• Title/Summary/Keyword: Distribution system operation

Search Result 1,401, Processing Time 0.033 seconds

Parallel Operation Method using New Cubic Equation Droop Control of Three-Phase AC/DC PWM Converter for DC Distribution Systems (DC배전용 3상 AC/DC PWM 컨버터의 새로운 3차방정식 Droop 제어를 적용한 병렬운전 기법)

  • Shin, Soo-Choel;Lee, Hee-Jun;Park, Yun-Wook;Hong, Seok-Jin;Won, Chung-Yuen
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.19 no.3
    • /
    • pp.233-239
    • /
    • 2014
  • This paper proposes that each converter supplies the power using the proposed droop control for the parallel operation of the converters. The proposed method is easy to increase the power as parallel system in DC distribution. By improving conventional droop-control method used in AC grid newly, a droop controller is designed to apply droop control in DC grid. And the control method of the proposed droop controller is explained particularly. In this paper, by applying the proposed control method to DC distribution system, propriety is verified through the simulation and the experiment.

A New Volt/Var Control of Substation for Distribution Volt/Var Regulation (배전계통 전압/무효전력조정을 위한 새로운 전압/무효전력제어 방식)

  • Choi, Joon-Ho;Kim, Jae-Chul;Son, Hag-Sig;Im, Tae-Hoon
    • Proceedings of the KIEE Conference
    • /
    • 2001.07a
    • /
    • pp.285-288
    • /
    • 2001
  • In this paper we proposed the on line volt/var control schemes of the load Tap Changer (LTC) transformer and shunt capacitor bank for distribution volt/var regulation. In the existing volt/var control of the distribution substation, the voltage of feeders and var of distribution systems is mainly controlled by the LTC transformer tap position and on/off status of the shunt capacitor. The LTC and shunt capacitor bank has discrete operation characteristics and therefore it is very difficult to control volt/var at the distribution networks within the satisfactory levels. Also there is limitation of the operation times of the LTC and shunt capacitor bank because it is affects on their functional lifetime. The proposed volt/var control algorithm determine an optimal tap position of LTC and on/off status of shunt capacitors at a distribution network with the multiple feeders. The mathematical equations of the proposed method are introduced. Simple case study was performed to verify the effectiveness of the proposed method.

  • PDF

An Estimating System for the CO2 Emissions using Discrete Event Simulation (이산 사건 시뮬레이션을 활용한 건설공정 CO2 배출량 추정 시스템)

  • Yi, Chang-Yong;Gwak, Han-Seong;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.196-197
    • /
    • 2014
  • Low carbon construction is an important operation management goal such as cost, time, and quality in construction community. This paper introduces a system which measures the variability of carbon dioxide amounts. First, this system allows creating construction operation models of which the level of detail is breakdown into the work task level. Second, the system implements sensitivity analysis along with a ranges of resources that are allocated in an operation model. It facilitates to find the optimal resource combination using the operation performances such as the amount of emissions, operation completion time, and cost. Lastly, it identifies the best fit probability distribution functions of performance criteria given a certain resource combination. It allows project manager to query the percentages to complete the operation within a limitation specified by the system users.

  • PDF

Control and Operation of a Small Scale Distributed Energy System (소규모 분산에너지시스템의 제어구조 및 운전 (마이크로터빈 중심))

  • Hong, Won-Pyo;Cho, Hoon-Jae
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.1139_1141
    • /
    • 2009
  • Distributed Generation (DG) is predicted to play a important role in electric power system in the near future. insertion of DG system into existing distribution network has great impact on real-time system operation and planning. It is widely accepted that micro turbine generation (MTG) systems are currently attracting lot of attention to meet customers need in the distributed power generation market In order to investigate the performance of MT generation systems, their efficient modeling is required. This paper presents the modeling and simulation of a MT generation system suitable for grid-connected operation. The system comprises of a permanent magnet synchronous generator driven by a MT. A brief description of the overall system is given, and mathematical models for the MT and permanent magnet synchronous generator are presented. Also, the use of power electronics in conditioning the power output of the generating system is demonstrated. Simulation studies with MATLAB/Simulink have been carried out in grid-connected operation mode of a DG system. The control strategies for grid connected operation mode of DG system is also presented.

  • PDF

A Study on the Operation Method of Packaging System to Enhance Logistics Efficiency

  • Jung, Sung-Tae
    • KOREAN JOURNAL OF PACKAGING SCIENCE & TECHNOLOGY
    • /
    • v.24 no.2
    • /
    • pp.73-84
    • /
    • 2018
  • This study sought efficiency of collaboration between manufacturers and distributors by finding a way to improve logistics efficiency in order to save distribution cost and standardize packaging together with profit generation by way of simple-display packaging in discount stores. For the study purpose, the impact of products with RRP (Retail Ready Packaging) by each discount store on the collaboration achievement such as loading efficiency was observed. From this observation, an alternative packaging system that can improve logistics efficiency between manufacturers and distributors was sought and the role of distributors in distribution standardization was explored. The purpose of this study also includes suggesting some implications on future basic direction of environment-friendly management. If this study would induce distributors to have more interest in distribution standardization and if logistics efficiency would be enhanced by the operation of packaging system considered of compatibility with pallets, this study would have academic significance and create practical values.

Insulation Design of Distribution Systems in Case of the Stroke of Direct Lightning Surge (직격뢰 침입시 배전계통 절연설계)

  • 정채균;김상국;이종범;서재호
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.53 no.4
    • /
    • pp.238-247
    • /
    • 2004
  • This paper describes the insulation coordination scheme of line in distribution system when the direct lightning surge strikes. The BIL that is applied to distribution system is not properly considered the performance and operation of arresters. Because of that, the high BIL is being used at partial system. This paper variously analyses the lightning overvoltage of line and equipment with earth of overhead grounding wire and installation types of arrester. From these result. authors examine the rationality of BIL.

An Auto-drawing Algorithm for the Single Line Diagram of Distribution Systems (배전선로 회선별단선도 자동생성 알고리즘)

  • Son, Ju-Hwan;Lim, Seong-Il
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.5
    • /
    • pp.854-859
    • /
    • 2010
  • Distribution Automation System(DAS) is designed to improve operational efficiency by acquisition and control of remote data using its components such as central computation units, communication network and feeder remote terminal units. A conventional human machine interface of the DAS adopts a schematic diagram which is made by drawing power equipments on the geographic information system map. The single line diagram is more useful than the schematic diagram for the main tasks of distribution system operation such as protective relay coordination, service restoration and loss minimization. Since the configuration of the distribution line is changed according to the relocation of the open tie switches, the auto-drawing algorithm based on the connection between the sections and the switches is an essential technique. This paper proposes a new auto-drawing algorithm for a single line diagram of distribution systems based on tertiary tree and collision avoidance method. The feasibility of the proposed algorithm has been testified for various cases using practical distribution system with 12 feeders.

Methodology of 22.9 ㎸ HTS Gable application for practical distribution system in metropolitan area (22.9 ㎸ 초전도 케이블의 대도심 배전계통 적용방안)

  • 윤재영;김종율;이승렬
    • Proceedings of the Korea Institute of Applied Superconductivity and Cryogenics Conference
    • /
    • 2003.10a
    • /
    • pp.49-52
    • /
    • 2003
  • As the power demand has increased, it is expected that the transmission system will have more complicated problems under the influence of investment reduction for overall power system. The route length per MW demand will be reduced gradually from 0.6[C-km/㎿] to 0.53 [C-km/㎿] in 2010. This comes up to a real serious problem of system planning and operation viewpoints HTS power technologies have properties to solve these complex transmission and distribution constraints, especially for metropolitan area, in the future. As the HTS technology has developed, the HTS cable technology can be the most effective alternative to solve the future expected transmission constraints as compared with other countermeasures in terms of economics, environments and system operation. This paper describes the general application methodology of developing 22.9 ㎸ HTS cable by CAST for practical distribution system, particularly, step-by-step application methodology of 22.9 ㎸ HTS cable to substitute the existing and planning 154 ㎸ cable. In this scheme, almost of the downtown 154 ㎸ substation of metropolitan city such as Seoul will be changed into 22,9 ㎸ switching station.

  • PDF

Analysis of Surge in Distribution System and ESS due to Direct Lightning in Distribution System with ESS using EMTP (EMTP를 이용한 ESS가 연계된 배전계통에서 직격뢰 발생 시 계통 및 ESS 측의 서지 해석)

  • Seo, Hun-Chul
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.29 no.2
    • /
    • pp.47-53
    • /
    • 2015
  • The study concerning about the grid connection of the large-capacity energy storage system(ESS) is increasing. However, the transient study such as lightning or switching surge necessarily occurred at power system with ESS has been hardly performed. Therefore, this paper performs the analysis of lightning surge in distribution system with ESS using electromagnetic transient program(EMTP). The battery model in Matlab/Simulink is modeled by EMTP, which is the specialized software for power system transient study. Also, the bi-directional power electronics for interconnection of the battery and distribution system are modeled by EMTP. When the lightning is occurred at interconnection point of ESS, this paper simulates the existence of ESS and operation conditions of ESS and analyzes the surge in distribution system and ESS according to the various conditions.

A New Method for Assessing Dynamic Reliability for the Mid-loop Operation (원전의 부분충수운전에 대한 동적 신뢰도평가)

  • 제무성;박군철
    • Journal of the Korean Society of Safety
    • /
    • v.11 no.2
    • /
    • pp.52-59
    • /
    • 1996
  • This paper presents a new approach for assessing the dynamic reliability in a complex system such as a nuclear power plant. The method is applied to a dynamic analysis of the potential accident sequences which may occur during mid-loop operation. Mid-loop operation is defined as an operation to make RCS water level below the top of the flow area of the hot legs at the junction with the reactor vessel for repairs and maintenance of steam generators and reactor coolant pumps for a specific time. The Idea behind this approach consists of both the use of the concept of the performance achievement/requirement correlation and of a dynamic event tree generation method. The assessment of the system reliability depends on the determination of both the required performance distribution and the achieved performance distribution. The quantified correlation between requirement and achievement represents a comparison between two competing variables. It is demonstrated that this method is easily applicable and flexible in that it can be applied to any kind of dynamic reliability problem.

  • PDF