• Title/Summary/Keyword: Discharge-duration curve

Search Result 58, Processing Time 0.026 seconds

Effects of Dams and Water Use on Flow Regime Alteration of the Geum River Basin (금강 유역의 댐과 물이용에 의한 유황의 변동특성 분석)

  • Kang, Seong-Kyu;Lee, Dong-Ryul;Moon, Jang-Won;Choi, Si-Jung
    • Journal of Korea Water Resources Association
    • /
    • v.43 no.4
    • /
    • pp.325-336
    • /
    • 2010
  • This study presents the alteration of flow regime by effects of dams and water use in the Geum River Basin. The surface water use rate and the Impounded Runoff (IR) index were examined to assess the pressure indicators of the flow alteration. We applied the flow duration curve, flow regime coefficient, flood and low-flow frequency analysis as well as Range of Variability Approach (RVA) to investigate the quantitative changes in natural flow regimes. The results indicate that the high flow decreased and low flow increased respectively compared to the natural flow regimes at eight gauging stations. The Geum river is regulated by 139 dams and reservoirs storing 24% of the annual mean discharge and has high surface water use rate of 36%. These indicators are main pressure factors to alter flow regimes.

A Method of Estimating the Volume of Exploitable Groundwater Considering Minimum Desirable Streamflow (최소하천유출량을 고려한 지하수 개발가능량 산정방안)

  • Chung, Il-Moon;Lee, Jeongwoo
    • The Journal of Engineering Geology
    • /
    • v.23 no.4
    • /
    • pp.375-380
    • /
    • 2013
  • The concept of safe yield places an emphasis on balancing groundwater withdrawal with groundwater recharge but ignores naturally occurring groundwater discharge. Because streams and their alluvial aquifers are closely linked in terms of water supply and water quality, to be properly understood and managed they must be considered together. Therefore, some districts in Kansas have reevaluated their safe-yield policies to account for natural groundwater discharge and stream-aquifer interactions by amending their safe-yield regulations to include a portion of baseflow as the minimum desirable streamflow (MDS). This study proposes a modified safe-yield policy in which the drought flow is chosen as the MDS. Baseflow separation was conducted from streamflow hydrograph and the results are presented as a flow-duration curve. The exploitable groundwater can be determined by subtracting MDS from the cumulative baseflow. This method was tested in the Musimcheon watershed, which was validated for streamflow using the SWAT-K model. The annually averaged exploitable groundwater in the whole watershed was estimated to be 86 mm. The exploitable groundwater amounts were also estimated for each subwatershed in the Musimcheon watershed.

Statistical significance test of polynomial regression equation for Huff's quartile method of design rainfall (설계강우량의 Huff 4분위 방법 다항회귀식에 대한 유의성 검정)

  • Park, Jinhee;Lee, Jaejoon;Lee, Sungho
    • Journal of Korea Water Resources Association
    • /
    • v.51 no.3
    • /
    • pp.263-272
    • /
    • 2018
  • For the design of hydraulic structures, the design flood discharge corresponding to a specific frequency is generally used by using the design storm calculated according to the rainfall-runoff relationship. In the past, empirical equations such as rational equations were used to calculate the peak flow rate. However, as the duration of rainfall is prolonged, the outflow patterns are different from the actual events, so the accuracy of the temporal distribution of the probability rainfall becomes important. In the present work, Huff's quartile method is used for the temporal distribution of rainfall, and the third quartile is generally used. The regression equation for Huff's quadratic curve applies a sixth order polynomial equation because of its high accuracy throughout the duration of rainfall. However, in statistical modeling, the regression equation needs to be concise in accordance with the principle of simplicity, and it is necessary to determine the regression coefficient based on the statistical significance level. Therefore, in this study, the statistical significance test for regression equation for temporal distribution of the Huff's quartile method, which is used as the temporal distribution method of design rainfall, is conducted for 69 rainfall observation stations under the jurisdiction of the Korea Meteorological Administration. It is statistically significant that the regression equation of the Huff's quartile method can be considered only up to the 4th order polynomial equation, as the regression coefficient is significant in most of the 69 rainfall observation stations.

Study of Spatiotemporal Variations and Origin of Nitrogen Content in Gyeongan Stream ( 경안천 내 질소 함량의 시공간적 변화와 기원 연구)

  • Jonghoon Park;Sinyoung Kim;Soomin Seo;Hyun A Lee;Nam C. Woo
    • Economic and Environmental Geology
    • /
    • v.56 no.2
    • /
    • pp.139-153
    • /
    • 2023
  • This study aimed to understand the spatiotemporal variations in nitrogen content in the Gyeongan stream along the main stream and at the discharge points of the sub-basins, and to identify the origin of the nitrogen. Field surveys and laboratory analyses, including chemical compositions and isotope ratios of nitrate and boron, were performed from November 2021 to November 2022. Based on the flow duration curve (FDC) derived for the Gyeongan stream, the dry season (mid-December 2021 to mid-June 2022) and wet season (mid-June to early November 2022) were established. In the dry season, most samples had the highest total nitrogen(T-N) concentrations, specifically in January and February, and the concentrations continued to decrease until May and June. However, after the flood season from July to September, the uppermost subbasin points (Group 1: MS-0, OS-0, GS-0) where T-N concentrations continually decreased were separated from the main stream and lower sub-basin points (Group 2: MS-1~8, OS-1, GS-1) where concentrations increased. Along the main stream, the T-N concentration showed an increasing trend from the upper to the lower reaches. However, it was affected by those of the Osan-cheon and Gonjiamcheon, the tributaries that flow into the main stream, resulting in respective increases or decreases in T-N concentration in the main stream. The nitrate and boron isotope ratios indicated that the nitrogen in all samples originated from manure. Mechanisms for nitrogen inflow from manure-related sources to the stream were suggested, including (1) manure from livestock wastes and rainfall runoff, (2) inflow through the discharge of wastewater treatment plants, and (3) inflow through the groundwater discharge (baseflow) of accumulated nitrogen during agricultural activities. Ultimately, water quality management of the Gyeongan stream basin requires pollution source management at the sub-basin level, including its tributaries, from a regional context. To manage the pollution load effectively, it is necessary to separate the hydrological components of the stream discharge and establish a monitoring system to track the flow and water quality of each component.

Estimation of Ecological Flow and Habitat Suitability Index at Jeonju-Cheon Upstream (전주천 상류부의 서식처 적합도 지수 및 생태유량 산정)

  • Kim, Kyeoung-Oh;Park, Young-Ki;Kang, Jae-Il;Lee, Byung-Suk
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.38 no.2
    • /
    • pp.47-55
    • /
    • 2016
  • In this study, WUA (Weighted Usable Area) based on the Instream Flow Incremental Methodology (IFIM) was calculated to determine ecological flow at JeonJu-Cheon by using River2D model. To calibrate River2D, simulation results for low flow conditions of River2D were compared with calibrated HEC-RAS simulation results and the optimum parameters were determined. The results were RMSE (0.18), NSE (0.71) and coefficient of determination (0.78) for velocity and RMSE (0.02), NSE (0.71), coefficient of determination (0.73) for water depth. The result shows that the model successfully simulates the water flows. A selected target fish species to build the habitat suitability index were composed of Zaccoplatypus and Coreoleuciscus splendidus. These species showed the highest occurrences over the past decade in f ish monitoring. Also, The WUA-Discharge curve was calculated with the suitability index in a medium flow conditions. From the result, WUA is changed according to flowrate. In the flowrate-WUA/A graph, ecological flow can be determined at $1.8{\sim}2.0m^3/s$ for Zaccoplatypus $2.0m^3/s$ and Coreoleuciscus splendidus $1.8m^3/s$ at JeonJu-Cheon upstream. When compared with flow-duration analysis, it is demonstrative that simulation results fitted ecological flow considering quantity of available habitat for each fish species.

A Methodology for the Estimation of Design Flood of a Small Watershed (소하천유역(小河川流域)의 계획홍수량(計劃洪水量) 산정방법(算定方法)의 개발(開發))

  • Yoon, Yong Nam;Ahn, Tae Jin
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.4 no.1
    • /
    • pp.103-112
    • /
    • 1984
  • This study is an effort to develop a series of empirical procedure for the determination of design flood for a small watershed based on the unit hydrograph theory. It is shown that a flood discharge of a watershed with a specific return period can be expressed as a product of its watershed area, rainfall factor, runoff factor and flood peak reduction factor. Since the procedures for the determination of rainfall factor and runoff factor were already developed in the previous study (13) a series of step-by-step procedure is devised to empirically determine the flood peak reduction factor in the present study. Using the methodology developed herein the 50-year design flood, which is of concern in the drainage of agricultural lands, is estimated for a watershed on upper Kyungan River and compared with the design floods by the existing methods now in use. The flood peak reduction factor was correlated with the dimensionless parameter consisted of the rainfall duration divided by the basin lag time, which was computed from the derived unit hydrographs by the method of moment. The unit hydrographs of various durations were synthesized by the method of build up and S-curve. A multiple correlation was also made between the basin lag time and the physiographic parameters of the watershed, i.e., the stream length and the average stream slope.

  • PDF

Prognosis in the Patients with Prolonged Extracorporeal Membrane Oxygenation

  • Kim, Tae-Hun;Lim, Cheong;Park, Il;Kim, Dong-Jin;Jung, Yo-Chun;Park, Kay-Hyun
    • Journal of Chest Surgery
    • /
    • v.45 no.4
    • /
    • pp.236-241
    • /
    • 2012
  • Background: Prolonged usage of extracorporeal membrane oxygenation (ECMO) may induce multi-organ failure. This study is aimed to evaluate prognostic factors in the patients with ECMO. Also, the prognosis of ECMO with Kidney Injury Network Scoring system is studied. Materials and Methods: From May 2005 to July 2011, 172 cases of ECMO were performed. The cases of perioperative use of ECMO were excluded. Renal failure patient and younger than 15 years old one were also excluded. As a result, 26 cases were enrolled in this study. Male patients were 15 (57.7%), and mean age was $56.57{\pm}17.03$ years old. Demographic data, ECMO parameters, weaning from ECMO, and application of continuous renal replacement therapy are collected and Acute Kidney Injury Network (AKIN) scores were evaluated just before ECMO and day 1, day 2 during application of ECMO. Results: Venoarterial ECMO was applied in 22 cases (84.6%). The reasons for applications of ECMO were cardiac origin in 21 (80.8%), acute respiratory distress syndrome in 4, and septic shock in 1 case. Successful weaning from ECMO was achieved in 15 cases (57.7%), and survival discharge rate was 9 cases (34.6%). Mean duration of application of ECMO was $111.39{\pm}54.06$ hours. In univariate analysis, myocarditis was independent risk factors on weaning failure. Using the receiver operating characteristic curve, level of hemoglobin on 24 hours after ECMO, and base excess on 48 hours after ECMO were showed more than 0.7. AKIN score was not matched the prognosis of the patients with ECMO. Conclusion: In our study, the prognosis of the patients with myocarditis was poor. Hemoglobin level at first 24 hours, and degree of acidosis at 48 hours were useful methods in relating with prognosis of ECMO. AKIN scoring system was not related with the prognosis of the patients. Further study for prognosis and organ injury during application ECMO may be needed.

The evaluation of wetland sustainability for constructing a washland and Its hydrologic effect to Upo wetland (천변저류지 조성에 따른 습지지속가능성 평가 및 우포늪에 미치는 수문학적 영향 평가)

  • Kim, Jae-Chul;Kim, Jin-Kwan;Kim, Sang-Dan
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.8 no.6
    • /
    • pp.137-148
    • /
    • 2008
  • There have been many cases of using wetlands as an alternative in controlling stormwater, treating mining leachate, and agricultural discharge, and so on, recently. The reality is, however, that the wetlands are not properly applicable because of the lack of enough longterm data for wetlands due to the difficulty of long-term monitoring. Therefore, this study tries to analyze the storage of Upo, Mokpo, Sajipo, and Jjokjibeul in Topyeong watershed using SWAT(Soil and Water Assessment Tool) model, one of the long-term runoff hydrologic model, for the purpose of generating the long-term data and analyzing the hydrologic behavior of wetlands based on the generated data. Also, the changes in runoff at the outlet are analyzed after applying the simulation of constructing washland in Topyeong watershed and the storage in Upo is analyzed. The result shows that the runoff at the outlet of the watershed is decreased in rainy season from July to August and increased in dry season from December to February. In addition, the analysis of Upo storage concludes that Upo can be influenced by the construction of the washland. The duration curve of washland is then analyzed in order to evaluate the wetland's sustainability in terms of washland and it appears that the runoff of washland is simulated to be less than that of the existing wetland. Moreover, runoffs of some washlands are simulated to be less even in wet season. These results lead to the fact that there should be further hydrologic management for constructed washland. Then, the changes in loads (TN and TP) because of constructing washland are analyzed. The result shows that the loads are reduced because of the construction. Also, the changes in loads due to the construction of buffer strips are analyzed to compare the load reductions caused by a washland. Finally, REMM model, a riparian management model, is applied to overcome the hydrologic ambiguousness of SWAT model, and then, the SWAT model results are compared to those of REMM.