• Title/Summary/Keyword: Drawing scheduling

Search Result 17, Processing Time 0.019 seconds

SCHEDULING TECHNIQUE FOR CONTROL STEP (스케듈링 기법 연구)

  • JeongYoungSong;NamWooBack
    • Journal of the Korean Geophysical Society
    • /
    • v.4 no.3
    • /
    • pp.163-173
    • /
    • 2001
  • This paper deals with scheduling problems which are the most important subtask in High-Level Synthesis. Especially, we have concentrated our attentions on the data-path scheduling which can get the structural informaion trom the behavioral algorithm as a first step in synthesis procedure. Suggest Forward scheduling methode is executed the ASAP and ALAP scheduling to use the fifth - order elliptic wave filter of a standard benchmark moedl, and then it is drawing up T.N matrix table by the number resource and control-step, using the table extract of the simple than down-limit value of the control-step for the number of given resource th use this table. All of existing list scheduling techniques determine the priority function first, and then do the operation scheduling, But, the suggested forward scheduling technique does the schedule first, and determines the priority functions if needed in scheduling process.

  • PDF

Scheduling Technique for Control Step (제어구간에 의한 스케듈링 기법)

  • Song, Jeong-Young;Back, Nam-Woo
    • The Journal of Engineering Research
    • /
    • v.4 no.1
    • /
    • pp.35-45
    • /
    • 2002
  • This paper deals with the scheduling problems which are the most important subtask in High-Level Synthesis. Especially, we have concentrated our attentions on the data-path scheduling which can get the structural informations from the behavioral algorithm as a first step in synthesis procedure. Suggest Forward scheduling methode is executed the ASAP and ALAP scheduling to use the fifth – order elliptic wave filter of a standard benchmark model, and then it is drawing up T.N matrix table by the number of resource and control-step, using the table extract of the simple than down-limit value of the control-step for the number of given resource to use this table. All of existing list scheduling techniques determine the priority functions first, and then do the operation scheduling, But, the suggested forward scheduling technique does the schedule first, and determines the priority functions if needed in scheduling process.

  • PDF

High-level Discrete-event Modeling-based Business Process Simulation for the Scheduling of the Ship Hull Production Design (조선 선체 생산설계 일정 계획을 위한 상세 이산사건 모델링기반 비즈니스 프로세스 시뮬레이션)

  • Son, Myeong-Jo;Kim, Tae-Wan
    • Korean Journal of Computational Design and Engineering
    • /
    • v.18 no.3
    • /
    • pp.224-233
    • /
    • 2013
  • For the scheduling and the job assignment of the ship hull production design which is a process-based work, we suggest the simulation-based scheduling using the discrete-event-based business process simulation. First, we analyze the ship hull production design process from the perspective of a job assignment to make it into the simulation model using DEVS (Discrete Event System Specification) which is the representative modeling method for a discrete-event simulation. Based on the APIs of the open-source discrete-event simulation engine, we implement the simulation using the Groovy script. We develop the scenario generator in which the user defines detail information of the construction drawing and its member blocks, and design engineers information, and the various setting for the simulation including the job assignment strategy. We use the XML files from this scenario generator as inputs of simulation so that we can get simulation result in forms of Gantt chart without changes of the simulation model.

A Use-Case Based Object-Oriented Project Scheduling Technique (Use-Case 기반 객체지향 프로젝트 스케줄링 기법)

  • 허진선;최시원;김수동
    • Journal of KIISE:Software and Applications
    • /
    • v.30 no.3_4
    • /
    • pp.293-307
    • /
    • 2003
  • Object-oriented development has been generalized, but object-oriented project planning and scheduling techniques have not been studied enough. Furthermore, it is difficult to apply the conventional software management techniques to object-oriented projects. Especially, the large scaled projects are increasing, but the project planing techniques for these large scaled projects have not been proposed enough. In this paper, we propose systematic techniques for OO based project scheduling. We suggest a 7 step-process for deriving the OO project schedule from the use-case diagram which is describing the functional requirements of the system. The proposed process includes identifying use-cases, drawing preliminary chart through interdependency analysis, identifying characteristics of each use case, determining the number of iteration, assigning use-cases to iteration, considering available resource and constraints, drawing revised PERT chart. Each step has the explanation of the input, output, and the guidelines needed to perform the step. The project scheduling technique proposed in this paper ran be used effectively in the planning phase which the purpose is to plan a development schedule to yield the high quality software in minimum time.

A Real-Time Scheduling Technique on Multi-Core Systems for Multimedia Multi-Streaming (다중 멀티미디어 스트리밍을 위한 멀티코어 시스템 기반의 실시간 스케줄링 기법)

  • Park, Sang-Soo
    • Journal of Korea Multimedia Society
    • /
    • v.14 no.11
    • /
    • pp.1478-1490
    • /
    • 2011
  • Recently, multi-core processors have been drawing significant interest from the embedded systems research and industry communities due mainly to their potential for achieving high performance and fault-tolerance at low cost in such products as automobiles and cell phones. To process multimedia data, a scheduling algorithm is required to meet timing constraints of periodic tasks in the system. Though Pfair scheduling algorithm can meet all the timing constraints while achieving 100% utilization on multi-core based system theoretically, however, the algorithm incurs high scheduling overheads including frequent core migrations and system-wide synchronizations. To mitigate the problems, we propose a real-time scheduling algorithm for multi-core based system so that system-wide scheduling is performed only when it is absolutely necessary. Otherwise the proposed algorithm performs scheduling within each core independently. The experimental results by extensive simulations show that the proposed algorithm dramatically reduces the scheduling overheads up to as negligible one when the utilization is under 80%.

COMPUTER AIDED SCHECULING MODEL OF MATERIALS HANDSLING IN CHEMICAL ANALYSIS FLOOR

  • Fujino, Yoshikazu;Motomatu, Hiroyoshi;Kurono, Shigeru
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1995.10a
    • /
    • pp.31-34
    • /
    • 1995
  • The automated chemical analysis shop floor are developed for the environmental pollution problems in our chemical analysis center. This shop floor have the several equipments include weight, pour, dry, heater, boiler, mixture, spectroscopy etc. And the material handling components are made up by the stored stack, conveyore, turntables, robot etc. Computer simulation has been an important tool for these complete design problem. We have designed the arangement of chemical equipments and material flow systems by using the simulator "AutoModII". "AutoMoII" is one of the advanced simulator, CAD-like drawing tools with a powerful, engineering oriented language to model control logic and material flow. The result is the modeling of the chemical analysis system in accurate, three dimensional detail. We could designed the set able layout and scheduling system by using the AutoMoII simulator. AutoMoII simulator.

  • PDF

Application of the 3D CAD Model Data for 4D Simulation and Quantity Estimation (4D 시뮬레이션 및 일정별 물량정보검색을 위한 3D 모델 정보 활용)

  • Lee Jae-Cheol
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.4 s.20
    • /
    • pp.107-114
    • /
    • 2004
  • This paper represents the application of the 3D CAD Model data for 4D simulation and quantity estimation. These support the effective and practical use of 4D CAD model. By using and manipulating the 3D CAD model information, scheduling and quantity estimation could be developed more quickly and effectively. So the 3D CAD model information is made use of not only drawing a blueprint but also playing an important part of data integration platform. The scheduling module sets up the schedule generation logic that consists of period, priority of element arrangement, and time lag of floor placement. It sorts the working items as a priority of working process. And the quantity estimation module queries the material quantity of the structural elements according to the scheduling conditions. These two modules are developed using the 3D CAD model information and assist the function of 4D CAD model.

Delay Factors Based on the Importance of Finish Work in Apartment Construction Project (공동주택 마감공사 중요도 기반 작업지연 요인 분석)

  • Lee, Seung-Hoon;Lee, Sang-Hyo;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.125-129
    • /
    • 2010
  • The ultimate goal of construction is to complete the given work in the most economical and safest way within the required construction period while meeting the quality standards specified in the design drawing. There are a few characteristics of finish work. First, executed in subdivided processes, finish work involves a very diverse and complex structure. Second, there are no criteria for each segmented process with regard to the appropriate time of input. Third, it is not very necessary to set priorities for lead and lag works. This study intends to provide information on the completion of a project in accordance with the required duration by setting priorities in the delay of each detailed process of finish work to minimize delay in finish work. In this study, finish work is divided into wet work and other types of finish work, and the importance of each process is classified based on the given details of each process. In addition, the study employs a survey to analyze delay factors of a designer, a constructor, and a supplier. Using the survey results, the study sets priorities in delay of final work to provide information on the completion of an apartment project within the planned construction period.

  • PDF

A Scheduling Method Of Dismantling Work Considering Specific Condition Of Remodeling Project - Focused on Old Aged Apartment House with Wall-Slab Structure - (리모델링의 특성을 반영한 철거공사의 공정계획 수립방안 - 벽식구조 노후 공동주택을 대상으로 -)

  • Kang, Sa-Yil;Hwang, Young-Kyu;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.5
    • /
    • pp.104-115
    • /
    • 2008
  • Currently, reconstruction and remodeling are conducted to improve the performance of aged housing. Recently reconstruction has caused many problems such as wastes generation, wasting resources and real estate speculation, remodeling is drawing attention. Accordingly, remodeling business for aged housings gradually increasing, but the use of scheduling method not considering characteristics of remodeling deters construction in some construction types. Especially, in case of dismantling construction, the dismantling is delayed since the scheduling method not considering characteristics of remodeling is used. In case of remodeling, dismantling construction is ahead of other processes, if the dismantling construction is delayed, whole construction will be delayed and if speedy construction is conducted, the costs for remodeling will increase. Furthermore, existing remodeling for aged housing has been for rahmen(crossbeam and pillar) structure apartments, but since most apartments to be remodeled are wall-slab structure where dismantling takes a lot of weight, it is highly possible the dismantling construction is delayed. Thus, this paper is to establish scheduling method for the dismantling construction reflecting characteristic of remodeling to prevent delay of dismantling construction for remodeling of aged housing with wall-slab structure.

Introduction to Development Tool for Windows Based Real-Time Power Plant Simulators (Windows 환경의 발전소 실시간 시뮬레이터 개발 툴 소개)

  • 조병학
    • Proceedings of the Korea Society for Simulation Conference
    • /
    • 1998.10a
    • /
    • pp.90-94
    • /
    • 1998
  • 한국전력공사 전력연구원은 10년간의 시뮬레이터 개발 경험을 바탕으로 Windows(NT)환경의 시뮬레이터 개발 툴인 Powersim을 독자적으로 개발하고 이를 이용하여 화력발전소 DCS(Distributed Control System) 검증용 시뮬레이터를 개발하고 있다. PowerSim은 GMB(Graphic Model Builder)를 갖춘 국내 최초의 시뮬레이터 개발툴로 다양한 발전소 기기모델과 강사조작반기능을 갖추고 있다. PowerSim은 완벽한 GUI (Graphic User Interface)환경을 지원하여 User가 Icon Drag 방식으로 시뮬레이션 도면(SimDiagram)을 그리면 그래픽 에디터에서 출력된 각종 기기의 접속상태를 나타내는 Netlist를 변환기가 처리하여 기기의 연결상태를 정규화하고 Scheduler는 기기모델(일종의 Subroutine)을 Netlist에 맞게 Scheduling하여 Executive에서 실행 가능한 형태로 만드는 모든 과정이 자동화되어 있다. 따라서, 개발자는 발전소 P&ID(Pipe and Instrument Drawing)에 기초하여 Simdiagram을 그리고 발전소 데이터를 입력하는 것만으로 실시간 시뮬레이터를 구현할 수 있다. 본 논문에서는 PowerSim의 개요와 GMB(Graphic Model Builder) 및 강사조작반에 적용된 GUI 환경과 실시간 Executive에 대해 다룬다.

  • PDF