• Title/Summary/Keyword: Dredging

Search Result 431, Processing Time 0.03 seconds

Water Quality Impact Assessment Due to Dredging in the Downstream of the Nakdong River (낙동강 하류부에서의 오니준설에 따른 수질영향 분석)

  • Cho, Hong-Je;Han, Kun-Yeun;Kim, Sang-Ho
    • Water for future
    • /
    • v.29 no.3
    • /
    • pp.177-186
    • /
    • 1996
  • QUAL2E model was applied to assess the water quality variations due to dredging of the bottom deposit in the downstream of the Nakdong River. A variedflow analysis was performed for the reach of Namji to Nakdong Estuary to estimate the hydraulic parameters. BFGS (Broyden-Fletcher-Goldfarb-Shanno) method was applied to determine the optimum reaction parameters and model verrification was performed based on these. Water quality modeling of dredging effects for BOD and DO in the reach was performed under low and average flow conditions and alternatives. It revealed that dredging had significant effedcts on the improvement of water quality in the reach.

  • PDF

Safe Navigation Plan for Dredging Operations to build Sunken Tunnel for Access Road between Busan-Geoje (부산-거제간 연결도로 침매터널공사의 준설작업에 따른 안전통항방안)

  • Kim, Jung-Hoon;Gug, Seung-Gi
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • v.1
    • /
    • pp.509-514
    • /
    • 2006
  • This research does by purpose that present safe navigation plan for ships during doing dredging construction with dredger crossing waterway of Gadeok. Dredging operations need to build sunken tunnel that cross the bottom of the sea under waterway of Gadeok for access road construction between Busan- Geoje. Accordingly, dredger must cross and dredge waterway of Gadeok fatally. There is possibility of marine accident of collision for latent danger situation of ships to navigate waterway of Gadeok relatively. Therefore, safe navigation plan of ship is groped in reply and its countermeasure is presented.

  • PDF

Safe Navigation Plan for Dredging Operations to build Sunken Tunnel for Access Road between Busan-Geoje (부산-거제간 연결도로 침매터널공사의 준설작업에 따른 안전통항방안)

  • Kim, Jung-Hoon;Gug, Seung-Gi
    • Journal of Navigation and Port Research
    • /
    • v.30 no.10 s.116
    • /
    • pp.825-831
    • /
    • 2006
  • This research does by purpose that present safe navigation plan for ships during doing dredging construction with dredger crossing waterway of Gadeok Dredging operations need to build sunken tunnel that cross the bottom of the sea under waterway of Gadeok for access road construction between Busan- Geoje. Accordingly, dredger must cross and dredge waterway of Gadeok fatally. There is possibility of marine accident of collision for latent danger situation of ships to navigate waterway of Gadeok relatively. Therefore, safe navigation plan of ship is groped in reply and its countermeasure is presented. Firstly, navigating traffic in daytime was forecasted less than 20% of its maximum capacity through estimating the traffic volume and traffic congestion The proposal was presented to execute dredging operations in three-step and to establish temporary waterway after reviewing waterway design principles. The role of VTS center was emphasized in the new Busan Port, lastly.

Modeling for Prediction of Water Quality According to Dredging Operation (퇴적물 준설에 따른 수환경 영향 예측 모의)

  • Ahn, Jae-Hwan;Kim, Mee-Kyung;Lee, Mi-Kyung;Hwang, Byung-Gi
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.27 no.11
    • /
    • pp.1228-1237
    • /
    • 2005
  • In order to predict the long-term effects of pollutants in sediment on the water quality and the improvement of water quality according to dredging operation, models applied to decide the location and the propriety of dredging were developed. At first, the area was divided into several segments and the developed model was applied to simulate the behaviors of contaminants in an aquatic environment by using estimated parameters. And then through the sensitivity analysis between parameters, the optimum values were determined. The long-term modelling in the area A forecasted that PCBs concentration in the hot spot was decreased from $3.1\;{\mu}g/L$ to $2.4\;{\mu}g/L$ in 30 years. Contaminants in sediment as a source of water pollution did not reduce remarkably in the long run. Therefore it is difficult to expect the improvement of water qualities without the fundamental isolation of contaminants from sediment. It is considered that the selective dredging in the spot improves the water quality consequently.

An Analysis on the Characteristics of Separation Zone Due to a Bed Discordance at Confluence (합류부 하상고 불일치에 의한 분리구역 특성분석)

  • Choi, Heung Sik;Mo, Sun Jea
    • Journal of Korea Water Resources Association
    • /
    • v.48 no.8
    • /
    • pp.625-634
    • /
    • 2015
  • The diverse patterns of separation zone according to the marked bed discordance by dredging at confluence in addition to the confluence angle of tributary and discharge ratio between tributary and main channels have been analyzed by CCHE2D model simulation. The separation zone is defined by inside of zero velocity boundary at down-stream of confluence. The separation zone dose not formed at the $30^{\circ}$ of confluence angle of tributary. The size of separation zone increases as the discharge ratio and confluence angle increase in general. The separation zone decreases as the dredging depth increases which shows the relative momentum reduction compared by the flow volume increasing by dredging at confluence. The contraction factor with the variation of confluence angle and discharge ratio has been investigated and confirmed the corresponding conveyance decreasing results in backwater effect. The regression equation of shape factor with confluence angle and discharge and dredging depth ratios has been suggested.

Phytoremediation of Heavy-Metal-Contaminated Soil in a Reclaimed Dredging Area Using Alnus Species

  • Lee, Deok-Beom;Nam, Woong;Kwak, Young-Se;Cho, Nam-Hoon;Lee, Sang-Suk
    • Journal of Ecology and Environment
    • /
    • v.32 no.4
    • /
    • pp.267-275
    • /
    • 2009
  • To investigate the possible applications of plants to remediate heavy-metal-contaminated soil, a pilot experiment was performed for four years in a reclaimed dredging area using two Alnus species, i.e., Alnus firma and Alnus hirsuta. In a comparison of phytomass of the two species at two different planting densities, the phytomass of Alnus planted at low density was twice as high as that of Alnus planted at high density after four years. The Alnus species showed active acclimation to the heavy-metal-contaminated soil in a reclaimed dredging area. A. hirsuta showed greater accumulation of phytomass than A. firma, indicating that it is the better candidate for the phytoremediation of heavy-metal-contaminated soils. In the pilot system, Alnus plants took metals up from the soil in the following order; Pb > Zn > Cu > Cr > As > Cd. Uptake rates of heavy metals per individual phytomass was higher for Alnus spp. planted at low density than those planted at high density in the pilot system. Low plant density resulted in higher heavy metal uptake per plant, but the total heavy metal concentration was not different for plants planted at low and high density, suggesting that the plant density effect might not be important with regard to total uptake by plants. The quantity of leached heavy metals below ground was far in excess of that taken up by plants, indicating that an alternative measurement is required for the removal of heavy metals that have leached into ground water and deeper soil. We conclude that Alnus species are potential candidates for phytoremediation of heavy-metal- contaminated surface soil in a reclaimed dredging area.

An Analysis for the Characteristics of Headward Erosion and Separation Zone due to Bed Discordance at Confluence (합류부 하상고 불일치에 의한 두부침식 및 분리구역 특성분석)

  • Choi, Heung Sik;Mo, Sun Jea;Lee, Sam Hee
    • Journal of Korea Water Resources Association
    • /
    • v.48 no.11
    • /
    • pp.879-889
    • /
    • 2015
  • The pattern of headward erosion at tributary and the separation zone formation in a loosed bed at confluence according to the confluence angle, discharge ratio, and dredging depth ratio have been analyzed. The separation zone is defined the inside of zero velocity boundary at downstream of confluence. The limit of separation zone occurrence is presented with dredging depth ratio. The propagation length of knickpoint increases as the confluence angle, discharge ratio, and dredging depth ratio increase in general and its regression equation has been suggested. The length and width ratios of separation zone in a loosed bed increase as discharge ratio and confluence angle increase as well as in a fixed bed. The length ratio decreases and the width ratio increases as dredging depth ratio increases results in great increase of shape factor and backwater rise by the conveyance reduction at confluence. The regression equation of shape factor with confluence angle, discharge ratio, and dredging depth ratio has been suggested.

Changes of River Morphology in the Mid-lower Part of Nakdong River Basin after the 4 Large River Project, South Korea (4대강 사업 후 낙동강 중·하류의 하중도와 제외지 지형변화)

  • Im, Ran-Young;Kim, Ji Yoon;Choi, Jong-Yun;Do, Yuno;Joo, Gea-Jae
    • Korean Journal of Ecology and Environment
    • /
    • v.48 no.3
    • /
    • pp.188-194
    • /
    • 2015
  • River channel dredging and riparian development have been influenced morphology and quantity of natural river habitat. We compared distribution of riverside land and alluvial island in the Nakdong River with field survey and remote sensing analysis after the 4 Large River Project in South Korea. We digitized geomorphological elements, includes main channel, riverside land, and alluvial island by using georeferenced aerial photos taken in pre-dredging (2008) and post-dredging (2012) periods. Field survey was followed in 2012 for a ground truth of digitized boundaries and identification of newly constructed wetland types such as pond, channel, branch, and riverine type. We found that during the dredging period, riverside land and alluvial island were lost by 20.2% and 72.7%, respectively. Modification rate of riverside land was higher in the section of river kilometer 50~90, 140~180, and 210~270. Alluvial island had higher change rate in the section of river kilometer 50~70, 190~210, and 270~310. Average change rate for the riverside land and alluvial island was $-1.02{\pm}0.14km^2{\cdot}10km^{-1}$ and $-0.05{\pm}0.05km^2{\cdot}10km^{-1}$, respectively. Channel shaped wetlands (72.5%) constituted large portion of newly constructed wetlands.

Numerical Modeling for Sedimentation Characteristics of the Lower Nakong River and Sediment Dredging Effects at the Nakdong River Estuary Barrage (낙동강 하류의 유사특성과 낙동강하구둑 준설효과에 관한 수치모의 연구)

  • Ji, Un;Julien, Pierre Y.;Park, Sangkil;Kim, Byungdal
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.4B
    • /
    • pp.405-411
    • /
    • 2008
  • The Nakdong River Estuary Barrage (NREB) was constructed in 1987 to prevent saltwater intrusion and to provide the sustainable water supply in the upstream channel. Sediment dredging has been conducted to eliminate deposited sediments in the approached upstream channel of the NREB. Fluvial changes and sedimentation problems have been continued due to urbanization and development in the watershed as well as construction of the NREB. However, the sufficient field monitoring and researches for sedimentation characteristics and bed changes have not been performed after construction of the NREB. Therefore, bed elevation changes and seasonal sediment concentration distribution were analyzed using the quasi-steady state model with historical field data in this study. The water surface elevation changes with and without sediment dredging operation were calculated using the developed quasi-steady state model and finally the sediment dredging effects were evaluated.

Development Of A Windows-Based Predictive Model For Estimating Sediment Resuspension And Contaminant Release From Dredging Operations

  • Je, Chung-Hwan;Kim, Kyung-Sub
    • Water Engineering Research
    • /
    • v.1 no.2
    • /
    • pp.137-146
    • /
    • 2000
  • A windows-based software package, named DREDGE, is developed for estimating sediment resuspension and contaminant release during dredging operations. DREDGE allows user to enter the necessary dredge information, site characteristics, operational data, and contaminant characteristics, then calculates an array of concentration using the given values. The program mainly consists of the near-field models, which are obtained empirically, for estimating sediment resuspension and the far-field models, which are obtained analytically, for suspended sediment transport. A linear equilibrium partitioning approach is applied to estimate particulate and dissolved contaminant concentrations. This software package which requires only a minimal amount of data consists of three components; user input, tabular output, and graphical output. Combining the near-field and far-field models into a user-friendly windows-based computer program can greatly save dredge operator's, planners', and regulators' efforts for estimating sediment transports and contaminant distribution.

  • PDF