• Title/Summary/Keyword: Double deck

Search Result 145, Processing Time 0.023 seconds

The National Highway, Expressway Tunnel Video Incident Detection System performance analysis and reflect attributes for double deck tunnel in great depth underground space (국도, 고속국도 터널 영상유고감지시스템 성능분석 및 대심도 복층터널 특성반영 방안)

  • Kim, Tae-Bok
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.20 no.7
    • /
    • pp.1325-1334
    • /
    • 2016
  • The video incident detection System is a probe for rapid detecting the walker, falling, stopped, backwards, smoke situation in tunnel. Recently, the importance is increases from the downtown double deck tunnel in great depth underground space[1], but the legal basis is weak and the vulnerable situation experimental data. So, In this paper, we introduce a long-term log data analysis information in the tunnenl video incident detection system installed and experimental results in order to verify the feasibility of apply to video incident detection system for the double deck tunnel. It is proposed a few things about derives the problem of existing video incident detection system, improvements and reflect attributes for double deck tunnel. The contents described in this paper will contribute to refine the prototype of video incident detection system will apply to future double deck multi-layer tunnels.

Development of Fire Detection Algorithm for Video Incident Detection System of Double Deck Tunnel (복층터널 영상유고감지시스템의 화재 감지 알고리즘 개발)

  • Kim, Tae-Bok
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.23 no.9
    • /
    • pp.1082-1087
    • /
    • 2019
  • Video Incident Detection System is a detection system for the purpose of detection of an emergency in an unexpected situation such as a pedestrian in a tunnel, a falling object, a stationary vehicle, a reverse run, and a fire(smoke and flame). In recent years, the importance of the city center has been emphasized by the construction of underpasses in great depth underground space. Therefore, in order to apply Video Incident Detection System to a Double Deck Tunnel, it was developed to reflect the design characteristics of the Double Deck Tunnel. and In this paper especially, the fire detection technology, which is not it is difficult to apply to the Double Deck Tunnel environment because it is not supported on existing Video Incident Detection System or has a fail detect, we propose fire detection using color image analysis, silhouette spread, and statistical properties, It is verified through a real fire test in a double deck tunnel test bed environment.

A comparative study on the stability evaluation of double deck tunnel in terms of excavation (대심도 복층터널에 대한 굴착 안정성 평가 비교 연구)

  • Jang, Namju;Gang, Han-gil;Kim, Kihwan;Choi, Chang-rim
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.1
    • /
    • pp.155-166
    • /
    • 2019
  • It is necessary to construct underground in the metropolis. Road traffic has reached saturation point. The city has several underground road construction projects. In abroad, double deck tunnels are planned and constructed. It is attained a high level of underground development technology. In case the double deck tunnel (2 lane) is planed instead of the bidirectional tunnel (2 lane), excavation area is similar. But tunnel width is decreased. The reduced width can cut cost for the tunnel reinforcement. This study evaluates the stability of excavation on double deck tunnel. By the assessment of the strength-stress ratio and strength reduction method, quantitative analysis is conducted between double deck tunnel and the bidirectional tunnel.

Development of Mechanical Construction Method of Road Deck Middle Slab of Double Deck Tunnel in Great Depth (대심도 복층터널 중간슬래브의 기계화 시공법 개발)

  • Lee, Doo Sung;Kim, Young Jin;Kim, Tae Kyun;Kim, Chang Yeong
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.39 no.3
    • /
    • pp.451-460
    • /
    • 2019
  • It is critical for Korea to make effective use of limited space as it has dense population and high traffic volume compared to its terrestrial area. To resolve this issue, diverse types of underground structures have increasingly been applied so far, and one of the most representative structures is double-deck tunnel. The construction period of the middle slab in the double deck tunnel constructed at the great depth can be considered as an important part after the tunnel lining construction in the whole process. In order to minimize the construction period required for construction of the middle slab in the double deck tunnel, it was proposed a method of the precast intermediate slab. In this study, it is suggested a mechanical construction process with dedicated equipments developed to improve the safety and the workability of erection of the precast middle slab than the current construction method using the existing mobile crane.

Safety Assessment of Double Deck Plate Wall Formwork against Lateral Pressure of Fresh Concrete (콘크리트 측압에 대한 더블 데크플레이트 벽체 거푸집의 안전성 평가)

  • Lee, Hye-Ji;Mun, Ju-Hyun;Yang, Keun-Hyeok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.225-226
    • /
    • 2023
  • This study examined the lateral deformation of double deck plate wall formworks against the lateral pressure of fresh concrete and then compared with the construction specification.

  • PDF

Design Optimization of Double-deck Train Carbody Under Multi-loading Condition (다중하중조건에서 2층열차 차체의 최적설계)

  • Lee, Tae-Hee;Lee, Jin-Min;Jung, Jae-Jun;Hwang, Won-Ju;Kim, Hyeong-Jin
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.30 no.11 s.254
    • /
    • pp.1472-1478
    • /
    • 2006
  • Double-deck train has been attracted growing attention as next generation transportation around metropolis because of high passenger carrying capacity. To develop high-speed double-deck train with low operational costs, the carbody must be designed as light as possible. In addition, the carbody must be strong enough to ensure the safety of passengers. To meet these design requirements, we perform systematically weight minimization that determines thickness of aluminum extruded panels of the carbody. First, to reduce the design variables, we carry out the screening process that select sensitive or/and important design variables through design exploration. Then, weight minimization is accomplished under multi-loading condition such as vertical, compressive and torsional loads, while satisfying strength constraints of the design regulations. Finally, the result of design optimization is discussed by comparison with its initial design.

Characteristics of Middle Slab Stresses in Double-Deck Tunnel During Maintenance (복층터널 중간슬래브 유지관리에 따른 응력분포 특성 분석)

  • Cho, Young Kyo;Lee, Young Hoon;Park, Beom Keun;Kim, Seong-Min
    • International Journal of Highway Engineering
    • /
    • v.19 no.6
    • /
    • pp.47-56
    • /
    • 2017
  • PURPOSES : The purpose of this study is to investigate the stresses of the middle slab in a double-deck tunnel owing to the slab lift to replace the underlying elastic pads during maintenance work. METHODS : The middle slab was divided into three different sections: typical section, expansion joint section, and emergency passageway section. Finite element analysis models of these three sections of middle slab were developed, and the stress distribution and maximum stresses were obtained using the models when the middle slab was lifted to replace the underlying elastic pads. Various slab lifting methods were examined in this study such as one-, two-, and multiple-point lifts, distributed lifts, and one or both slab side edge lifts. RESULTS : When the slab side edge is lifted, the longitudinal stresses of the slab are almost the same as the principal stresses. This implies that the governing stresses are the longitudinal stresses. The maximum stresses with both-edge lifts are generally smaller than those with one-edge lifts at all three sections of middle slab. CONCLUSIONS : If the middle slab in a double-deck tunnel is lifted for maintenance, the slab should be lifted at multiple points along the longitudinal direction to reduce the tensile stresses.

A Case Study on M & E Design for Double-Deck Tunnel in Urban Area (도심지 대심도 복층터널의 환기 및 방재계획)

  • Byun, Sang-Hun;Jeong, Jae-Ho;Jun, Duk-Chan;Shin, Il-Jae;Sim, Dong-Hyun
    • Tunnel and Underground Space
    • /
    • v.21 no.4
    • /
    • pp.281-286
    • /
    • 2011
  • The west underground express way is a recent initiated BTO (Build-Transfer-Operate) project for releasing heavy traffic of the existing west express way which is notorious on-ground road for extremely traffic stuck area in the west of Seoul, South Korea. The new express way for light vehicles is the first double-deck tunnel ever designed in South Korea and 10.91 km long including both open cut structures and concrete lining with middle-deck in bored tunnel. Because the new express way is going through underground of heavily populated area, mechanical & electrical design for the safety of drivers in tunnel is one of the most important parts among many design issues. This paper discusses M & E design focuses including ventilation-evacuation plan and various safety facilities.

Temporary aerodynamic countermeasures for flutter suppression of a double-deck truss girder during erection

  • Zewen Wang;Bokai Yang;Haojun Tang;Yongle Li
    • Wind and Structures
    • /
    • v.38 no.5
    • /
    • pp.399-410
    • /
    • 2024
  • Long-span suspension bridges located in typhoon-prone regions face significant risks of flutter instability, particularly in girder erection. Despite the implementation of aerodynamic countermeasures designed for the service stage, the flutter stability of bridge in girder erection may not meet the required standards. Nowadays, the double-deck truss girder is increasingly common in practical engineering which exhibits different performance from the single-deck truss girder. To gain insights into the flutter performance of this girder type and determine temporary aerodynamic countermeasures for flutter suppression in girder erection, wind tunnel tests were conducted. The effects of affiliated members on the flutter performance were first examined. Subsequently, different aerodynamic countermeasures were designed and their effectiveness was tested. The results indicate that the stabilizers above and below the upper and lower decks are the most effective for the flutter stability of bridge at positive and negative angles of attack, respectively. The higher the stabilizers are, the better the effect on flutter suppression achieves. Considering the feasibility in practical engineering, a temporary stabilizer above the upper deck was considered. It is expected that the results could provide references for the aerodynamic design of double-deck truss girder during erection.