/EGS4 results. In depth dose results, the differences between test code and DOSRZ/EGS4 were estimated to be less then ${\pm}1.5%\;and\;{\pm}3.0%$ approximately for electron and photon beams respectively.

  • PDF

Molecular Cloning of cDNA Encoding a Putative Eugenol Synthase in Tomato (Solanum lycopersicum 'Micro-Tom') and Prediction of 3D Structure and Physiochemical Properties (토마토 'Micro-Tom' 과실의 eugenol synthase 유전자 클로닝, 단백질의 3차 구조 및 생리화학적 특성 예측)

  • Kang, Seung-Won;Seo, Sang-Gyu;Lee, Tai-Ho;Lee, Gung-Pyo
    • Journal of agriculture & life science
    • /
    • v.46 no.4
    • /
    • pp.9-20
    • /
    • 2012
  • Eugenol is a volatile compound synthesized by eugenol synthase in various plants and belongs to phenylpropene compounds. However, characteristics of eugenol synthase in tomato has not been known. Therefore, we cloned a full length cDNA of a putative eugenol synthase from tomato 'Micro-Tom' using rapid amplification of cDNA ends (RACE) technique and named a clone SlEGS. Open reading frame of SlEGS was 921bp long and its deduced amino acid sequence was 307bp. The BLAST analysis indicated that SlEGS shared high similarity with PhEGS1 (67.1%) and CbEGS2 (69.4%). Amino acid composition of SlEGS was determined by CLC genomics workbench tool and 3D structure of SlEGS was constructed by homology modeling using Swiss-PDB viewer and validated using PROCHECK and ProSA-web tool. In addition, the physiochemical properties of SlEGS was evaluated using ExPASy's ProtParam tool. Molecular weight was 33.93kDa and isoelectric point was 5.85 showing acidic nature. Other properties such as extinction coefficient, instability index, aliphatic index, and grand average hydropathy was also analyzed.

Assessment of Geothermal Power Generation Potential According to EGS Potential Protocol (EGS Potential Protocol에 따른 우리나라 지열발전 잠재량 산정)

  • Song, Yoonho;Baek, Seung-Gyun;Kim, Hyoung Chan;Lee, Tae Jong
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2011.11a
    • /
    • pp.144-144
    • /
    • 2011
  • We have estimated power generation potential in Korea following the recently announced EGS protocol. According to the protocol, we calculated the theoretical potential first, which assumes 30 year operation, minimum temperature being surface temperature+$80^{\circ}C$, depth range being from 3 km to 10 km. In this new assessment the in-land area was digitized by 1' by 1' blocks, which is much finer than suggestion of the protocol (5'by 5'). Thus estimated theoretical potential reaches 6,975 GWe which is 92 times of the total power generation capacity in 2010. In the estimation of technical potential, we limited the depth range down to 6.5 km, assumed recovery factor as 0.14 and also counted for temperature drawdown factor of $10^{\circ}C$ following the protocol. Accessible in-land area excluding steep mountains, residence and industrial region, wet area and others covers 40.7% of total area. Finally, we could come up with 19.6 GWe for technical potential, which would be 56 GWe if we do not account for the temperature drawdown factor. These are important results in that we made the first potential assessment for geothermal power generation.

  • PDF

Enhanced Geothermal System Case Study: The Soultz Project (EGS 지열발전 연구사례: The Soultz Project)

  • Lee, Tae Jong;Song, Yoonho
    • Tunnel and Underground Space
    • /
    • v.23 no.6
    • /
    • pp.561-571
    • /
    • 2013
  • Various experiences on enhanced geothermal system (EGS) has been accumulated from the Soultz project through various scientific experiments and research activities for more than 20 years since it started in the year of 1984 until the 1.5 MW Organic Rankine Cycle (ORC) binary power plant has been built up in Soultz-sous-$\hat{e}$ area, France. They have been applied to Cooper basin in Australia, Landau and Insheim in Germany and so forth. This report summaries the experiences from Soultz in the aspect of artificial reservoir creation, expecting to be helpful for reducing any trial and errors or unnecessary expenses in ongoing Korean EGS project in Pohang area, where the geological features are similar to Soultz area.

Estimating generation capacity of geothermal power generation pilot plant project (우리나라 지열발전 pilot plant 프로젝트의 발전량 추정)

  • Song, Yoonho;Lee, Tae Jong;Yoon, Woon Sang
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2011.05a
    • /
    • pp.197.1-197.1
    • /
    • 2011
  • Target generation capacity of geothermal power generation pilot plant project through the Enhanced Geothermal Systems (EGS) with a doublet system down to 5 km depth was estimated. Production and re-injection temperatures of geothermal fluid were assumed $160^{\circ}C$ and $60^{\circ}C$, respectively, based on reservoir temperature of $180^{\circ}C$ calculated from the geothermal gradient of $33^{\circ}C$ in Pohang area. In this temperature range, 0.11 of thermal efficiency of the binary generation cycle is a practical choice. Assuming flow rates of 40 kg/sec, which is possible in current EGS technology, gross power generation capacity is estimated to reach 1.848 MW. Net generation considering auxiliary power including pumping power for geothermal fluid and condensing (cooling) energy of working fluid can be 1.5 MW.

  • PDF

Research Background and Plan of Enhanced Geothermal System Project for MW Power Generation in Korea (MW급 EGS 지열발전 상용화 기술개발사업의 추진 배경 및 계획)

  • Yoon, Woon-Sang;Song, Yoon-Ho;Lee, Tae-Jong;Kim, Kwang-Yeom;Min, Ki-Bok;Cho, Yong-Hee;Jeon, Jong-Ug
    • Tunnel and Underground Space
    • /
    • v.21 no.1
    • /
    • pp.11-19
    • /
    • 2011
  • Geothermal energy is believed to be an important source among the renewable energy sources to provide the base load electricity. Although there has been a drastic increase in the use of geothermal heat pump in Korea, there is no geothermal power plant in operation in Korea. Fortunately, the first EGS (Enhanced Geothermal System) Project in Korea has started in Dec 2010. This five year project is divided into two stages; two years for exploration and drilling of 3 km depth to confirm the minimum target temperature of 100 degrees, and another three years composed drilling 5 km doublet, hydraulic stimulation of geothermal reservoir with expected temperature of 180 degrees (40 kg/s) and construction of MW geothermal power plant in the surface. This EGS project would be a landmark effort that invited a consortium of industry, research institutes and university with expertises in the fields of geology, hydrogeology, geophysics, geomechanics and plant engineering.

Case Study on Groß Schönebeck EGS Project Research in Germany (독일 그로스 쉐네벡 EGS 실증 프로젝트 연구사례)

  • Min, Ki-Bok;Park, Sehyeok;Zimmermann, Gunter
    • Tunnel and Underground Space
    • /
    • v.25 no.4
    • /
    • pp.320-331
    • /
    • 2015
  • This paper presents a case study of an enhanced geothermal system(EGS) demonstration project conducted in $Gro{\ss}$ $Sch{\ddot{o}}nebeck$, Northerm Germany, focusing on hydraulic stimulation. The project was conducted with doublet system in sandstone and volcanic formations at 4 - 4.4 km depth. Under normal faulting to strike-slip faulting stress regime, hydraulic stimulations were conducted at injection and production wells by massive waterfrac and gel-proppant fracturing. Injectivity index increased from $0.97m^3/(hr^*MPa)$ to $7.5m^3/(hr^*MPa)$ and productivity index increased from $2.4m^3/(hr^*MPa)$ to $10.1m^3/(hr^*MPa)$ by a series of hydraulic stimulations at both wells. After circulation tests through injection and production wells, however, productivity index decreased from $8.9m^3/(hr^*MPa)$ to $0.6m^3/(hr^*MPa)$ in two years. Slip tendency analysis for the stimulation in volcanic layer estimated the required pressure for shear slip and its preferred orientations and it showed reasonable match with actual stimulation results. Through the microseismicity observation for the stimulation of volcanic formation, only 80 seismic events with its moment magnitudes in -1.8<$M_W$<-1.0 were observed, which are unexpectedly low for EGS hydraulic stimulation.

Introduction to the first pilot plant project for geothermal power generation in Korea (국내 최초 지열발전 pilot plant 프로젝트 개요)

  • Yoon, Woon Sang;Lee, Tae Jong;Min, Ki-Bok;Kim, Kwang-Yeom;Jeon, Jongug;Cho, Yong-Hee;Song, Yoonho
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2011.05a
    • /
    • pp.196.2-196.2
    • /
    • 2011
  • 지구온난화와 화석연료 고갈에 대한 우려로 전세계적으로 신재생에너지의 개발 및 활용이 본격화되고 있다. 특히, 다양한 신재생에너지원 중에서 날씨 및 계절에 의한 영향, 기저부하 담당, 지상 점유 면적, 소음 등 생활환경 영향, 경제성 등을 고려할 때 지열에너지는 미래 청정에너지원로서 기대와 관심이 집중되고 있다. 화산이 존재하지 않는 우리나라에서의 지열발전은 거의 불가능한 것으로 인식되어 지금까지의 심부 지열에너지 개발 프로젝트는 대부분 지역난방, 시설영농 등 직접이용을 목표로 추진되어 왔다. 그러나, 2003년부터 한국지질자원연구원에서 수행한 포항 심부지열에너지 개발사업의 결과로 얻어진 다양한 지질학적/지열학적 증거들을 토대로 분석한 결과, 국내 일부 지역에서는 지하 5 km 심도에서 최대 약 $180^{\circ}C$의 지온이 예상되어 국내에서도 심부 지열에너지를 이용한 지열발전에 대한 가능성이 제기되어 왔다. 여기에, 유럽과 미국 그리고 호주 등 선진국을 중심으로 비화산 지역에서 지하 심부에 인공적으로 지열저류층(파쇄대)을 생성하고 이를 통해 열매체(물)를 순환시킴으로써 생산된 증기를 발전에 활용하는 EGS (Enhanced Geothermal System) 기술이 개발되고 몇몇 성공사례가 발표되었다. 또한, 이러한 기술개발에 힘입어 EGS 지열발전에 대한 선진국의 과감한 연구비 투자가 이어졌다. 이러한 기술적 배경에 발맞추어 우리나라에서도 2010년 12월에 EGS 지열발전 과제가 착수되었다. 이 프로젝트는 아시아에서는 최초로 수행되는 EGS 기술 개발과제로서 2015년까지 약 480억원의 R&D 예산을 투입하여 MW급의 지열발전 pilot plant의 구축을 목표로 하고 있다. 프로젝트가 성공적으로 추진될 경우 국내외적인 파급효과는 매우 클것이다. 특히 2015년까지 1.5 MW의 pilot plant의 구축이 성공적으로 추진될 경우 국내에서는 2017년까지 3 MW 이상, 2020년까지 20 MW이상, 2030년까지 200 MW 이상의 지열발전이 가능할 것으로 기대된다. 또한 축적된 기술개발 경험을 바탕으로 인도네시아, 필리핀 등의 해외의 지열발전 사업에도 진출할 수 있는 계기가 될 것이다. 프로젝트는 넥스지오를 주관기관으로 하고 한국지질자원연구원, 한국건설기술연구원 및 서울대학교 등의 지질자원 관련 연구 및 교육기관과 포스코, 이노지오테크놀로지 등의 산업체가 참여하여 컨소시엄 형태로 추진하고 있으며, 향후 관심있는 여러 기관 및 산업체의 지원과 참여를 기대한다.

  • PDF

Estimation of Theoretical and Technical Potentials of Geothermal Power Generation using Enhanced Geothermal System (우리나라 EGS 지열발전의 이론적 및 기술적 잠재량 평가)

  • Song, Yoon-Ho;Baek, Seung-Gyun;Kim, Hyoung-Chan;Lee, Tae-Jong
    • Economic and Environmental Geology
    • /
    • v.44 no.6
    • /
    • pp.513-523
    • /
    • 2011
  • We estimated geothermal power generation potential in Korea through Enhanced Geothermal System (EGS) technology following the recently proposed protocol which was endorsed by international organizations. Input thermal and physical data for estimation are density, specific heat and thermal conductivity measurements from 1,516 outcrop samples, 180 heat production, 352 heat flow, and 52 mean surface temperature data. Inland area was digitized into 34,742 grids of $1'{\times}1'$ size and temperature distribution and available heat were calculated for 1 km depth interval from 3 km down to 10 km. Thus estimated theoretical potential reached 6,975 GW which is 92 times total generation capacity of Korea in 2010. Technical potential down to 6.5 km and considering land accessibility, thermal recovery ratio of 0.14 and temperature drawdown factor of $10^{\circ}C$ was 19.6 GW. If we disregard temperature drawdown factor, which can be considered in estimating economic potential, the technical potential increases up to 56 GW.