• Title/Summary/Keyword: Dredging

Search Result 431, Processing Time 0.033 seconds

Diffusion of the Suspended Matter Caused by Dredging and the Effect of the Single Silt Protector (준설공사시 발생하는 부유물질의 확산 및 단일오탁방지막의 효과분석)

  • Kim, Kye-Young;Chung, Jong-Yul
    • Journal of Ocean Engineering and Technology
    • /
    • v.12 no.3 s.29
    • /
    • pp.1-8
    • /
    • 1998
  • The purpose of this study is to determine the distribution of the suspended matter caused by dredging at the northeastern part of Kwangyang Bay and to determine the effect of the single silt protector for it. According to the direction of the tidal current, six sampling stations were chosen from the dredging site to the southeast. At the high tide, the high concentration of the suspended matter was observed below the mid-depth near the dredging site. As the tidal currents were stronger. its concentrations below the mid-depth at the inner stations of the single silt protector were rapidly increased, but those of the outer stations did not show any significant change. The concentrations at the inner stations of the silt protector at that time were from 20~140mg/l and those of the outer stations, which was only about 30 m apart from the inner station, were from 20~30mg/l. It suggests that the large amount of suspended matter caused by dredging were moved to the inner stations near the silt protector at the ebb tide and that the silt protector is very effective for the suspended matter.

  • PDF

The Behavior of Effluent Discharged from the Confined Dumping Facility (제한투기시설에서 배출되는 여수의 거동)

  • 정대득;이중우
    • Journal of Korean Port Research
    • /
    • v.14 no.4
    • /
    • pp.429-439
    • /
    • 2000
  • The primary purpose of dredging work is to maintain navigational readiness and to increase environmental amenity. Therefore the dredging project, which is composed of excavating, removing, transporting and storing or dumping dredged material, must be carefully managed to insure that dredging works are completed in a cost-effective and environmentally safe method. The most important point in dumping operations is evaluating and decreasing the impacts of dumping works at the dumping area. One of the most effective method for this purpose is using the schematic process composed of the sophisticate plan, precise work and predicting/reducing the impacts based on an numerical model being closely linked with field observation. In this study, a numerical model is used to predict the spatial transport and fate of the effluent discharged from the confined dumping facility(CDF) located at a coastal area. To achive this purpose, numerical models were used for reappearing the tidal current of concerned area. These models were then applied to Mokpo harbpr where capital dredging and maintenance dredging are being conducted simultaneously and the CDF is under construction. In series of model case study, we found that the effluent discharged from CDF was governed by the receiving water condition and outfall geometry, so that limit of near-field was 14∼500 meter down stream and 4∼150 meter in transverse direction. dilution ranged from 1.1 to 8.2 on the cases. Long-term diffusion characteristics was governed by the dilution rate during near-field behavior, ambient conditions and CDF operation modes.

  • PDF

The Estimation of Hopper Dredging Capacity by Combination of DGPS and Echo Sounder (DGPS/Echo Sounder 조합에 의한 호퍼준설량 산정)

  • Kim Jin Soo;Seo Dong Ju;Lee Jong Chool
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.23 no.1
    • /
    • pp.39-47
    • /
    • 2005
  • In this study, three-dimensional information of submarine topography acquired by assembling DGPS method and echo sounder which mainly used in the marine survey. Moreover, the hopper dredging capacity in harbor public affair has been calculated by utilizing kriging, radial basis function and nearest neighbor interpolation. Also, utilization of DGPS/Echo sounder method in calculation of the dredging capacity have been confirmed by comparing and analyzing the hopper dredging capacity and the actual one as per each interpolation. According to this comparison result, in case of applying kriging interpolation, some 1.89% of error rate has been shown as difference of the contents is 15,364 ㎥ and in case of applying radial basis function interpolation and nearest neighbor interpolation, 3.9% and 4.4% of error rates have respectively shown. In case the study for application of the proper interpolation as per characteristics of submarine topography, is preceded in calculation of the dredging capacity relevant to harbor public affairs, it is expected that more speedy and correct calculation for the dredging capacity can be made.

An Analysis of Accuracy for Submarine Topographic Information by Interpolation Method (보간기법에 따른 해저지형의 정확도 분석)

  • Kim Ga-Ya;Moon Doo-Youl;Seo Dong-Ju
    • Journal of Ocean Engineering and Technology
    • /
    • v.20 no.3 s.70
    • /
    • pp.67-76
    • /
    • 2006
  • Three-dimensional information of submarine topography was acquired by assembling DGPS and Echo Sounder, which is mainly used in the marine survey. However, the features of submarine topography, derived according to mechanical data, were confirmed using human eyes. Because the dredging capacity using a submarine surveying data influences harbor public affairs, analysis and the process method of surveying data is a very special element in construction costs. In this study, information on submarine topography is acquired by assembling DGPS and Echo Sounder. Moreover, the dredging capacity in harbor public affairs has been analyzed by the interpolation method: inverse distance to a power, kriging, minimum curvature, nearest neighbor, and radial basis function. Also, utilization of DGPS and Echo Sounder method in calculation of the dredging capacity have been confirmed by comparing and analyzing the dredging capacity and the actual one, as per each interpolation. According to this comparison result, in the case of applying Radial basis function interpolation and Kriging, 3.94 % and 4.61 % of error rates have been shown, respectively. In the case of the study for application of the proper interpolation, as per characteristics of submarine topography, is preceded in calculation of the dredging capacity relevant to harbor public affairs, it is expected that more speedy and correct calculation for the dredging capacity can be made.

The Characteristics of Sedimentation-Consolidation and Surface Strength for Dredging and Landfill Areas in Each Coast (해역별 준설토의 침강압밀 및 매립지 표층강도 특성)

  • Lee, Sangwoong;Gu, Bonhyo;Choi, Chaseok;Lee, Junho
    • Journal of the Korean GEO-environmental Society
    • /
    • v.16 no.7
    • /
    • pp.15-22
    • /
    • 2015
  • This study gives the characteristics of sedimentation-consolidation and surface strength for dredging and landfill areas in each coast. For the analysis of the sedimentation-consolidation characteristics, the column tests were performed and the results were compared with existing various literatures and design reports for dredged soil disposal. The surface strength of landfill soils of west and south coast were investigated by using the portable cone tester. As a results of analysis, the coefficient of sedimentation-consolidation on south coastal dredging soils is more sensitive with variation of initial water contents than on the west coastal dredging soils. And the surface strength of the dredging landfills is a higher in the west coast than in the south coast. Finally, the results of this study will be utilized as a basis data for analysis and design in the field of dredging and landfill.

Evaluation of Waterway Dredging Work using Spud Control System (스퍼드제어시스템을 이용한 항로준설작업의 평가)

  • Lee, Joong-Woo;Jeong, Dae-Deuk;Cho, Jueng-Eon;Oh, Dong-Hoon;Keum, Dong-Ho
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • v.29 no.1
    • /
    • pp.263-271
    • /
    • 2005
  • The most important point when we engage on waterway dredging work is supplying safe navigational passage to the vessels underway by narrowing dredge work area and removing submerged dangers. In order to meet this end it is neccessary to use auxiliary equipment for shifting actively and mooring and adopt automation of dredging work by integrating information on real time position, dredging depth, and work information. The danger with a spud control system in this study, by the way, is able to employed on continuous dredging work with the narrowest working area allowing wide and safe passages to vessels underway, by moving the dredger to the working zone with the spud controlled automatically. Furthermore, it has been improved definitely compared with the existing dredging proccess management system such that it shows the track of spud and working depth on the electronic navigation chart of window, together with the final outcome of dredging work. The test dredging work at the entrance of Busan North Port for system evaluation showed that actual working time available was twice of the one by the existing anchor system, and that it reduced 38% of time for preparation work and one man power.

  • PDF

The Influence of Sediment Control Dam Dredging on Benthic Macroinvertebrate Communities of Mountain Stream (사방댐 준설이 저서성 대형무척추동물 군집에 미치는 영향)

  • Kim, Bong Sung;Lee, Chang Woo;Seo, Eul Won;Lee, Jong Eun
    • Journal of Korean Society of Forest Science
    • /
    • v.101 no.3
    • /
    • pp.454-460
    • /
    • 2012
  • This study was conducted for determining the influence of Sediment Control Dam dredging on benthic macroinvertebrate communities in mountain stream of Gyeongsangbuk-do. The sediment control dams were surveyed before and after dredging from mountain streams of Yecheon, Yeongju and Bonghwa in Northern part of Gyeongsangbuk-do. Sampling was taken at upper and down from 3 experimental sites and 2 control sites during May to August 2011. The identified species before dredging were 56 belonged to 31 families, 11 orders, 6 classes and 4 phyla, but after dredging it has decreased to 51 species belonged to 27 families, 10 orders, 5 classes and 4 phyla. The microhabitat damage of benthic macroinvertebrates occurred at experimental sites after dredging of sediment control dams led to reduction of the number of species and individuals. Especially, upper stream of experimental sites showed the reduction of an average of 38% species. In general, species diversity indices and species richness indices decreased after dredging; however, dominance indices increased at experimental sites. In the upper stream of experimental sites, the microhabitat damaged and became pool due to dredging. Also, velocity of flow decreased and the river bed became simply due to the sedimentary matter being finer than sand and silt. As a result, composition of functional feeding groups and functional feeding groups were relatively simpler at upper stream and the degree of community differences was greater between upper and down stream. Also, Chironomidae spp., Ephemeridae spp., and Gomphidae spp. to prefer where slow velocity of flow and lentic increased in a greater rate, and the EPT/C index to indicate the balance of the community decreased.

Evaluation of Waterway Dredging Work using Spud Dredge Process Management System (스퍼드 준설선 공정관리시스템을 이용한 항로준설작업의 평가)

  • Lee Joong-Woo;Jeong Dae-Deuk;Cho Jueng-Eon;Kim Ju-Young;Oh Dong-Hoon
    • Journal of Navigation and Port Research
    • /
    • v.29 no.5 s.101
    • /
    • pp.395-402
    • /
    • 2005
  • The most important point when we engage on waterway dredging work is supplying safe navigational passage to the vessels underway by narrowing dredge work area and removing submerged dangers. In order to meet this end it is necessary to use auxiliary equipment for shifting actively and mooring and adopt automation of dredging work by integrating information on real time position, dredging depth, and work information. The dredger with a spud control system in this study, by the way, is able to employed on continuous dredging work with the narrowest working area allowing wide and safe passages to vessels underway, by moving the dredger to the working zone with the spud controlled automatically. Furthermore, it has been improved definitely compared with the existing dredging process management system such that it shows the track of spud and working depth on the electronic navigation chart of window, together with the final outcome of dredging work. The test dredging work at the entrance of Busan North Port for system evaluation showed that actual working time available was twice of the one by the existing anchor system, and that it reduced $38\%$ of time for preparation work and one man power.

A Study on Estimation of Loss Rate of Hydraulic Fills (준설토의 유실율 평가방법에 관한 연구)

  • 김홍택;노종구;김석열;강인규;김승욱;박재억
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.11a
    • /
    • pp.185-192
    • /
    • 2000
  • Recently, the hydraulic fill method is commonly used in many reclamation projects due to lack of fill materials. The method of hydraulic fill in reclamation is executed by transporting the mixture of water-soil particles into a reclaimed land through dredging pipes, then the dredged soil particles settle down in the water or flow over an out flow weir with the water. In the present study, practice each three method in order to suggest method of determining the loss rate of the dredged fills. The first sieve and hydrometer analysis were performed with the soil samples obtained before and after dredging and then apply theory of particle breakage, the second compare with the volume of dredged soil between at the dredging area and the target pond and the last compare with weight of dredged soil between before and after dredging at the dredging area and in the target pond for estimating the amount of soil particles residual at the reclaimed area and the loss of soil particles passed through the weir. In addition to compare with the loss ratio between as using Marsal's modified theory of particle breakage and measured weight and volume in the field.

  • PDF

Study of Hydraulic Transport of Sand-water Mixture by a Dredging Test Loop (준설시험루프를 이용한 모래-물 혼합물 배송에 관한 연구)

  • Lee, Man-Soo;Park, Young-Ho;Lee, Young-Nam;Chung, Choong-Ki
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.1504-1511
    • /
    • 2005
  • The efficiency of the hydraulic transport of soil-water mixtures is an important factor in designing and operating a pump & pipeline system and is directly connected with dredging cost and working period. However, the hydraulic transport mechanism in the slurry flow inside the pipeline such as frictional losses, specific energy consumption, deposition velocity has not been well established. In this study a new dredging test loop system was designed and built. It is composed of a slurry pipeline with pipes of different diameters, a centrifugal slurry pump and a diesel engine connected with the slurry pump. and equipped with modern measuring facilities that enable to measure all important characteristics of a transportation system. The objective of this paper is to discuss the efficiency of the hydraulic transport of the Jumoonjin sand-water mixtures in the dredging test loop and to present simple equations induced from the test results of the loop that can express the transport product and the transport productivity.

  • PDF