• Title/Summary/Keyword: District heating

Search Result 437, Processing Time 0.026 seconds

Performance Characteristics of Organic Rankine Cycle Using Medium Temperature Waste Heat with Different Working Fluids (중온 배기열을 이용한 유기랭킨사이클 작동유체별 성능특성)

  • Kwon, Dong-Uk;Heo, Ki-Moo;Yoon, Sung-Hoon;Moon, Yoon-Jae;Yoo, Ho-Sun;Lee, Jae-Heon
    • Plant Journal
    • /
    • v.10 no.2
    • /
    • pp.38-47
    • /
    • 2014
  • Renewable Portfolio Standards was introduced into the system in Korea in 2012. Interest in the unutilized and renewable energy sources is increasing. and these being actively investigated. An organic rankine cycle has emerged as an alternative in order to take advantage of bio-gas engine heat of sewage treatment plants whose capacity is 1500 kW. The organic rankine cycle power system was simulated by a simulator which is a commercial program of power plant design and performance analysis. The biogas engine is operated by $460^{\circ}C$ and 2.7 kg/s flow rate in the sewage treatment plant. Working fluids(R-601a, R-123, R-245fa) are selected to use in ORC power system in this temperature range. It was the isopentane that is the best performance among three working fluids. It could be obtained net power of 163.1 kW and efficiency of 13.66% from isopentane in the simulation.

  • PDF

Methodology for Estimating the Probability of Damage to a Heat Transmission Pipe (열수송관 파손확률 추정 방법론 개발)

  • Kong, Myeongsik;Kang, Jaemo
    • Journal of the Korean GEO-environmental Society
    • /
    • v.22 no.11
    • /
    • pp.15-21
    • /
    • 2021
  • Losses of both life and property increased from damage to underground pipe such as heat transmission pipe buried underground in downtown because pipes are gradually aging. Considering the characteristics of the heat transmission pipe, which is not exposed to the outside and difficult to immediately identify problems such as damage, it is realistic to indirectly check the condition of the facility based on the historical information that is periodically collected through facility maintenance. In this study, a methodology for estimating the damage probability was developed by examining the history information of the heat transmission pipe, deriving an evaluation factor that is related to the damage probability. The contribution factor of the damage probability were reviewed by analyzing not only the guidelines for maintenance of heat transmission pipe of advanced European countries and domestic district heating companies, but also the cases of waterworks with similar characteristics. Evaluation factors were selected by considering not only the correlation with the damage probability but also the possibility of securing data. Based on 1999, when the construction technology and standards of heat transmission pipe changed, the damage probability estimation function according to the period of use was divided into the case of being buried before 1998 and the case of being buried after 1999, and presented. In addition, the damage probability was corrected by assigning weights according to the measured data for each evaluation factor such as the diameter, use, and management authority.

Eco-friendliness Evaluation of a Low-Noise and Dust-Recovery Type Pavement Cutter (저소음·분진회수형 도로절단기의 친환경성 평가)

  • Kim, Kyoon Tai
    • Ecology and Resilient Infrastructure
    • /
    • v.8 no.4
    • /
    • pp.194-203
    • /
    • 2021
  • With the recent increase in maintenance works on water and sewer pipes as well as district heating supply pipes, pavement cutting work using pavement cutter is on the rise. The pavement cutting operation generates considerable dust (cutting sludge) as well as noise; therefore, it is necessary to apply eco-friendly technologies that have low noise and dust recovery capability. Thus far, various equipment for recovering dust have been developed; however, there is a limitation in that the environmental friendliness is not quantified. Therefore, in this study, we developed a low-noise, dust-recovery type pavement cutter that can fundamentally remove the causes of environmental hazards such as noise and dust and evaluated the eco-friendliness of the pavement cutting process performed by this cutter. To this end, an integrated water cooling-sludge recovery system composed of a vacuum device and a sludge suction unit was developed, and the developed system was applied to a pavement cutter. Subsequently, the developed equipment was applied to the test bed, and data related to its eco-friendliness were collected and evaluated. The results showed that the cutting sludge recovery rate of the developed equipment was greater than 83%, the noise level was approximately 82 - 83 dB, and the sound power level was 115 dB. The results of this study will be used as basic data to develop improved pavement cutters in the future with improved cutting sludge recovery performance and lower noise.

Geology and Volcanism of Hyeongjeseom (Islet) Volcano, Jeju Island (제주도 형제섬 화산체의 지질과 화산활동)

  • Park, Jun Beom;Koh, Gi Won;Jeon, Yongmun;Park, Won Bae;Moon, Soo Hyoung;Moon, Deok Cheol
    • Economic and Environmental Geology
    • /
    • v.54 no.2
    • /
    • pp.187-197
    • /
    • 2021
  • The Hyeongjeseom (Islet) is an erosional remnant of volcano which is located about 2 km northeast of sea shore of the Songaksan tuff ring, and is composed of volcaniclastic deposit, agglomerate and scoria deposit, ponded lava, aa lava flows, reworked deposit and beach deposit in ascending order from the base. The volcano is formed by volcaniclastic deposits and lava flows that recorded a transition from initial phreatomagmatic to magmatic explosions followed by lava effusion. It is interpreted that the outcropped volcaniclastic deposit may be a remaining portion of outer ring of a tuff cone. A bomb and a ponded lava yield geochemically basaltic trachyandesite compositions (SiO2 51.3 wt%, Na2O+K2O 6.0 wt%) and belong to olivine basalt with scarce (<5 %) phenocrysts of olivine, petrographically. By incremental heating Ar-Ar dating method, the plateau age of lava flow in the Heongjesom is 9.2±3.6(2σ) ka, implying that the volcanism of Heongjeseom may have occurred earlier than the Songaksan tuff ring which erupted ca. 3.7 ka. It still remains a task to find a volcano which matches with a historical record of volcanic activity that occurred a thousand years ago.

Development and Economic Effect of Integrated Optimum Operation System using Wide Area Energy (광역에너지이용 통합 최적화 운전 시스템 개발 및 경제적 효과)

  • Lee, Hoon;Kim, Lae-Hyun;Chang, Won-Seok
    • Journal of Energy Engineering
    • /
    • v.18 no.4
    • /
    • pp.221-229
    • /
    • 2009
  • This study develops the optimized operation program which enables effective and economic operation between individual and connected branch offices by analyzing the current status and influential indicators of district heating companies' capital branch offices. Accordingly, the study examines the efficiency of optimized operation program. In doing so, this study has diagnosed and analyzed various factors, such as boilers, pumps, and relevant tags (temperature, pressure, fuel amount) through investigation of individual branch offices, and finally succeeded in developing wide-ranging data base by factor covering one-year time period. Additionally, after running the optimized operation program, different branch offices, optimum preference has turned out "incinerator receiving heat from KEPCO>CHP >PLBs>PLBw." Meantime, except the connected offices, there has been no big difference between actual and optimum operation program in branch offices. Meanwhile, the integrated optimum operation program has made it possible the most optimal result only via the connecting supply and demand heat without changing received Heat from KEPCO which is the same as total productive heat. The result has showed that the reduction percentage per day is 2.45~6.80%, and the reduction cost per day is 22,727~60,077 thousand won given the randomly selected sample days. In particular, winter time shows the highest demand with the largest reduction cost whereas summer time illustrates the lowest demand with the smallest reduction cost. Given this result, reduction cost per year compared to actual heat production cost for one year theoretically would be 84 hundred million won. Also, the economic effect showed that the reduction cost percentage per year is more than 2.74% on heat production cost per year for all capital branch offices.

Seismic response characteristics of the hypothetical subsea tunnel in the fault zone with various material properties (다양한 물성의 단층대를 통과하는 가상해저터널의 지진 시 응답 특성)

  • Jang, Dong In;Kwak, Chang-Won;Park, Inn-Joon;Kim, Chang-Yong
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.6
    • /
    • pp.1061-1071
    • /
    • 2018
  • A subsea tunnel, being a super-sized underground structure must ensure safety at the time of earthquake, as well as at ordinary times. At the time of earthquake, in particular, of a subsea tunnel, a variety of response behaviors are induced owing to relative rigidity to the surrounding ground, or difference of displacement, so that the behavior characteristics can be hardly anticipated. The investigation aims to understand the behavior characteristics switched by earthquake of an imaginary subsea tunnel which passes through a fault zone having different physical properties from those of the surrounding ground. In order to achieve the aim, dynamic response behaviors of a subsea tunnel which passes through a fault zone were observed by means of indoor experiments. For the sake of improved earthquake resistance, a shape of subsea tunnel to which flexible segments have been applied was considered. Afterward, it is believed that a D/B can be established through 3-dimensional earthquake resistance interpretation of various grounds, on the basis of verified results from the experiments and interpretations under various conditions. The present investigation performed 1 g shaking table test in order to verify the result of 3-dimensional earthquake resistance interpretation. A model considering the similitude (1:100) of a scale-down model test was manufactured, and tests for three (3) Cases were carried out. Incident seismic wave was introduced by artificial seismic wave having both long-period and short-period earthquake properties in the horizontal direction which is rectangular to the processing direction of the tunnel, so that a fault zone was modeled. For numerical analysis, elastic modulus of the fault zone was assumed 1/5 value of the modulus of individual grounds surround the tunnel, in order to simulate a fault zone. Resultantly, reduced acceleration was confirmed with increase of physical properties of the fault zone, and the result from the shaking table test showed the same tendency as the result from 3-dimensional interpretation.

Optimal Operation of Gas Engine for Biogas Plant in Sewage Treatment Plant (하수처리장 바이오가스 플랜트의 가스엔진 최적 운영 방안)

  • Kim, Gill Jung;Kim, Lae Hyun
    • Journal of Energy Engineering
    • /
    • v.28 no.2
    • /
    • pp.18-35
    • /
    • 2019
  • The Korea District Heating Corporation operates a gas engine generator with a capacity of $4500m^3 /day$ of biogas generated from the sewage treatment plant of the Nanji Water Recycling Center and 1,500 kW. However, the actual operation experience of the biogas power plant is insufficient, and due to lack of accumulated technology and know-how, frequent breakdown and stoppage of the gas engine causes a lot of economic loss. Therefore, it is necessary to prepare technical fundamental measures for stable operation of the power plant In this study, a series of process problems of the gas engine plant using the biogas generated in the sewage treatment plant of the Nanji Water Recovery Center were identified and the optimization of the actual operation was made by minimizing the problems in each step. In order to purify the gas, which is the main cause of the failure stop, the conditions for establishing the quality standard of the adsorption capacity of the activated carbon were established through the analysis of the components and the adsorption test for the active carbon being used at present. In addition, the system was applied to actual operation by applying standards for replacement cycle of activated carbon to minimize impurities, strengthening measurement period of hydrogen sulfide, localization of activated carbon, and strengthening and improving the operation standards of the plant. As a result, the operating performance of gas engine # 1 was increased by 530% and the operation of the second engine was increased by 250%. In addition, improvement of vent line equipment has reduced work process and increased normal operation time and operation rate. In terms of economic efficiency, it also showed a sales increase of KRW 77,000 / year. By applying the strengthening and improvement measures of operating standards, it is possible to reduce the stoppage of the biogas plant, increase the utilization rate, It is judged to be an operational plan.