• Title/Summary/Keyword: Dredging work

Search Result 57, Processing Time 0.022 seconds

Characteristics of Hazardous Factors Regarding Chemical(Liquid Lime) Storage Tank Dredging Workers (약품(액상소석회) 저장조 준설 작업자의 유해인자 특성 평가 사례)

  • Je-Hun Kim;Ki-Youn Kim
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.34 no.1
    • /
    • pp.1-7
    • /
    • 2024
  • Objectives: The study was performed to investigate characteristics of hazardous factors regarding chemical(liquid lime) tank dredging workers by case survey. Methods: Field data such as working condition, MSDS and respirators applied to chemical tank dredging work were analyzed and the work environmental factors of noise and indoor air quality were measured to compare existing data with actual work situations. Results: No health hazards to workers due to working conditions were confirmed during dredging work inside the chemical storage tank. All air quality measurement data during dredging work satisfied the management standards, and there were no by-products. During dredging work, there was a significant change in noise depending on the type of work, but considering the noise reduction rate(NRR) of the earplugs worn by workers, there was no actual health hazard due to noise exposure. Conclusions: A fit test for respirator and the expiration date of the safety helmet should be observed to ensure an appropriate level of safety and health for dredging workers in the chemical storage tank.

Evaluation and management of work process in dredger using ECDIS (ECDIS에 의한 준설선의 작업공정 관리 및 평가)

  • Lee, Dae-Jae
    • Journal of the Korean Society of Fisheries and Ocean Technology
    • /
    • v.43 no.3
    • /
    • pp.212-221
    • /
    • 2007
  • This paper describes on the evaluation and management of work process in suction hopper dredger and grab bucket dredger as an application of a PC-based ECDIS system. The dynamic tracking of dredging bucket and the data logging of grab dredging information were performed by using the grab dredging vessel "Kunwoong G-18". The position and route tracking of the dredger moving toward the ocean dumping site of dredged material was performed by using the hopper dredging vessel "Samyang-7". The evaluation of wok process in the dredging field, for grab dredger, was continuously carried out on January to May, 2006, in Incheon Hang and for hopper dredger, on July to December, 2003, in Busan Hang, Korea. The dredging information, such as dredger's position, heading, dredging depth and route track which was individually time stamped during the dredging operation, was automatically processed in real-time on the ECDIS and displayed simultaneously on the S-57 ENC chart. From these results, we conclude that the ECDIS system can be applied as a tool in order to manage the work process during the dredging operation, and also in order to generate the factual record of the dredging activities that is sufficient for dredging inspector to accurately evaluate the contract performance even in the absence of a full-time onboard inspector.

A Study on the Development of Dredge Process Management System (준설공정관리시스템 개발에 관한 연구)

  • 정대득;이중우;조증언
    • Journal of Korean Port Research
    • /
    • v.15 no.1
    • /
    • pp.75-85
    • /
    • 2001
  • Accuracy of dredging processes depends on the types of equipment used, the sediments encountered, whether the work to be performed is new or maintenance dredging, pre- and post-hydrographic surveying and so forth. Among those, position surveying accuracy which is directly determined by the control of the dredge's position and depth surveying accuracy being surveyed at the dredging point during dredging work are important factors. The purpose of this study is to develop 'Dredge Management System'for Grab dredge which is composed of 4 sub-system using LADGPS for dredge position determining system and dredging point determining system, tide gauge system and optical sensor for depth determining system and GIS and ENC for total management system. This system is installed on the grab dredge 'EUNJIN G-18'and applied to anchorage dredging work. at Pohang Harbor. The results revealed that this system is easy to operate, achieves good accuracy with only 45cm unevenness, reduces working period by 22 percent and saves cost 16.6 percent.

  • PDF

Evaluation of Waterway Dredging Work using Spud Control System (스퍼드제어시스템을 이용한 항로준설작업의 평가)

  • Lee, Joong-Woo;Jeong, Dae-Deuk;Cho, Jueng-Eon;Oh, Dong-Hoon;Keum, Dong-Ho
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • v.29 no.1
    • /
    • pp.263-271
    • /
    • 2005
  • The most important point when we engage on waterway dredging work is supplying safe navigational passage to the vessels underway by narrowing dredge work area and removing submerged dangers. In order to meet this end it is neccessary to use auxiliary equipment for shifting actively and mooring and adopt automation of dredging work by integrating information on real time position, dredging depth, and work information. The danger with a spud control system in this study, by the way, is able to employed on continuous dredging work with the narrowest working area allowing wide and safe passages to vessels underway, by moving the dredger to the working zone with the spud controlled automatically. Furthermore, it has been improved definitely compared with the existing dredging proccess management system such that it shows the track of spud and working depth on the electronic navigation chart of window, together with the final outcome of dredging work. The test dredging work at the entrance of Busan North Port for system evaluation showed that actual working time available was twice of the one by the existing anchor system, and that it reduced 38% of time for preparation work and one man power.

  • PDF

Evaluation of Waterway Dredging Work using Spud Dredge Process Management System (스퍼드 준설선 공정관리시스템을 이용한 항로준설작업의 평가)

  • Lee Joong-Woo;Jeong Dae-Deuk;Cho Jueng-Eon;Kim Ju-Young;Oh Dong-Hoon
    • Journal of Navigation and Port Research
    • /
    • v.29 no.5 s.101
    • /
    • pp.395-402
    • /
    • 2005
  • The most important point when we engage on waterway dredging work is supplying safe navigational passage to the vessels underway by narrowing dredge work area and removing submerged dangers. In order to meet this end it is necessary to use auxiliary equipment for shifting actively and mooring and adopt automation of dredging work by integrating information on real time position, dredging depth, and work information. The dredger with a spud control system in this study, by the way, is able to employed on continuous dredging work with the narrowest working area allowing wide and safe passages to vessels underway, by moving the dredger to the working zone with the spud controlled automatically. Furthermore, it has been improved definitely compared with the existing dredging process management system such that it shows the track of spud and working depth on the electronic navigation chart of window, together with the final outcome of dredging work. The test dredging work at the entrance of Busan North Port for system evaluation showed that actual working time available was twice of the one by the existing anchor system, and that it reduced $38\%$ of time for preparation work and one man power.

A Case study of Ground Treatment for Container Terminal Site Formation with Full Dredging and Replacement Method (완전준설 치환공법에 의한 컨테이너 부지조성 사례)

  • Hong, Eui;Sim Dong-Hyun
    • 기술발표회
    • /
    • s.2006
    • /
    • pp.235-247
    • /
    • 2006
  • A ground treatment work for Hongkong container terminal yard is reported as a case study of site formation work with full dredging and replacement method. Ground treatment work adopting surcharge and deep compaction (vibroflotation) were applied to improve the sand creep potential. The sand creep parameter of 0 25% was assumed in design stage and improved up to 0.05% and 0.02% after surcharge and deep compaction respectively

  • PDF

The Near-field Behavior of Effluent discharged from Confined Disposal Facility (제한투기시설에서 배출되는 여수의 근역거동)

  • 정대득;이중우
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2000.11a
    • /
    • pp.95-107
    • /
    • 2000
  • The primary purpose of dredging work is to maintain navigational readiness and to increase environmental amenity, so that the dredging project which is composed of excavating, removing, transporting, storing and disposing dredged material must be carefully managed to insure that dredging works are completed in a cost-effective and environmentally safe manner. The most important point in dumping operations is an estimating and reducing the impacts of discharges at the dumping area. One of the most effective method for the reduction of ecological impacts at dumping area is using the schematic process composed of the sophisticated plan, precise work and predicting/reducing the impacts based on the numerical model and field observation. In this study, the numerical model is used to predict the near-field spatial fate and begavior of effluent discharged from Confined Dumping Facility(CDF) located near coastal area. To to this purpose, reappearing of tidal current was preceded. The model is then applied to Mokpo harbor, where capital dredging and maintenance dredging are conducted simultaneously and the CDF is under construction;. In the series of model case study, we found that the near-field behavior of effluent discharged from CDF was governed by the receiving water condition, outfall geometry, characteristics of efflent and CDF operating conditions.

  • PDF

The Behavior of Effluent Discharged from the Confined Dumping Facility (제한투기시설에서 배출되는 여수의 거동)

  • 정대득;이중우
    • Journal of Korean Port Research
    • /
    • v.14 no.4
    • /
    • pp.429-439
    • /
    • 2000
  • The primary purpose of dredging work is to maintain navigational readiness and to increase environmental amenity. Therefore the dredging project, which is composed of excavating, removing, transporting and storing or dumping dredged material, must be carefully managed to insure that dredging works are completed in a cost-effective and environmentally safe method. The most important point in dumping operations is evaluating and decreasing the impacts of dumping works at the dumping area. One of the most effective method for this purpose is using the schematic process composed of the sophisticate plan, precise work and predicting/reducing the impacts based on an numerical model being closely linked with field observation. In this study, a numerical model is used to predict the spatial transport and fate of the effluent discharged from the confined dumping facility(CDF) located at a coastal area. To achive this purpose, numerical models were used for reappearing the tidal current of concerned area. These models were then applied to Mokpo harbpr where capital dredging and maintenance dredging are being conducted simultaneously and the CDF is under construction. In series of model case study, we found that the effluent discharged from CDF was governed by the receiving water condition and outfall geometry, so that limit of near-field was 14∼500 meter down stream and 4∼150 meter in transverse direction. dilution ranged from 1.1 to 8.2 on the cases. Long-term diffusion characteristics was governed by the dilution rate during near-field behavior, ambient conditions and CDF operation modes.

  • PDF

A Study on Mixing Behavior of Dredging Turbidity Plume Using Two-Dimensional Numerical Model (이차원 수치모형을 이용한 준설 탁도플륨의 혼합거동 연구)

  • Park, Jae Hyeon;Kim, Young Do;Lee, Man Soo
    • Journal of Wetlands Research
    • /
    • v.15 no.1
    • /
    • pp.59-69
    • /
    • 2013
  • The numerical simulations were performed to analyze the advection-diffusion processes of dredging-induced turbidity plume using RMA2 and RMA4 models in Bunam reservoir, Seosan, Chungnam. Field survey was also performed to measure the turbidity using the multi water quality monitoring system (YSI6600EDS). In the field survey, the vertical and horizontal distributions of the turbidity were measured during the dredging operation in Bunam reservoir. RMA2 model was used to simulate the velocity distributions in both the whole domain and the 2nd part of Bunam reservoir. RMA4 model was also used to simulate the concentration distribution in only the 2nd part of Bunam reservoir, where the dredging work were conducted. The comparison of the simulation results with the field data for the advection-diffusion of the turbidity plume using the concentration ratio concepts shows that the numerical model can be applied to analyze the environmental impact of dredging works.