• Title/Summary/Keyword: Double deck tunnel

Search Result 59, Processing Time 0.035 seconds

A study on the operation characteristics of oversized exhaust port applicable to double-deck tunnel (복층터널에 적용 가능한 화재 연동형 대배기구 운영 특성 분석 연구)

  • Park, Jinouk;Yoo, Yongho;Kim, Yangkyun;Park, Byoungjik;Kim, Whiseong
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.6
    • /
    • pp.887-895
    • /
    • 2019
  • Recently, the number of underground road development projects has been increasing to solve traffic problems in the national capital region and metropolitan areas with intensified overcrowding, and there has been a tendency to plan underground roads by applying a double-deck tunnel technology that has advantages in constructability and economical efficiency. The double-deck tunnel has a structure where one excavation section is divided into two parts and used as up and down lines, and is mainly used as a road for small vehicles only due to its low floor height. In addition, due to the small cross-sectional area, it has characteristics different from those of general road tunnels in terms of ventilation and disaster prevention. In this regard, this study proposed an operational plan that applies an oversized exhaust system, which is one of semi-transverse ventilation systems, to small cross-sectional tunnels like double-deck tunnel with low floor height, and a comparative analysis between smoke exhaust characteristics according to the fire occurrence locations and oversized exhaust systems was conducted using the Fire Dynamics Simulator (FDS). The results showed that unlike uniform exhaust, intensive smoke exhaust using the oversized exhaust port maximized the delay effect of smoke diffusion and limited the smoke within 50 m above and below the fire point.

A evaluation study of a fire smoke diffusion delay device installed in a great depth underground double deck tunnel (대심도 복층터널에 설치 가능한 화재연기 확산지연장치 성능 평가 연구)

  • Shin, Tae-Gyun;Moon, Jung-Joo;Yang, Yong-Won;Lee, Yun-Taek
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.1
    • /
    • pp.225-234
    • /
    • 2018
  • Domestic urban areas are experiencing serious traffic congestion problems due to continuous population growth and increased traffic volume. In order to solve the problem of traffic congestion, the study of great depth underground double deck tunnels using underground space is being actively carried out in the urban areas. The characteristics of great depth underground double deck tunnels are low in cross section, so the spread of fire smoke is expected to spread faster than the road tunnel in case of fire. Therefore, it is necessary to provide a fire smoke delay device which delays the spread of fire smoke when a fire occurs in a tunnels. In the previous study, the diffusion effect was analyzed according to the blocking area when the fire smoke spread delay device was operated through the 3D CFD in the study of preventing the smoke spread in the case of the tunnel fire. A study on fire smoke diffusion delay device using spring elasticity which is excellent in applicability to a tunnel and economical value is studied. In this study, fire smoke spread delay system was developed to fire smoke delay was experimentally analyzed. Fire smoke delay effect of fire smoke delay device appeared. Therefore, it is considered that the can minimize the damage of the victims when installed in the great depth underground double deck tunnels.

Review on the buoyancy effect of the multi purpose double-deck tunnels during operation (운영중 다목적 복층터널의 부력영향 검토)

  • Kim, Ho-jong;Kim, Hyeon-ah;Joo, Eun-jung;Shin, Jong-ho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.6
    • /
    • pp.623-635
    • /
    • 2015
  • Double-deck tunnels beneath the groundwater table have relatively large volume and commonly constructed as watertight tunnels. In this case, it requires to secure stability of the tunnels for buoyant force. Generally the contact force between lining and ground is sufficient to resist the buoyant force. However in the long-term the contact force could be reduced because of structural deterioration. In this study the effect of long-term buoyant force acting on the double-deck tunnel is investigated. The results has shown that the buoyant force has increased invert deformation and stress. It is indicated that the contact resilience between lining and ground needs to be kept during tunnel operation.

Seismic response characteristics according to the supporting conditions of middle slab of double-deck undersea tunnel using the centrifuge testing (원심모형 실험을 이용한 해저 복층터널 중간슬래브 지지조건에 따른 지진 응답특성)

  • Um, Ki-Yoon;Park, Inn-Joon;Kwak, Chang-Won;Jang, Dong-In
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.2
    • /
    • pp.347-360
    • /
    • 2018
  • Due to the concentration and congestion of traffic in Seoul metropolitan area, effective utilization of underground space is required, and construction of various underground structures such as a double deck tunnel is increasing. Double deck tunnels are divided into upper and lower runways, and the most important part is middle slab. To investigate seismic behavior of middle slab, experimental study is required because of the complexity of the load and the mechanism of earthquake. In this study, centrifugal model tests were conducted to investigate the response characteristics of earthquake response according to the support conditions of the middle slab of a double deck tunnel. Artificial, Ofunato (short period) and Hachinohe (long period) seismic waves were employed in the experimental study. As a result, it was confirmed that the acceleration attenuation of elastomeric bearings condition was 10.6% in artificial earthquake, 13.6% in Ofunato earthquake, and 10.3% in Hachinohe earthquake. The results indicate that elastomeric bearings have some advantages in the viewpoint of seismic behaviors.

Analysis of the Fundamental Behaviors of the Middle Slab in a Double-Deck Tunnel for Design Guide Development (복층터널 중간슬래브 설계 기준 마련을 위한 기본 거동 특성 분석)

  • Park, Hee Beom;Cho, Young Kyo;Lee, Young Hoon;Kim, Seong-Min
    • International Journal of Highway Engineering
    • /
    • v.19 no.1
    • /
    • pp.63-72
    • /
    • 2017
  • PURPOSES : The purpose of this study is to investigate the fundamental behaviors such as stresses and deflections of the middle slab in a double-deck tunnel for the development of a middle slab design guide. METHODS : The middle slab has been divided into the following three different sections as according to its structural differences: the normal section, expansion joint section, and emergency passageway section. The normal section of middle slab represents the slab supported by brackets installed continuously along the longitudinal direction of tunnel lining. The expansion joint section refers to a discontinuity of middle slab due to the existence of a transverse expansion joint. The emergency passageway section has an empty rectangular space in the middle slab that acts as an exit in an emergency. The finite element analysis models of these three sections of middle slab have been developed to analyze their respective behaviors. RESULTS : The stresses and deflections of middle slab at the three different sections decrease as the slab thickness increases. The emergency passageway section yields the largest stresses and deflections, with the normal section yielding the smallest. CONCLUSIONS : The stress concentrations at the corners of the passageway rectangular space can be reduced by creating hunch areas at the corners. The stresses and deflections in the emergency passageway section can be significantly decreased by attaching beams under the middle slab in the passageway area.

Development of remote control automatic fire extinguishing system for fire suppression in double-deck tunnel (복층터널 화재대응을 위한 원격 자동소화 시스템 개발 연구)

  • Park, Jinouk;Yoo, Yongho;Kim, Yangkyun;Park, Byoungjik;Kim, Whiseong;Park, Sangheon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.1
    • /
    • pp.167-175
    • /
    • 2019
  • To effectively deal with the fire in tunnel which is mostly the vehicle fire, it's more important to suppress the fire at early stage. In urban tunnel, however, accessibility to the scene of fire by the fire fighter is very limited due to severe traffic congestion which causes the difficulty with firefighting activity in timely manner and such a problem would be further worsened in underground road (double-deck tunnel) which has been increasingly extended and deepened. In preparation for the disaster in Korea, the range of life safety facilities for installation is defined based on category of the extension and fire protection referring to risk hazard index which is determined depending on tunnel length and conditions, and particularly to directly deal with the tunnel fire, fire extinguisher, indoor hydrant and sprinkler are designated as the mandatory facilities depending on category. But such fire extinguishing installations are found inappropriate functionally and technically and thus the measure to improve the system needs to be taken. Particularly in a double-deck tunnel which accommodates the traffic in both directions within a single tunnel of which section is divided by intermediate slab, the facility or the system which functions more rapidly and effectively is more than important. This study, thus, is intended to supplement the problems with existing tunnel life safety system (fire extinguishing) and develop the remote-controlled automatic fire extinguishing system which is optimized for a double-deck tunnel. Consequently, the system considering low floor height and extended length as well as indoor hydrant for a wide range of use have been developed together with the performance verification and the process for commercialization before applying to the tunnel is underway now.

The Characteristic of Earthquake Response on Middle Slab in Double-Deck Tunnel under Supporting Conditions (복층터널 중간슬래브의 지지조건에 따른 지진 응답특성)

  • Jang, Dongin;Kim, Jongill;Kwak, Changwon;Park, Innjoon
    • Journal of the Korean GEO-environmental Society
    • /
    • v.18 no.5
    • /
    • pp.55-60
    • /
    • 2017
  • It is critical for Korea to make effective use of limited space as it has dense population and high traffic volume compared to its terrestrial area. To resolve this issue, diverse types of underground structures have increasingly been applied so far, and one of the most representative structures is double-deck tunnel. It has upper and lower roads separated by middle slab that shows dynamic behavior according to the vehicle and earthquake loads. In case of the characteristics of earthquake response, it is necessary to have exploratory study as it has high loads, complex working mechanism, and difficult theoretical approach. In order to understand the characteristics of earthquake response based on the supporting conditions of middle slab in double-deck tunnel, this study conducts indoor shaking table test with 3 test cases: (1) fix both brackets, (2) free and fix at each bracket and (3) free at both brackets for 2 seismic waves of artificial and Gyeongju earthquake. The result shows if the middle slab is free at both brackets, the acceleration response is reduced 41% for artificial earthquake and 60% for Gyeongju earthquake compared to the one with fix at both brackets.

Evaluation of blasting vibration with center-cut methods for tunnel excavation

  • Lee, Seung-Joong;Kim, Byung-Ryeol;Choi, Sung-Oong;Kim, Nam-Soo
    • Geomechanics and Engineering
    • /
    • v.30 no.5
    • /
    • pp.423-435
    • /
    • 2022
  • Ground vibration generated repeatedly in blasting tunnel excavation sites is known to be one of the major hazards induced by blasting operations. Various studies have been conducted to minimize these hazards, both theoretical and empirical methods using electronic detonator, the deck charge method, the center-cut method among others Among these various existing methods for controlling the ground vibration, in this study, we investigated the cut method. In particular, we analyzed and compared the V-cut method, which is commonly used in tunnel blasting, to the double-drilled parallel method, which has recently been introduced in tunnel excavation site. To understand the rock fragmentation efficiency as well as the ground vibration controllability of the two methods, we performed in-situ field blasting tests with both cut methods at a tunnel excavation site. Additionally, numerical analysis by FLAC3D has been executed for a better understanding of fracture propagation pattern and ground vibration generation by each cut method. Ground vibration levels, by PPVs measured in field blasting tests and PPVs estimated in numerical simulations, showed a lower value in the double-drilled parallel compared with the V-cut method, although the exact values are quite different in field measurement and numerical estimation.

Effect of widening excavation in divergence section of a double-deck tunnel on its stability (복층터널 분기구 확폭구간 굴착에 따른 안정성 영향)

  • La, You-Sung;Kim, Yunhee;Lee, Kangil;Kim, Yongseong;Kim, Bumjoo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.4
    • /
    • pp.435-450
    • /
    • 2020
  • The divergence section of a double-deck tunnel can be divided into a 'widening pre-divergence section', a large cross-section with a cap shape and a 'post-divergence section' where the separation between the main and the branch tunnel is made. Since the cross-section of the widening pre-divergence section is considerably larger than that of the post-divergence section, the influence of excavation due to the different sizes and shapes in the cross-section should be considered in the examination of the tunnel stability. In this study, the effect of the preceding excavation, that is the excavation of the widening pre-divergence section, on excavation stability of the post-divergence section was examined by varying the excavation methods and bench lengths through 3D finite element analysis. The results showed that although the effects of the excavation methods and the bench lengths are not significant on the variation of principal stresses, the preceding excavation causes a relatively large variation on the stresses which may have an impact on the stability of the post-divergence section from the comparison of Stress-Strength Ratio (SSR) between the cases with and without the consideration of the preceding excavation effect by 2D finite element analysis.

A stability study of deep and double-deck tunnels considering shape and reinforcing method of an enlarged section by using numerical analyses (수치해석을 이용한 대심도 복층터널의 확폭단면 형상 및 보강방법에 대한 안정성 연구)

  • You, Kwang-Ho;Jin, Su-Hyun;Kim, Young-Jin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.1
    • /
    • pp.41-56
    • /
    • 2017
  • Recently, the necessity of deep and double-deck tunnels has been grown day by day due to the increase of traffic volume at metropolitans and thus the study on the divergence of those tunnels becomes required. Therefore sensitivity analyses were conducted with FLAC 2D program by selecting ground condition, coefficient of lateral pressure, support pattern, and depth of rock cover as parameters. Ultimately, this study is to find the optimal shape and support method of a diverged section. As the results of this study, it turned out that the box type gave higher stability of the section than arch type unlike the general thought. It can be explained that the arch type has about 30% bigger excavation area than the box type. When the ground conditions are poor, steel pipe grouting reinforcement gives higher stability than rockbolt reinforcement, but its thickness and range do not give a great influence on the stability of the enlarged section.