• 제목/요약/키워드: Downtown Construction

검색결과 190건 처리시간 0.03초

지붕가구법의 변용을 통한 신한옥 보꾹공간의 활용에 대한 연구 (A Study on the Practical Use of the Inn0er Part of a Roof of the New Hanok with a Structural Modification)

  • 김학래
    • 한국농촌건축학회논문집
    • /
    • 제14권2호
    • /
    • pp.1-10
    • /
    • 2012
  • The purpose of this study is to provide the method of saving the construction cost per unit area of the New Hanok using the inner space of a roof as a floor space with a structural modification of it's roof. The proportion of a roof of the Traditional Hanok accounts for about a half of it's elevation, so it is an essential element of it. But, compare to the whole construction cost of the Traditional Hanok, it costs over a half of expenses to build it. Recently, at the traditional building type, it is found that the inner space of a roof of it is used as a floor space with a structural modification of it's roof. It can be divided into two types, the storage type and the living type. The New Hanok at downtown can accommodate various new lifestyle, so the length of it's Yangtong is longer than that of the Traditional Hanok. When we adjust the proportion of the traditional Hanok to the New Hanok, the height of the column and the roof of the New Hanok becomes also higher than those of the traditional Hanok. So, using the upper part of the column and the roof of the New Hanok, we can make the inner space of a roof of the New Hanok as a floor space -like a bed room, tea room, personal work space and a storage- vertically connect with the 1st floor as the main living area. As a result, it is expected to save the unit construction cost of the New Hanok and has an extensity of space when we build the New Hanok at downtown.

런던아이의 디자인 전개와 건립과정에 관한 연구 (A Study on the Design Development and Construction Process in British Airways London Eye)

  • 우대성
    • 건축역사연구
    • /
    • 제15권1호
    • /
    • pp.7-27
    • /
    • 2006
  • This study aims to identify and analyze the factors that influenced the construction of London Eye which was led by private groups, including characteristics in progress, differentiated value in design, the combination of technology and design, and construction costs. The results of this study were the followings. 1) London Eye provides a new construction method for a landmark in the downtown in that the architects became the clients of the project which might have been hoarded, procuring the construction costs and completing it by themselves. 2) London Eye presents a space utilization method where undeveloped spaces in the downtown are used in three-dimensions by erecting a structure on the river with a minimum land. 3) The process of design, production and erection is propelled the realization of technical intention design with one system and from at the initial stage, the participation of the engineer where the designer is equal with you must accompany. 4) London Eye is endowed with strong shape by a circle in design concept, which is the simplest geometrical figure, and it provides organic relationship between the past and the present by utilizing historical elements in various ways. 5) The construction was completed through four phases including idea phase, promotion phase, turn-key contract phase, and design-build phase. The most critical factor to the success is derived from the direct contact with Involved companies from the production phase. 6) In a project facing many challenges in terms of technology, the design-build method proves to be a more effective method than turn-key contract in that it may more allocate risks and enable coherent implementation of the core concept in design. The organization for the design-build method was composed of three phases including general affairs, responsible contracting by sector, and cooperative system by sector. Since that was a new concept structure, high-level contractors who hadn't had existing cooperative relationships with one another formed new cooperative relationship, while collaborating companies who had long cooperated led the responsible contracting and sub-cooperative system, which resulted in reduction of risks and time. 7) The major factors to change design were the design characteristics, derived from a technically great combination, and the opening time. 8) A new erection method was applied to London Eye, a structure that overcame the limitation in land and period, and the process of installation demonstrated that it is an important value for the construction of a landmark in the city. 9) In spite of many visitors and tremendous operational income, the factors that London Eye fails to free itself from debts include the construction costs expended double than expected, and interest burden to the investments, which occurred in the course of procuring the costs. Absolute limit in time increased the construction costs, resulting in being a great obstacle in the course of operation.

  • PDF

Top-Down 공사용 선기초기둥의 특성 (Specificity of Prefounded Column for Top-Down Construction)

  • 강승룡;임홍철;김승원;박대영;김동건;송지윤;정미라
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2008년도 추계 학술논문 발표대회
    • /
    • pp.135-139
    • /
    • 2008
  • For deep basement construction of buildings downtown, the usage of Top-Down Method is increasing as much as ever from strong demand. One of the essential elements for the construction by Top Down Method is the pre-founded columns, which are installed in the ground and on which a building is installed. The fact that the pre-founded columns are placed in the ground makes them susceptible to its plumbness; this aspect distinguishes pre-founded columns from general columns. However, there are no criteria for erection tolerance. Therefore, field-measured-data concerning out-of-plumb of pre-founded columns in the construction field should be accumulated and investigated so that criteria and specifications for the erection tolerance of pre-founded columns may be established through the understanding of its aspects. In this paper, we investigate out-of-plumb of pre-founded columns for the construction case and analyze its aspects, and propose considerations for design and construction phase.

  • PDF

건설 리프트의 적정 대수 산정에 관한 연구 (A Study on the Estimation of Proper Numbers of Construction Lifts)

  • 김선국;한갑규
    • 한국건축시공학회지
    • /
    • 제8권3호
    • /
    • pp.119-125
    • /
    • 2008
  • The volume of material and number of workers mobilized has been on the rise in line with the domestic projects getting higher, larger and complex currently. Particularly for the project in downtown, delivering the resources in timely manner is very crucial in carrying out the overall project as scheduled. Inappropriate lifting plan often causes inefficiency over the entire project, resulting in increase in schedule and cost. Despite of such importance of lifting plan for architectural work, lifting plans at the most of domestic projects, except a few cases for large scale high-rise buildings, have been heavily dependent on engineer's personal experience and intuition alone. To deal with such problems, the study was intended to develop and suggest a systematic and objective process for determining the lift, categorizing the lifting equipment into the two types, one for workers and another for material.

택지개발지구 특성에 따른 거주자의 생활권 내 근린시설 이용행태 - 청주권 3개 택지개발지구를 중심으로 - (Residents' Using Behaviors of Living Facilities According to the Developmental Concepts of Complexes - The Case of the 3 Complexes in Cheongju Area -)

  • 이상운;박경옥
    • 한국주거학회논문집
    • /
    • 제21권5호
    • /
    • pp.13-22
    • /
    • 2010
  • This study has the purpose to reveal the differences of residents' using behaviors of living facilities at 3 complexes. The physical characteristics of the complexes have been investigated by a literature study and field survey. In addition, questionnaires were answered by residents on living facilities using behavior on community environment. The tools of analysis are frequency, percentage, and cross tabulation using SPSS WIN 12.0 program. Followings are the results of the study. 1) The developmental concept of 3 complexes maintained its initial identity. (1) The residence-oriented complex, having wider residential space, had better downtown access and more convenient facilities for daily life. (2) The residence-government mixed complex, constructed with an eco-friendly concept, had wider green and public service space and good downtown access but on the other hand, had less convenience facilities because of a short period from construction. (3) The residence-industry mixed complex, located in sub-urbanity and conceding more land for industries, had poor access to downtown but had more convenient facilities for workers' use. 2) The most frequently visited convenience facilities were shopping facilities, large or small, and banks, and activities were commonly done in the complex or adjacent area. This means it is recommended that the developer of the new complex locate convenience facilities in multi-core concentration types or street types rather than one-core concentration types.

지하공간 개발을 위한 도심지 토사터널 적용사례 (Case of applications of Earth Tunnel for underground space development)

  • 서규석;안진호;유재목;김동환;윤태영
    • 건축구조
    • /
    • 제14권4호
    • /
    • pp.79-86
    • /
    • 2007
  • Underground space development is more active on the latest date. Currently, we construct an connecting tunnel Euljiro underground shopping-area in seoul. we select DSM, considering geological condition and construction efficiency. The numerical analysis is performed with PENTAGON-3D and MIDAS CIVIL This paper will introduce the Earth Tunnel Method and make an examination possible to apply downtown weak ground.

  • PDF

수도권 동북부 지역 물류단지 건설에 관한 연구(양회단지를 중심으로)

  • 권용장;김현웅;유재균
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2004년도 추계학술대회 논문집
    • /
    • pp.1652-1661
    • /
    • 2004
  • It is essential to our economy that preserve the cement industry which has contributed to the growth of construction industry. However, it has not been easy to come up with constructing Silo complex in downtown area due to the opposition of residents, and lack of the supply base aroused the troubles in provision of cement. The main objective of this paper lies in making plans for constructing Silo complex and estimating logistics costs affected by the alternative complex.

  • PDF

CWS공법(Buried Wale Continuous Wall System)을 적용한 Up-Up 시공사례 (Field Application of Up-Up Construction Using Buried Wale Continuous Walt System Method)

  • 이정배;임인식;김동현;오보환;하인호;임홍철
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2006년도 춘계학술논문 발표대회 제6권1호
    • /
    • pp.1-4
    • /
    • 2006
  • A down construction method is frequently used in these days to reduce popular discontent and to assure sufficient working space at early stage in downtown area. There are two main problems in the existing down construction method. One is a confliction between frame works and excavation works, and the other is a cold joint in retaining wall which is unavoidable due to a sequence of concrete placement and induces a water leakage. Therefore, a new method is needed to overcome these problems. The CWS (buried wale Continuous Wall System) method was developed by authors. By replacing RC perimeter beam with embedded steel wale, the steel frame works of substructure can be simplified and the water leakage can be prevented using continuous retaining wall. Consequently, the improved duality and reduction of construction period can be obtained from CWS method.

  • PDF

지하굴착에 따른 붕괴유형에 대한 고찰 (Consideration of Failure Type on the Ground Excavation)

  • 이중재;정경식;이창노
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2009년도 세계 도시지반공학 심포지엄
    • /
    • pp.660-670
    • /
    • 2009
  • Neighboring construction becomes mainstream of Ground excavation in downtown area. This causes the displacement, deformation, stress condition, etc of the ground surroundings. Therefore Neighboring construction have an effect on Neighboring structure. All these years a lot of Neighboring construction carried out, and the accumulation of technology also get accomplished. But earth retaining structure collapse happens yet. Types of earth retaining structure collapse are 12. 1. Failure of anchor or strut system, 2. Insufficiency of penetration, 3. H-pile Failure on excessive bending moment, 4. Slope sliding failure, 5. Excessive settlement of the back, 6. Deflection of H-pile, 7. Joint failure of coupled H-pile, 8. Rock failure when H-pile penetration is rock mass, 9. Plane arrangement of support systems are mechanically weak, 10. Boiling, 11. Heaving, 12. Over excavation. But field collapses are difficult for classification according to the type, because collapse process are complex with various types. When we consider the 12 collapse field, insufficient recognition of ground condition is 4 case. Thorough construction management prevents from fault construction. For limitations of soil survey, It is difficult to estimate ground condition exactly. Therefore, it should estimate the safety of earth retaining system, plan for necessary reinforcement, according to measurement and observation continuously.

  • PDF

AUGT 안전요구사항의 국제적 동향 연구 (Study of International trend for AUGT(Automated Urban Guided Transport) safe requirements)

  • 이훈구;최권희;조용균;이영호;황현철
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2009년도 춘계학술대회 논문집 전기설비전문위원
    • /
    • pp.195-197
    • /
    • 2009
  • It is a proven fact with the opening of the Seoul metro line number 1 in 1974 traffic congestion on the roads has decreased and the efficiency of people transportation in general has greatly been enhanced in the downtown and surrounding areas of Seoul. Even today construction of new subway lines are under way and many more are being planned due to the easy access to stations, short waiting and average travel times, compared with personal vehicles, contributing to the efficiency of the public transportation systems that are linking the downtown areas and also the intercity systems in moving passengers during rush hour and times of special event. Since the labour costs of the train operator in any large city based subway system accounts for a major part of the operating costs per kilometer and to ensure cost efficient operations, especially during non-peak hours, it is necessary to implement an unmanned(auto-driven) subway system. In order to implement such a system it is imperative that the on-board and wayside signalling control systems be fully automated as well. Only through proper examination of safety procedures not only by the AUGT(Automated Urban Guided Transport)system but also by ail the international standards organizations involved can safely and stability be ensured.

  • PDF