• Title/Summary/Keyword: Distribution System Planning

Search Result 673, Processing Time 0.027 seconds

Optimal Capacitor Placement in a Distribution System Considering Lifetimes of Devices (기기 수명을 고려한 배전계통 커패시터의 설치 계획)

  • Park, Jong-Young;Park, Jong-Keun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.2
    • /
    • pp.164-171
    • /
    • 2008
  • This paper proposes the planning method for placement of capacitors in a distribution system. The main objectives in the planning for capacitor allocation are the reduction of installation costs and electric power loss. In the proposed method, the life time of each device is considered in calculating installation costs, and the optimal operation status of devices is found by genetic algorithm. Then, the optimal numbers and locations are determined based on the optimal operation status. Simulation results in the 69-bus distribution system show that the proposed method performs better than conventional methods.

Renewable Power Generation Forecasting Method for Distribution System: A Review (배전시스템 운영계획을 위한 신재생에너지원 발전량 예측 방법)

  • Cho, Jintae;Kim, Hongjoo;Ryu, Hosung;Cho, Youngpyo
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.8 no.1
    • /
    • pp.21-29
    • /
    • 2022
  • Power generated from renewable energy has continuously increased recently. As the distributed generation begins to interconnect in the distribution system, an accurate generation forecasting has become important in efficient distribution planning. This paper explained method and current state of distributed power generation forecasting models. This paper presented selecting input and output variables for the forecasting model. In addition, this paper analyzed input variables and forecasting models that can use as mid-to long-term distributed power generation forecasting.

A Decision Support System for an Optimal Transportation Network Planning in the Third Party Logistics

  • Park, Yong-Sung;Choi, Hyung-Rim;Kim, Hyun-Soo;Park, Nam-Kyu;Cho, Jae-Hyung;Gang, Moo-Hong
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2006.10a
    • /
    • pp.240-257
    • /
    • 2006
  • In an effort to gain competitiveness, recently many companies are trying to outsource their logistics activities to the logistics specialists, while concentrating on their core and strategic business area. Because of this trend, the third party logistics comes to the fore, catching people's attention, and expanding its market rapidly. Under these circumstances, the third party logistics companies are making every effort to improve their logistics services and to develop an information system in order to enhance their competitiveness. In particular, among these efforts one of the critical parts is the decision support system for effective transportation network planning. To this end, this study has developed an efficient decision support system for an optimal transportation network planning by comprehensively considering the transportation mode, routing, assignment, and schedule. As a result of this study, the new system enables the expansion of the third party logistics companies' services including the multimodal transportation, not to mention one mode of transportation, and also gets them ready to plan an international transportation network.

  • PDF

Simultaneous Planning of Renewable/ Non-Renewable Distributed Generation Units and Energy Storage Systems in Distribution Networks

  • Jannati, Jamil;Yazdaninejadi, Amin;Talavat, Vahid
    • Transactions on Electrical and Electronic Materials
    • /
    • v.18 no.2
    • /
    • pp.111-118
    • /
    • 2017
  • The increased diversity of different types of energy sources requires moving towards smart distribution networks. This paper proposes a probabilistic DG (distributed generation) units planning model to determine technology type, capacity and location of DG units while simultaneously allocating ESS (energy storage systems) based on pre-determined capacities. This problem is studied in a wind integrated power system considering loads, prices and wind power generation uncertainties. A suitable method for DG unit planning will reduce costs and improve reliability concerns. Objective function is a cost function that minimizes DG investment and operational cost, purchased energy costs from upstream networks, the defined cost to reliability index, energy losses and the investment and degradation costs of ESS. Electrical load is a time variable and the model simulates a typical radial network successfully. The proposed model was solved using the DICOPT solver under GAMS optimization software.

Multiobjective Transportation Infrastructure Development Problems on Dynamic Transportation Networks (화물수송체계의 평가와 개선을 위한 다목적 Programming모델)

  • 이금숙
    • Journal of Korean Society of Transportation
    • /
    • v.5 no.1
    • /
    • pp.47-58
    • /
    • 1987
  • A commodity distribution problem with intertemporal storage facilities and dynamic transportation networks is proposed. mathematical integer programming methods and multiobjective programming techniques are used in the model formulation. Dynamic characteristics of commodity distribution problems are taken into account in the model formulation. storage facility location problems and transportation link addition problems are incorporated into the intertemporal multicommodity distribution problem. The model is capable of generating the most efficient and rational commodity distribution system. Therefore it can be utilized to provided the most effective investment plan for the transportation infrastructure development as well as to evaluate the existing commodity distribution system. The model determines simultaneously the most efficient locations, sizes, and activity levels of storage facilities as well as new highway links. It is extended to multiobjective planning situations for the purpose of generating alternative investment plans in accordance to planning situations. sine the investment in transportation network improvement yields w\several external benefits for a regional economy, the induced benefit maximization objective is incorporated into the cost minimization objective. The multiobjective model generates explicitly the trade-off between cost savings and induced benefits of the investment in transportation network improvement.

  • PDF

Active Distribution System Planning for Low-carbon Objective using Cuckoo Search Algorithm

  • Zeng, Bo;Zhang, Jianhua;Zhang, Yuying;Yang, Xu;Dong, Jun;Liu, Wenxia
    • Journal of Electrical Engineering and Technology
    • /
    • v.9 no.2
    • /
    • pp.433-440
    • /
    • 2014
  • In this study, a method for the low-carbon active distribution system (ADS) planning is proposed. It takes into account the impacts of both network capacity and demand correlation to the renewable energy accommodation, and incorporates demand response (DR) as an available resource in the ADS planning. The problem is formulated as a mixed integer nonlinear programming model, whereby the optimal allocation of renewable energy sources and the design of DR contract (i.e. payment incentives and default penalties) are determined simultaneously, in order to achieve the minimization of total cost and $CO_2$ emissions subjected to the system constraints. The uncertainties that involved are also considered by using the scenario synthesis method with the improved Taguchi's orthogonal array testing for reducing information redundancy. A novel cuckoo search (CS) is applied for the planning optimization. The case study results confirm the effectiveness and superiority of the proposed method.

A Study of Economic Generation Planning for operating Power systems with Dispersed Generation (분산형 전원의 배전계통 연계시 경제적 발전 계획 수립에 대한 연구)

  • Kim, Ji-Hong;Jung, Hyeon-Soo;Kim, Jin-O
    • Proceedings of the KIEE Conference
    • /
    • 1999.07c
    • /
    • pp.1453-1455
    • /
    • 1999
  • This paper presents an economical generation planning for operating power systems with dispersed generation. As dispersed generation introduced into an electric power distribution system, the power system will be complicated and have much variable aspects. So there is need for developing new generation scheduling. In this paper, the proposed method is tested for distribution system with two battery storage resources. Optimal generation planning of 15 thermal units in 24-hours is achieved by improved genetic algorithm. Also, to show its effectiveness, the results are compared with those of not including battery storage resources.

  • PDF

Methodology of 22.9 ㎸ HTS Gable application for practical distribution system in metropolitan area (22.9 ㎸ 초전도 케이블의 대도심 배전계통 적용방안)

  • 윤재영;김종율;이승렬
    • Proceedings of the Korea Institute of Applied Superconductivity and Cryogenics Conference
    • /
    • 2003.10a
    • /
    • pp.49-52
    • /
    • 2003
  • As the power demand has increased, it is expected that the transmission system will have more complicated problems under the influence of investment reduction for overall power system. The route length per MW demand will be reduced gradually from 0.6[C-km/㎿] to 0.53 [C-km/㎿] in 2010. This comes up to a real serious problem of system planning and operation viewpoints HTS power technologies have properties to solve these complex transmission and distribution constraints, especially for metropolitan area, in the future. As the HTS technology has developed, the HTS cable technology can be the most effective alternative to solve the future expected transmission constraints as compared with other countermeasures in terms of economics, environments and system operation. This paper describes the general application methodology of developing 22.9 ㎸ HTS cable by CAST for practical distribution system, particularly, step-by-step application methodology of 22.9 ㎸ HTS cable to substitute the existing and planning 154 ㎸ cable. In this scheme, almost of the downtown 154 ㎸ substation of metropolitan city such as Seoul will be changed into 22,9 ㎸ switching station.

  • PDF

A Multi-agent System based on Genetic Algorithm for Integration Planning in a Supply Chain Management (유전 알고리즘에 기반한 동적 공급사슬 통합계획을 위한 멀티 에이전트 시스템)

  • Park, Byung-Joo;Choi, Hyung-Rim;Kang, Moo-Hong
    • Journal of Intelligence and Information Systems
    • /
    • v.13 no.3
    • /
    • pp.47-61
    • /
    • 2007
  • In SCM (supply chain management), companies are pursuing a new approach through which overall functions within the supply chain, ranging from material purchase to production, distribution, and sales are designed, planned, and managed in an integrated way. The core functions among them are production planning and distribution planning. As these problems are mutually related, they should be dealt with simultaneously in an integrated manner. SCM is large-scale and multi-stage problems. Also, its various kinds of internal or external factors can, at any time, dynamically bring a change to the existing plan or situation. Recently, many enterprises are moving toward an open architecture for integrating their activities with their suppliers, customers and other partners within the supply chain. Agent-based technology provides an effective approach in such environments. Multi-agent systems have been proven suitable to represent domains such as supply chain networks which involve interactions among manufacturing organization, their customers, suppliers, etc. with different individual goals and propriety information. In this paper, we propose a multi-agent system based on the genetic algorithm that make it possible to integrate the production and distribution planning on a real-time basis in SCM. The proposed genetic algorithm produced near optimal solution and we checked that there is a great difference in the results between integrated planning and non-integrated planning.

  • PDF

The Development of Distribution Power Operating System using the Genetic Algorithm (유전자 알고리즘을 이용한 배전계통 운영시스템 개발)

  • Kim, Joon-Oh;Park, Chang-Ho;Lim, Sung-Il
    • Proceedings of the KIEE Conference
    • /
    • 2000.07a
    • /
    • pp.480-482
    • /
    • 2000
  • The KEPCO is developing the practical power distribution operating system. The system adopt Genetic Algorithm and will be used loss reduction, load balancing, service planning for large capacity load and various kinds of simulations in the distribution power system. This paper presents the some obstacles and solutions on practical simulation system development, and some problems that need more study.

  • PDF