• Title/Summary/Keyword: EGS

Search Result 100, Processing Time 0.035 seconds

Estimating generation capacity of geothermal power generation pilot plant project (우리나라 지열발전 pilot plant 프로젝트의 발전량 추정)

  • Song, Yoonho;Lee, Tae Jong;Yoon, Woon Sang
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2011.05a
    • /
    • pp.197.1-197.1
    • /
    • 2011
  • Target generation capacity of geothermal power generation pilot plant project through the Enhanced Geothermal Systems (EGS) with a doublet system down to 5 km depth was estimated. Production and re-injection temperatures of geothermal fluid were assumed $160^{\circ}C$ and $60^{\circ}C$, respectively, based on reservoir temperature of $180^{\circ}C$ calculated from the geothermal gradient of $33^{\circ}C$ in Pohang area. In this temperature range, 0.11 of thermal efficiency of the binary generation cycle is a practical choice. Assuming flow rates of 40 kg/sec, which is possible in current EGS technology, gross power generation capacity is estimated to reach 1.848 MW. Net generation considering auxiliary power including pumping power for geothermal fluid and condensing (cooling) energy of working fluid can be 1.5 MW.

  • PDF

Development of Response Spectrum Generation Program for Seismic Analysis of the Nuclear Equipment (원자력기기 내진해석응답스펙트럼 생성프로그램 개발)

  • Byun, Hoon-Seok;Kim, Yu-Chull;Lee, Joon-Keun
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2004.11a
    • /
    • pp.755-762
    • /
    • 2004
  • In our country, when the replacement for individual components of equipment in nuclear power plants is required, establishment of individual criteria i.e. Required Response Spectra(RRS) of seismic test/analysis for the component is very difficult because of the absence of Test Response Spectra(TRS) for the individual component to be replaced, from the existing qualification documents. In this case, it is required to perform the structural analysis for the nuclear equipment including the components to be replaced. After the structural analysis, Analysis Response Spectra(ARS) at the point of the component shall be generated and used for seismic test of the component. However, as of today, no standard program authorized for the response spectra generation by using the structural analysis exists in korea. Because of above reason, the STAR-Egs computer program was developed by using the method which calculates directly the expected response spectrum(frequency vs. acceleration type) of the selected points in the nuclear equipment with input spectrum(Required Response Spectra, RRS), based on the dynamic characteristics of the Finite Element(FE) model that is equivalent to the nuclear equipment. The STAR-Egs controls ANSYS/I-DEAS commercial software and automatically extract modal parameters of the FE model. The STAR-Egs calculates response spectrum using the established algorithm based on the extracted modal parameters, too. Reliance on the calculation result of the STAR-Egs was verified through comparison output with the result of MATLAB commercial software based on the identical algorithm. Moreover, actual seismic testing was performed as per IEEE344-1987 for the purpose of program verification by comparison of the FE analysis results.

  • PDF

A Study on the Spatial Resolution of Gas Detectors Based on EGS4 Calculations

  • Moon, B.S.;Han, S.H.;Kim, Y.K.;Chung, C.E.
    • Journal of Radiation Protection and Research
    • /
    • v.29 no.1
    • /
    • pp.25-31
    • /
    • 2004
  • Results of EGS4 based calculations to study the spatial resolution of gas detectors are described. The calculations include radial distribution of electrons generated by photons of various energies penetrating into variable thickness of Ar and Xe gas layers. Given a desired spatial resolution, the maximum allowed thickness of gas layer for each energy level is determined. In order to obtain 0.1mm spatial resolution, the maximum thickness for the Ar gas is found to be 2mm for photon energies below 14keV while the optimum energy of photons for Xe gas with the same thickness is about 45keV. The results of calculations performed to compare the number of electrons generated by CsI coated micro-channel plate and the number of electrons generated by the Ar and Xe gas layers are described. The results show that the number of electrons generated by the gases is about 10 times higher than the one generated by CsI coated micro-channel plate. A few sample gray scale images generated by these calculations are included.

A Class of Check Matrices Constructed from Euclidean Geometry and Their Application to Quantum LDPC Codes

  • Dong, Cao;Yaoliang, Song
    • Journal of Communications and Networks
    • /
    • v.15 no.1
    • /
    • pp.71-76
    • /
    • 2013
  • A new class of quantum low-density parity-check (LDPC) codes whose parity-check matrices are dual-containing matrices constructed based on lines of Euclidean geometries (EGs) is presented. The parity-check matrices of our quantum codes contain one and only one 4-cycle in every two rows and have better distance properties. However, the classical parity-check matrix constructed from EGs does not satisfy the condition of dual-containing. In some parameter conditions, parts of the rows in the matrix maybe have not any nonzero element in common. Notably, we propose four families of fascinating structure according to changes in all the parameters, and the parity-check matrices are adopted to satisfy the requirement of dual-containing. Series of matrix properties are proved. Construction methods of the parity-check matrices with dual-containing property are given. The simulation results show that the quantum LDPC codes constructed by this method perform very well over the depolarizing channel when decoded with iterative decoding based on the sum-product algorithm. Also, the quantum codes constructed in this paper outperform other quantum codes based on EGs.

Case Study on Groß Schönebeck EGS Project Research in Germany (독일 그로스 쉐네벡 EGS 실증 프로젝트 연구사례)

  • Min, Ki-Bok;Park, Sehyeok;Zimmermann, Gunter
    • Tunnel and Underground Space
    • /
    • v.25 no.4
    • /
    • pp.320-331
    • /
    • 2015
  • This paper presents a case study of an enhanced geothermal system(EGS) demonstration project conducted in $Gro{\ss}$ $Sch{\ddot{o}}nebeck$, Northerm Germany, focusing on hydraulic stimulation. The project was conducted with doublet system in sandstone and volcanic formations at 4 - 4.4 km depth. Under normal faulting to strike-slip faulting stress regime, hydraulic stimulations were conducted at injection and production wells by massive waterfrac and gel-proppant fracturing. Injectivity index increased from $0.97m^3/(hr^*MPa)$ to $7.5m^3/(hr^*MPa)$ and productivity index increased from $2.4m^3/(hr^*MPa)$ to $10.1m^3/(hr^*MPa)$ by a series of hydraulic stimulations at both wells. After circulation tests through injection and production wells, however, productivity index decreased from $8.9m^3/(hr^*MPa)$ to $0.6m^3/(hr^*MPa)$ in two years. Slip tendency analysis for the stimulation in volcanic layer estimated the required pressure for shear slip and its preferred orientations and it showed reasonable match with actual stimulation results. Through the microseismicity observation for the stimulation of volcanic formation, only 80 seismic events with its moment magnitudes in -1.8<$M_W$<-1.0 were observed, which are unexpectedly low for EGS hydraulic stimulation.

Introduction to the first pilot plant project for geothermal power generation in Korea (국내 최초 지열발전 pilot plant 프로젝트 개요)

  • Yoon, Woon Sang;Lee, Tae Jong;Min, Ki-Bok;Kim, Kwang-Yeom;Jeon, Jongug;Cho, Yong-Hee;Song, Yoonho
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2011.05a
    • /
    • pp.196.2-196.2
    • /
    • 2011
  • 지구온난화와 화석연료 고갈에 대한 우려로 전세계적으로 신재생에너지의 개발 및 활용이 본격화되고 있다. 특히, 다양한 신재생에너지원 중에서 날씨 및 계절에 의한 영향, 기저부하 담당, 지상 점유 면적, 소음 등 생활환경 영향, 경제성 등을 고려할 때 지열에너지는 미래 청정에너지원로서 기대와 관심이 집중되고 있다. 화산이 존재하지 않는 우리나라에서의 지열발전은 거의 불가능한 것으로 인식되어 지금까지의 심부 지열에너지 개발 프로젝트는 대부분 지역난방, 시설영농 등 직접이용을 목표로 추진되어 왔다. 그러나, 2003년부터 한국지질자원연구원에서 수행한 포항 심부지열에너지 개발사업의 결과로 얻어진 다양한 지질학적/지열학적 증거들을 토대로 분석한 결과, 국내 일부 지역에서는 지하 5 km 심도에서 최대 약 $180^{\circ}C$의 지온이 예상되어 국내에서도 심부 지열에너지를 이용한 지열발전에 대한 가능성이 제기되어 왔다. 여기에, 유럽과 미국 그리고 호주 등 선진국을 중심으로 비화산 지역에서 지하 심부에 인공적으로 지열저류층(파쇄대)을 생성하고 이를 통해 열매체(물)를 순환시킴으로써 생산된 증기를 발전에 활용하는 EGS (Enhanced Geothermal System) 기술이 개발되고 몇몇 성공사례가 발표되었다. 또한, 이러한 기술개발에 힘입어 EGS 지열발전에 대한 선진국의 과감한 연구비 투자가 이어졌다. 이러한 기술적 배경에 발맞추어 우리나라에서도 2010년 12월에 EGS 지열발전 과제가 착수되었다. 이 프로젝트는 아시아에서는 최초로 수행되는 EGS 기술 개발과제로서 2015년까지 약 480억원의 R&D 예산을 투입하여 MW급의 지열발전 pilot plant의 구축을 목표로 하고 있다. 프로젝트가 성공적으로 추진될 경우 국내외적인 파급효과는 매우 클것이다. 특히 2015년까지 1.5 MW의 pilot plant의 구축이 성공적으로 추진될 경우 국내에서는 2017년까지 3 MW 이상, 2020년까지 20 MW이상, 2030년까지 200 MW 이상의 지열발전이 가능할 것으로 기대된다. 또한 축적된 기술개발 경험을 바탕으로 인도네시아, 필리핀 등의 해외의 지열발전 사업에도 진출할 수 있는 계기가 될 것이다. 프로젝트는 넥스지오를 주관기관으로 하고 한국지질자원연구원, 한국건설기술연구원 및 서울대학교 등의 지질자원 관련 연구 및 교육기관과 포스코, 이노지오테크놀로지 등의 산업체가 참여하여 컨소시엄 형태로 추진하고 있으며, 향후 관심있는 여러 기관 및 산업체의 지원과 참여를 기대한다.

  • PDF

Estimation of Theoretical and Technical Potentials of Geothermal Power Generation using Enhanced Geothermal System (우리나라 EGS 지열발전의 이론적 및 기술적 잠재량 평가)

  • Song, Yoon-Ho;Baek, Seung-Gyun;Kim, Hyoung-Chan;Lee, Tae-Jong
    • Economic and Environmental Geology
    • /
    • v.44 no.6
    • /
    • pp.513-523
    • /
    • 2011
  • We estimated geothermal power generation potential in Korea through Enhanced Geothermal System (EGS) technology following the recently proposed protocol which was endorsed by international organizations. Input thermal and physical data for estimation are density, specific heat and thermal conductivity measurements from 1,516 outcrop samples, 180 heat production, 352 heat flow, and 52 mean surface temperature data. Inland area was digitized into 34,742 grids of $1'{\times}1'$ size and temperature distribution and available heat were calculated for 1 km depth interval from 3 km down to 10 km. Thus estimated theoretical potential reached 6,975 GW which is 92 times total generation capacity of Korea in 2010. Technical potential down to 6.5 km and considering land accessibility, thermal recovery ratio of 0.14 and temperature drawdown factor of $10^{\circ}C$ was 19.6 GW. If we disregard temperature drawdown factor, which can be considered in estimating economic potential, the technical potential increases up to 56 GW.

Research Background and Plan of Enhanced Geothermal System Project for MW Power Generation in Korea (MW급 EGS 지열발전 상용화 기술개발사업의 추진 배경 및 계획)

  • Yoon, Woon-Sang;Song, Yoon-Ho;Lee, Tae-Jong;Kim, Kwang-Yeom;Min, Ki-Bok;Cho, Yong-Hee;Jeon, Jong-Ug
    • Tunnel and Underground Space
    • /
    • v.21 no.1
    • /
    • pp.11-19
    • /
    • 2011
  • Geothermal energy is believed to be an important source among the renewable energy sources to provide the base load electricity. Although there has been a drastic increase in the use of geothermal heat pump in Korea, there is no geothermal power plant in operation in Korea. Fortunately, the first EGS (Enhanced Geothermal System) Project in Korea has started in Dec 2010. This five year project is divided into two stages; two years for exploration and drilling of 3 km depth to confirm the minimum target temperature of 100 degrees, and another three years composed drilling 5 km doublet, hydraulic stimulation of geothermal reservoir with expected temperature of 180 degrees (40 kg/s) and construction of MW geothermal power plant in the surface. This EGS project would be a landmark effort that invited a consortium of industry, research institutes and university with expertises in the fields of geology, hydrogeology, geophysics, geomechanics and plant engineering.