지중 배전계통 적용을 위한 광복합 케이블 실시간 감시시스템 개선 (An Improvement of Optical Fiber Composite Power Cable On-Line Monitoring System for Underground Distribution Network)

  • 조진태;김주용;이학주;박중성
    • 조명전기설비학회논문지
    • /
    • 제26권7호
    • /
    • pp.77-83
    • /
    • 2012
  • Since power system is switching to smart grid, on-line monitoring technology has become necessary for underground distribution power cable. Therefore, the application of DTS(Distributed Temperature Sensing) technology using OFCPC(Optical Fiber Composite Power Cable) capable of monitoring underground distribution power cables has been developed. These can bring about reductions in faults and increases in operating capacity of underground distribution system. To date, the test-bed of optical fiber composite power cable on-line monitoring system has been constructed. Then, matters to be improved have been drawn through verification experiments. This paper presents the improvement and experiment results of the optical fiber composite power cable on-line monitoring system to apply to underground distribution lines in the field.

초전도케이블이 병입된 계통의 고장에 대한 보호협조 검토기법 (A study result on coordinative protection method of HTS cable implemented distribution system)

  • 이현철;양병모;이근준
    • 전기학회논문지
    • /
    • 제60권4호
    • /
    • pp.700-704
    • /
    • 2011
  • This paper proposes a coordinative protection study results of 22.9kV HTS(High-Temperature Superconducting) cable implemented distribution system. HTS cable can provide about 5 times larger transfer capacability compare to conventional XLPE cable, however, it has different heat characteristic so called quench. This paper presents the simulation results on Ichun substation HTS cable which connects main transformer and 22.9kV bus. Various expected fault cases are considered and discussed to examine whether conventional protection scheme is effective to protect both of existing facilities and HTS cable. With the results of simulation, conventional protection scheme can be used if instantaneous element and time inverse elements could be adjusted with proper time coordination. Internal temperatures of HTS cable conductor in safe region with proper protection without quench. This results are to be demonstrated by the field test and will be implemented in Ichon substation HTS cable protection and control system.

초전도기기를 적용한 미래 저압대용량 신 배전계통 (Future New Distribution System with Low voltage and Mass Capacity using HTS equipments)

  • 윤재영;김종율;이승렬
    • 한국초전도ㆍ저온공학회논문지
    • /
    • 제7권1호
    • /
    • pp.37-41
    • /
    • 2005
  • This paper describes the construction scheme of new distribution system using HTS(High Temperature Superconducting) power equipments such as cable, transformer and FCL(fault current limiter). At present, one of the most serious problems in distribution power system, especially for metropolitan complex city, is to obtain the ROW for cable line routes, space for downtown substations and satisfy the environmental protection caused by NIMBY phenomena. Unfortunately, it is expected that this situation will get more and more worse. As the HTS technology to apply in power system Is developed, HTS cable utilizing mass-capacity characteristic can be a useful countermeasure to overcome this problem. This paper describes the application methodology of 22.9kV HTS cable with low-voltage, mass-capacity characteristics replacing the 154kV conventional cable. By applying 22.9kV HTS cable, the HTS transformer with higher capacity for the reduction of space and transformer numbers of downtown substation is necessary. Also, if the leakage Impedance of HTS transformer is same as or lower than that of conventional transformer, the fault current of 22.9kV bus will increase because the HTS transformer capacity is larger than that of the conventional transformer. This means the parallel application of HTS-FCL to reduce the fault current in addition to the HTS cable and transformer can be necessary. With the basic construction scheme of new distribution system, this paper describes the future study points to realize this new distribution system using HTS equipments.

혼합 배전계통에서 피뢰기적용과 접지시스템 변경을 고려한 서지 해석에 관한 연구 (A Study on the Surge Analysis considering Surge Arrester and Grounding System in the Combined Distribution System)

  • 윤창섭;이종범;김병숙
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 제37회 하계학술대회 논문집 A
    • /
    • pp.204-205
    • /
    • 2006
  • This paper describes the protective ability of lightning arrestor in combined distribution system with power cable. To evaluate the protective ability, change of arrestor and grounding location are considered. On the other hand, arrestor developed by Cooper Power Systems for underground power cable system, is considered to evaluate surge protective ability as in underground system, when arrestor occurs failure has overhead line. The result shows that lightning arrestor in combined distribution system with power cable protect effectively when failure at arrestor in overhead line. On the other hand, arrestor developed by Cooper Power Systems for underground power cable system, is considered to evaluate surge protective ability in underground distribution system, when arrestor of overhead line has failure. The result shows that lightning arrestor installed in underground cable can effectively protected cables from surge when arrestor of overhead line has failure. And also even though grounding locations are decreased, it is revealed that protective ability is nearly similar.

  • PDF

해저케이블 매설심도 측정오차 저감 방법에 관한 연구 (A Study on the Method to Minimize Measuring Burial Depth Error for Submarine Cable)

  • 안용호;김용학;한정열;이유진;한병성
    • 전기학회논문지
    • /
    • 제61권2호
    • /
    • pp.329-334
    • /
    • 2012
  • The distribution submarine cables are normally used for power supply at island, which are mostly installed in the southern coast of KOREA, and partially installed in the west coast and Jeju-Island. There are two way of submarine cable burying system, buried and unburied type. Since 2003, KEPCO is entirely being constructing the distribution submarine cable by buried type. In this case, 'burial depth' is key index for evaluating the suitability of the buried situation. Therefore, the measurement accuracy of 'burial depth' is a big issue for burying system in the distribution submarine cable. This paper demonstrates the measurement error of burial depth that is affected by electrical factor such as grounding type of submarine cable in case of magnetic field detection method, and indicates the method to reduce the measurement error in buried type of distribution submarine cable system.

DTS를 활용한 광복합 지중 배전계통 실시간 감시시스템 개발 및 성능평가 (A Development and Performance Assessment of On-Line Monitoring System for Optical Fiber Composite Underground Distribution Network using DTS)

  • 조진태;김주용;이학주;조휘창;최명호
    • 조명전기설비학회논문지
    • /
    • 제25권6호
    • /
    • pp.115-121
    • /
    • 2011
  • Intelligent distribution equipment is inevitable to realize self-healing which is one of smart grid functions in distribution network. Therefore, most of distribution equipment have been developed with self diagnostic sensors. However, it is not effective to construct on-line monitoring system for underground distribution cable because of high cost and low sensitivity. Recently, optical fiber composite cable is being considered for communication and power delivery in order to cope with increasing communication in distribution network. This paper presents the design and performance assessment results of underground cable on-line monitoring system using DTS(Distributed Temperature Sensing) and optical fiber composite underground cable.

DC 혼합배전시스템에서 지중계통의 뇌과전압 해석 (Lightning Surge Analysis on Underground System in DC Combined Distribution System)

  • 안천용;이종범
    • 전기학회논문지
    • /
    • 제62권6호
    • /
    • pp.737-743
    • /
    • 2013
  • This paper describes the overvoltage through lightning surge analysis on underground system in DC combined distribution systems. It is considered that operating micro grid including distributed generation with smart grid can make possibility of composing new distribution system different from existing one. However, there are many papers about low voltage DC distribution in grids or buildings but not many about replacement or distributing 22.9kV AC distribution system to DC system. Among many research need for DC system development, overvoltage is studied in this paper. Overvoltage is simulated on DC cable when lightning strikes to overhead grounding wire which is installed at the nearest location from power cable section. Analysis as well as modeling is performed in EMTP/ATPDraw. It is evaluated that analysis results can be used to design of DC underground distribution power cable system.

ABC 배전 접속 시스템에 대한 연구 (The Research into Connecting System for Aerial Bundled Cable in Distribution Line)

  • 이용순;최경선;주종민;이철호
    • 한국전기전자재료학회:학술대회논문집
    • /
    • 한국전기전자재료학회 2001년도 하계학술대회 논문집
    • /
    • pp.495-498
    • /
    • 2001
  • The distribution line through which electricity is supplied from substation to customer generally varies by underground line and overhead line. In contrast that the underground line is shielded, the overhead lines do not have the shield layer. To overcome this weak point of the overhead lines, the aerial bundled cable(ABC) connection systems have been developed. The basic concept of the ABC connection system is the application of the underground cable system containing complete shield layer to the overhead cable system. The ABC system is the innovative technologies which enable the prevention of electric shocks, reduction of the maintenance charge and damage of the cable. This paper give a full detail of vertical connection system applied within a country.

  • PDF

저항형 초전도한류기의 미래 배전계통 적용방안 (Application Scheme of Resistive HTS-FCL on Future New Distribution System)

  • 이승열;김종율;김호용;윤재영
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제54권5호
    • /
    • pp.212-216
    • /
    • 2005
  • This paper describes the application scheme of resistive HTS-FCL(High Temperature Superconducting-Fault Current Limiter) on future new distribution system. Future new distribution system means the power system to which applies the 22.9kV HTS cable with low-voltage and mass-capacity characteristics replacing the 154kv conventional cable in addition to HTS transformer and HTS-FCL. The fault current of future new distribution system will increase greatly because of the inherent characteristics of HTS transformer/cable and applications of distributed generations and spot networks and so on. This means that the HTS-FCL is necessary to reduce the fault current below the breaking capacity. This paper studies the appropriate location, parameters and the influences of HTS-FCL on future new distribution system. Finally, this paper suggests the reasonable basic parameters of resistive HTS-FCL for future KEPCO new distribution system.

A Review of Strategy to Capture Niche Marketing of HTS Power Distribution Cable

  • Park, Sang-Bong;Nam, Kee-Young;Kim, Dae-Kyeong;Jeong, Seong-Hwan;Ryoo, Hee-Suk
    • KIEE International Transactions on Power Engineering
    • /
    • 제4A권1호
    • /
    • pp.11-17
    • /
    • 2004
  • It becomes difficult and high in cost to construct new ducts and/or tunnels for power cables in domestic areas. This paper presents possible strategy of an HTS distribution cables for distributing electric power in local areas as niche marketing. Reflected were its important distinction such as system configuration, rationale, establishment of strategy and considerably high economical efficiency compared with present underground cables. In this paper, applicable important items by using HTS distribution cables in water pumping powerhouse and distribution substation as example objective regions were reviewed. Based on this, the following items on distribution HTS system are examined. (I)A review of constructing a model system to introduce high temperature superconducting distribution cables to objective areas is presented. (2)The strategy to capture HTS distribution cable in water pumping powerhouse and distribution substation as niche marketing regions were reviewed. (3)In concrete, system configuration, rationale, establishment of strategy and considerably high economical efficiency are reviewed between existing cable and HTS one.