• Title/Summary/Keyword: Diversion Weir

Search Result 8, Processing Time 0.021 seconds

Securing Inflows to Reservoir with Low Ratio of Watershed to Paddy Field Areas by Operating Outside Diversion Weir (유역외 보의 연계운영에 의한 유역배율이 작은 저수지의 유입량 확보 가능성)

  • Noh, Jae-Kyoung
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.53 no.1
    • /
    • pp.17-28
    • /
    • 2011
  • This study was performed to ascertain the possibility of securing inflows to reservoir with low ratio of watershed to paddy field areas by outside diversion weir. The case of Maengdong reservoir and Samryong diversion weir was selected. Most of inflows to Maengdong reservoir with watershed area of $7.06\;km^2$ and total storage capacity of $1,269{\times}10^4\;m^3$ are filled with intake water from outside Samryong diversion weir. Only using water storage data in Maengdong reservoir from 1991 to 2009, the range of water intake in Samryong diversion weir to Maengdong reservoir was optimized to 0.135~30 mm/d, from which water intake to Maengdong reservoir was $1,672.9{\times}10^4\;m^3$ (70.1 %) and downstream outflow to Weonnam reservoir was $714.4{\times}10^4\;m^3$ (29.9 %). The parameters of DAWAST model for reservoir inflow were determined to UMAX of 313.8 mm, LMAX 20.3 mm, FC 136.8 mm, CP 0.018, and CE 0.007. Inflows to Maengdong reservoir were $427.1{\times}10^4\;m^3$ (20.3 %) from inside watershed, and $1,672.9{\times}10^4\;m^3$ (79.7 %) from outside. Paddy irrigation water requirements were estimated to $1,549{\times}10^4\;m^3$ on annual average. Operation rule curve was drawn by using daily inflow and irrigation requirement data. By securing the amount of inflow to Maengdong reservoir to about 80 % from outside Samryong diversion weir, water supply capacity for irrigation of $1,549{\times}10^4\;m^3/yr$ was analyzed to be enough. Additional water supplies for instream flow were analyzed to $1,412\;m^3/d$ in normal reservoir operation, $36,000\;m^3/d$ in withdrawal limit operation by operation rule curve from October to March of non irrigation period.

Feasibility Assessment of Small Hydro Power Plants Using Diversion Weirs for Agricultural Purpose (농업용 보를 이용한 소수력발전소의 타당성 분석)

  • Lee, Chul-Hyung;Park, Wan-Soon
    • 한국태양에너지학회:학술대회논문집
    • /
    • 2011.04a
    • /
    • pp.229-234
    • /
    • 2011
  • Feasibility assessment for small hydropower plants using diversion weirs located in stream for agricultural purpose has been studied. The model, which can predict flow duration characteristic of stream, was developed to analyze the inflow caused from rainfall. And another model to predict hydrologic performance for small hydropower plants is established. Preliminary survey was performed identifying several candidate sites, and two sites were selected finally for actual site reconnaissance. During the course of site survey, generating capacity, construction and equipment cost, and payback through life time of each sites were calculated for economical feasibility analysis. The results of this study have estimated that the small hydropower plants using diversion weirs for agricultural purpose may offer better opportunities in future with increasing fuel cost and nation's energy policy.

  • PDF

Assessment of Appropriate Period and Cost(P&C) of Repair and Improvement for Irrigational Structures (논문 - 수리시설물의 적정개보수 주기 및 비용 산정)

  • Lee, Joon-Gu;Kim, Myong-Won;Shin, Tae-Ho
    • KCID journal
    • /
    • v.18 no.2
    • /
    • pp.142-160
    • /
    • 2011
  • This study was performed to apply the preventive management technique that is known for more economic and preventive for disaster than corrective technique to Repair & Improvement(R&I) Project policy of irrigational facilities. The appropriate periods of R&I Project had been driven to 40yrs, 24yrs, 27yrs, and 29yrs for reservoir, Pumping and drainage pumping station, Diversion weir and Irrigation & drainage canal respectively. The cost of R&I Project for 10 years had been estimated as 616.9 billion won per year including the 85 billion won for the project of 'Disaster prevention and Function continuity'. After the period of 'Improvement all at once', about 30yrs, 421.8 billion won was requested for 'Function continuity'.

  • PDF

Experimental Study on the Inflow and Outflow Structures of Hwasun Flood Control Reservoir (화순 홍수조절지의 유입유출 구조물에 대한 수리모형실험 연구)

  • Lee, Sang-Hwa;Jin, Kwang-Ho;Ryu, Jong-Hyun;Kim, Soo-Geun
    • Journal of Korea Water Resources Association
    • /
    • v.45 no.7
    • /
    • pp.675-684
    • /
    • 2012
  • Recently, a heavy rainfall under climate change causes the flood exceeded river's conveyance. Flood control methods under the limited river width are the increase of embankment, the construction of storage pockets and diversion channel, the dredging of river bed. Hwasun flood control reservoir of washland is designed as the storage pockets and the regulating gate for the control of water level. In this study, the propriety of design was investigated through hydraulic experiments for the circumstances to exclude the constant flood discharge during operation period. In the results, the over flow rate of side weir exceeded the flow of design and indicated to be able to discharge the designed flow in the regulating gate opened 1.1 m. The high velocity 7.1 m/s behind the gate has investigated to reduce under 3.3 m/s by the baffle block.

Improvement study of river-crossing structures in geyongnam prefecture (경남의 지방하천에 설치된 하천횡단구조물의 현황과 개선방안)

  • Kim, Ki-Heung;Lee, Hyeong-Rae;Jung, Hea-Reyn
    • Journal of Korea Water Resources Association
    • /
    • v.49 no.10
    • /
    • pp.809-821
    • /
    • 2016
  • The study area is local river of 671 (total length 3,741 km) in Gyeongnam prefecture, the results are as follows. Total number of river-crossing structures was investigated as 7,730, and it was found that structures were installed in 2.1 sites per 1 km (river length) on average. Diversion weirs for agriculture were 4006 (51.82%) and drop structures for channel bed maintenance were 3670 (47.48%), but the rest (riverbed road etc.) were 54 (0.70%). The number of high structures (height > 1.0 m) that affect many impact in upstream and downstream was investigated as 3,897 (51%), and the number of low structures (height < 0.5 m) that affect negligibly was 1109 (14%). Fish ladders have been installed on 640 (8%) structures in 153 (23%) rivers. In flood control and environment conservation, river-crossing structures brought about various impact that flood water level is raises and the eco-corridor is intercept. In order to improve these problems, we proposed a few engineering measures that can be realize with respect to river-crossing structures.

A Case Study on Design and Construction of Cofferdam for Hydraulic Structure (수중구조물을 위한 가물막이 설계 및 시공사례에 대한 연구)

  • Cho, Joo-Hwan;Shin, Dong-Hoon;Jeong, Seung-Tai;Woo, Sang-Yoon;Nam, Yong
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.124-143
    • /
    • 2010
  • Cofferdam is a temporary levee or dam structure built by using sheet pile or earth materials to prevent water infiltration during construction work of bridge, dam, harbour dock, or hydraulic structures in the river. In this regard, it is required to secure cutoff ability for dry work and workability for rapid installation and removal of the temporary dam or levee structures. In this paper, case studies for design and construction of cofferdam were performed, and water diversion method was briefed with some examples of cofferdam type as well. For the case study details of design and construction were reviewed based on cofferdams under construction related to 16 submerged weirs of "The 4-river restoration project" and dam type cofferdam respectively. From the review, it was known that the method for changing the water flow is selected based on the data from geological and geo-hydraulic site investigation in order to mitigate environmental effects by making sure if the design cross-sectional area of flow and maximum working days are sufficiently guaranteed. Finally, the primary findings and main conclusion derived are summarized that determination of applicable type of cofferdam should be checked by case study and meet design requirements such as water inflow control, constructability.

  • PDF

Management Strategies to Conserve Soil and Water Qualities in the Sloping Uplands in Korea (한국의 경사지 밭의 토양 및 물의 보전 관리 전략)

  • Yang, Jae-E.;Ryu, Jin-Hee;Kim, Si-Joo;Chung, Doug-Young
    • Korean Journal of Agricultural Science
    • /
    • v.37 no.3
    • /
    • pp.435-449
    • /
    • 2010
  • Soils in the sloping uplands in Korea are subject to intensive land use with high input of agrochemicals and are vulnerable to soil erosion. Development of the environmentally sound land management strategy is essential for a sustainable production system in the sloping upland. This report addresses the status of upland agriculture and the best management practices for the uplands toward the sustainable agriculture. More than 60% of Korean lands are forest and only 21% are cultivating paddy and upland. Uplands are about 7% of the total lands and about 62% of the uplands are in the slopes higher than 7%. Due to the site-specificity of the upland, many managerial and environmental problems are occurring, such as severe erosion, shallow surface soils with rocky fragments, and loadings of non-point source (NPS) contaminants into the watershed. Based on the field trials, most of the sloping uplands were classified as Suitability Class III-V and the major limiting factor was slope and rock fragments. Due to this, soils were over-applied with N fertilizer, even though N rate was the recommendation. This resulted in decreases in yield, degradation of soil quality and increases in N loading to the leachate. Various case studies drew management practices toward sustainable production systems. The suggested BMP on the managerial, vegetative, and structural options were to practice buffer strips along the edges of fields and streams, winter cover crop, contour and mulching farming, detention weir, diversion drains, grassed waterway, and slope arrangement. With these options, conservation effects such as reductions in raindrop impact, flow velocity, runoff and sediment loss, and rill and gully erosion were observed. The proper management practice is a key element of the conservation of the soil and water in the sloping upland.