• Title/Summary/Keyword: Discharge curve

Search Result 368, Processing Time 0.035 seconds

A Study on Discharge Estimation by Representative Parameter Method in Open Channels (개수로에서의 대표 매개변수 방법에 의한 유량산정에 관한 연구)

  • Choo, Tai Ho;Chae, Soo Kwon
    • Journal of Wetlands Research
    • /
    • v.14 no.4
    • /
    • pp.637-644
    • /
    • 2012
  • The discharge estimation that means the most important element in a wetlands ecosystem and rivers is a prime concern. All the interim, this discharge estimation depends on stage-discharge curve, but the limitation of stage-discharge curve that uses only connection between the stage and discharge is widely well known. Thus, this paper proposed a method of discharge estimation in a section through "representative parameter estimation method" by using Manning and Chezy equations that have been extensively used in an open channel. Each result is presented by both RMSE and Discrepancy Ratio. The scale difference for the results between laboratory and natural open channel data existed, but the each result showed that the estimated discharge agree with the measured discharge. If the verification and improvement are conducted in various rivers through continuous study, the easy and rapid discharge estimation will be possible. So, the proposed method will be utilized in the water resources fields.

Development of a Stream Discharge Estimation Program (자연하천 유량산정 프로그램 개발)

  • Lee Sang Jin;Hwang Man Ha;Lee Bae Sung;Ko Ick Hwan
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.48 no.1
    • /
    • pp.27-38
    • /
    • 2006
  • In this study, we developed a program to estimate discharge efficiently considering major hydraulic characteristic including water level, river bed, water slope and roughness coefficient in a natural river. Stream discharge was measured at Gongju gauge station located in the down stream of the Daechung Dam during normal and dry seasons from 2003 to 2004. The developed model was compared with the results from the existing rating curve at T/M gage stations, and was used for runoff analyses. Evaluating the developed river discharge estimation program, it was applied during 1983-2004 that base flow separation method and RRFS (Rainfall Runoff Forecasting System) which is based on SSARR (Streamflow Synthesis And Resevoir Regulation). The result presents the stage-discharge curve creator range at the Gong-ju is overestimated by approximately $10-20\%$, especially at the low stage. It is attributed to the hydraulic characteristics at the study. The discharge simulated by the RRFS and base flow separation, which is calibrated using the measurement at the early spring and late fall season during relatively d]v season, shows the least errors. The coefficient of roughness at Gongju station varied with the high and low water level.

Improvement of the Method using the Coefficient of Variation for Automatic Multi-segmentation Method of a Rating Curve (수위-유량관계곡선의 자동구간분할을 위한 변동계수 활용기법의 개선)

  • Kim, Yeonsu;Kim, Jeongyup;An, Hyunuk;Jung, Kwansue
    • Journal of Korea Water Resources Association
    • /
    • v.48 no.10
    • /
    • pp.807-816
    • /
    • 2015
  • In general, the water stage-discharge relationship curve is established based on the assumptions of linearity and homoscedasticity. However, the relationship between the water stage and discharge is affected from geomorphological factors, which violates the basic assumptions of the water stage-discharge relationship curve. In order to reduce the error due to the violations, the curve is divided into several sections based on the manager's judgement considering change of cross-sectional shape. In this research, the objective-splitting criteria of the curve is proposed based on the measured data without the subjective decision. First, it is assumed that the coefficient of variation follows the normal distribution. Then, if the newly calculated coefficient of variation is outside of the 95% confidential interval, the curve is divided. Namely, the groups is divided by the characteristics of the coefficient of variation and the reasonable criteria is provided for establishing a multi-segmented rating curve. To validate the proposed method, it was applied to the data generated by three artificial power functions. In addition, to confirm the applicability of the proposed method, it is applied to the water stage and discharge data of the Muju water stage gauging station and Sangegyo water stage gauging station. As a result, it is found that the automatically divided rating curve improves the accuracy and extrapolation accuracy of the rating curve. Finally, through the residual analysis using Shapiro-Wilk normality test, it is confirmed that the residual of water stage-discharge relationship curve tends to follow the normal distribution.

A Stochastic Analysis of the Water Quality on the Basin of Soyang River with Discharge Variation (유량변동에 따른 소양강유역 수질의 통계학적 해석)

  • Choi, Han-Kyu;Baek, Kyung-Won;Choi, Yong-Mook;Choi, Jin-Woo
    • Journal of Industrial Technology
    • /
    • v.21 no.B
    • /
    • pp.233-240
    • /
    • 2001
  • This research was conducted with the aim of efficiently managing large scale of rivers such like Songyang-river through predicting water quality change with analyzing the characteristics of the flowing in nutrients and pollutants. The main result will be used as basic data for effectively operating reservoirs through controling water quality and quantity. The relationship between quantity of flow and water quality was analyzed and pollution loading into the basin was estimated. Three areas of Soyang-river upstream and one area of Suip-cheon in Yanggu-gun were selected as research sites. Flow and water quality were measured simultaneously. The relation between quantity of discharge and pollution concentration and between quantity of discharge and pollution loading were analyzed by statistical method, respectively. We provided a rating curve through measuring quantity of discharge(collecting quantity of discharge) and pollutograph and pollution loading curve through water quality data. Also, we analyzed the correlation between quantity of discharge per unit area and pollution loading per unit area in each basin. As resurt of this research, Buk-cheon spot revealed an excellent first grade water quality for the items including $BOD_5$, DO, and SS. The correlation coefficient between Buk-cheon spot's quantity of discharge and pollution loading was 0.896~0.996, showing the validity of analysis applying correlation curve formula of quantity of discharge and pollution loading in the same spot. Also, pollution loading per unit area of the items including $BOD_5$, COD, DO, SS, T-N, T-P increased as the area of basins get increased following the sequence of Buk-cheon, Suip-cheon, Naelin-cheon spots.

  • PDF

A Study of Sediment Discharge and Bed Change Characteristics of the Local Rivers in Korea (국내 지방하천의 유사량과 하상변동 특성에 관한 연구)

  • Son, Hogeun;Lee, Jungsik;Shin, Shachul;Moon, Changgeon
    • Journal of the Korean GEO-environmental Society
    • /
    • v.15 no.6
    • /
    • pp.31-39
    • /
    • 2014
  • The objective of this study is to suggest the proper sediment transport equation and short and long-term bed change for planning and implementing the river management in Korea. To analyze total sediment discharge and short and long-term bed change, existing sediment transport equations, HEC-RAS 4.1 and CCHE2D numerical models were applied in urban and mountainous rivers. The results of this study are as followings; Firstly, the modified Einstein equation showed the most appropriate result for the estimation of total sediment discharge in the local rivers. Secondly, The stage-discharge relation curve and the discharge-total sediment discharge relation curve were suggested to examine the characteristics of river bed change. Finally, it is founded that river bed change of mountainous river has occurred greater than that of the urban river, and the river bed of urban river now tends to be stabilized on the whole.

A Study on the Temporal Variation of Hydraulic Characteristics by the Stage-Discharge Relation Curve - at Jeokpogyo, Jindong of the Nakdong River - (수위-유량 관계곡선을 이용한 경년별 수리특성량 변동에 관한 연구 - 낙동강 적포교(赤浦橋) 및 진동(津洞) 지점을 중심으로 -)

  • Lee, Jae-Joon;Seol, Ji-Su;Kwak, Chang-Jae
    • Journal of Korea Water Resources Association
    • /
    • v.42 no.10
    • /
    • pp.867-876
    • /
    • 2009
  • In this study, the stage-discharge relation curve made in 2006 is selected with standard curves to seize the hydraulic and geometric characteristics for the temporal variation of the river bed. The relationships among the standard stage-discharge relation curve and the existing stage-discharge relation curves, water level, cross sectional area, and flow velocity are analyzed. Jeokpogyo and Jindong which are the key station of Nakdong river are chosen for the study, with respect to the current river bed to convert the existing stage-discharge curves. The relationships for conversion of previous data, between water level and flow velocity are got. Also the relation equation between water level and cross sectional area and water level, flow velocity are derived. These conversion relationships shows good agreement between observed values and estimated values. It will be very useful to convert past hydraulic quantitations to current one.

Application of Load Duration Curve and Estimation of Delivery Ratio by Flow Durations Using Discharge-Load Rating Curve at Jiseok Stream Watershed (유량-부하량관계식을 이용한 지석천 유역의 부하지속곡선 적용 및 유황별 유달율 산정)

  • Park, Jinhwan;Kim, Kapsoon;Hwang, Kyungsup;Lee, Yongwoon;Lim, Byungjin
    • Journal of Korean Society on Water Environment
    • /
    • v.29 no.4
    • /
    • pp.523-530
    • /
    • 2013
  • This study has been carried out to clarify the characteristics of discharge and pollutant loading according to flow conditions at jiseok stream watershed (JSW). A flow rate and pollutant load in the study watershed were estimated by equation of stage-discharge and discharge-loads rating curve. By using the methods above, I've evaluated the water quality (WQ) of the JSW if it is satisfied with the standard target. I've collected the data of BOD and T-P from the JSW every 8 days for the duration of 12 months. And then, I've schematized the data upon the load duration curve and the results showed me that the WQ of JSW was satisfied with the standard target. I've also collected the same data every each day for the duration of 12 months from JSW and have schematized the data again. And the results showed that it also was satisfied with the standard target. To be concluded, I've determined that point pollution sources of JSW gives more significant impacts to the WQ than non-point pollution sources of JSW and hence, as time goes, point pollution sources will keep depriciating the WQ of JSW. Therefore, further efforts will be required to JSW to maintain the WQ.

Analysis of Stream Discharge Characteristic at Control Point for Runoff Model Application (유출모의를 위한 주요제어지점 유량특성 분석)

  • Lee, Sang-Jin;Lee, Bae-Sung;Ryoo, Kyong-Sik;Hwang, Man-Ha
    • Journal of Korea Water Resources Association
    • /
    • v.39 no.11 s.172
    • /
    • pp.905-914
    • /
    • 2006
  • For an accurate rainfall-runoff simulation in the river basin, not evaluation of runoff model but accurate runoff data are very important. In this study, SSARR model was applied to the Geum River basin and these results are compared with runoff data observed at the Gongju gauging station. The model results didn't good fit the discharge data determined from the rating curve at Gongju gauging station during normal and dry season, especially. For the reliability analysis for the existing rating curve, we observed new stream discharge set from 2003 to 2005. We also estimated long term runoff data from the base flow separation method and defined the hydraulic characteristics. The results show that the new observed stream discharge is similar to the rainfall-runoff model results but existing rating curve seems to be overestimated about 10-20% during normal and dry season. We found that the continuous monitoring and update for the existing rating curve at the gaging station are needed for accurate estimation of runoff data.

Discharge Characteristics of AC-PDPs with a grooved front dielectric layer

  • Jeong, Jin-Hee;Lim, Jong-Lae;Kim, Oe-Dong;Choi, Kwang-Yeol;Yoo, Eun-Ho
    • 한국정보디스플레이학회:학술대회논문집
    • /
    • 2005.07b
    • /
    • pp.1266-1268
    • /
    • 2005
  • The influence of the grooved dielectric layer on discharge and luminous characteristics has been investigated for various depths of the groove to achieve a high luminance efficiency AC-PDP operated at a lower voltage. We use the voltagethreshold curve technique and address delay jitters to explain the discharge characteristics. It shows that the surface discharge voltage rely on the depth of the grooved dielectric layer. Vertical discharge voltage remains almost the same as the groove depth increases. The influence of the grooved dielectric layer on discharge and luminous characteristics has been investigated for various depths of the groove to achieve a high luminance efficiency AC-PDP operated at a lower voltage. We use the voltagethreshold curve technique and address delay jitters to explain the discharge characteristics. It shows that the surface discharge voltage rely on the depth of the grooved dielectric layer. Vertical discharge voltage remains almost the same as the groove depth increases.

  • PDF

A Method of Rating Curve Adjustment (수위유량곡선보정방법에 대하여)

  • 박정근
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.18 no.2
    • /
    • pp.4116-4120
    • /
    • 1976
  • With the use of many rivers increased nearly to the capacity, the need for information concerning daily quantities of water and the total annual or seasonal runoff has became increased. A systematic record of the flow of a river is commonly made in terms of the mean daily discharge Since. a single observation of stage is converted into discharge by means of rating curve, it is essential that the stage discharge relations shall be accurately established. All rating curves have the looping effect due chiefly to channel storage and variation in surface slope. Loop rating curves are most characteristic on streams with somewhat flatter gradients and more constricted channels. The great majority of gauge readings are taken by unskilled observers once a day without any indication of whether the stage is rising or falling. Therefore, normal rating curves shall show one discharge for one gauge height, regardless of falling or rising stage. The above reasons call for the correction of the discharge measurements taken on either side of flood waves to the theoretical steady-state condition. The correction of the discharge measurement is to consider channel storage and variation in surface slope. (1) Channel storage As the surface elevation of a river rises, water is temporarily stored in the river channel. There fore, the actual discharge at the control section can be attained by substracting the rate of change of storage from the measured discharge. (2) Variation in surface slope From the Manning equation, the steady state discharge Q in a channel of given roughness and cross-section, is given as {{{{Q PROPTO SQRT { 1} }}}} When the slope is not equal, the actual discharge will be {{{{ { Q}_{r CDOT f } PROPTO SQRT { 1 +- TRIANGLE I} CDOT TRIANGLE I }}}} may be expressed in the form of {{{{ TRIANGLE I= { dh/dt} over {c } }}}} and the celerity is approximately equal to 1.3 times the mean watrr velocity. Therefore, The steady-state discharge can be estimated from the following equation. {{{{Q= { { Q}_{r CDOT f } } over { SQRT { (1 +- { A CDOT dh/dt} over {1.3 { Q}_{r CDOT f }I } )} } }}}} If a sufficient number of observations are available, an alternative procedure can be applied. A rating curve may be drawn as a median line through the uncorrected values. The values of {{{{ { 1} over {cI } }}}} can be yielded from the measured quantities of Qr$.$f and dh/dt by use of Eq. (7) and (8). From the 1/cI v. stage relationship, new vlues of 1/cI are obtained and inserted in Eq. (7) and (8) to yield the steady-state discharge Q. The new values of Q are then plotted against stage as the corrected steadystate curve.

  • PDF